Datacenter in Norway is available for mining, originally a colocation center with certified technician from Uptime Institute, but also focus on mining. Extremely high security with NOKAS as partner. Green energy from hydropower. Our power prices are the best worldwide. Minimum load is 150kw.

Check links!

http://www.trollmountain.com/

https://www.youtube.com/watch?v=aTjF2hJiack
 

Do not hesitate to contact me for an good offer -  eirik.sobye@trollmountain.com


Title: Re: Norwegian Datacenter
Post by: cryptb on January 15, 2018, 01:33:16 PM
Datacenter in Norway is available for mining, originally a colocation center with certified technician from Uptime Institute, but also focus on mining. Extremely high security with NOKAS as partner. Green energy from hydropower. Our power prices are the best worldwide. Minimum load is 150kw.

Check links!

http://www.trollmountain.com/

https://www.youtube.com/watch?v=aTjF2hJiack
 

Do not hesitate to contact me for an good offer -  eirik.sobye@trollmountain.com


I think that cost of electicity in Norway is very high. What is the actual price of 1kw ?


Title: Re: Norwegian Datacenter
Post by: Vi Ngoc Thao on January 15, 2018, 02:01:22 PM
Datacenter in Norway is available for mining, originally a colocation center with certified technician from Uptime Institute, but also focus on mining. Extremely high security with NOKAS as partner. Green energy from hydropower. Our power prices are the best worldwide. Minimum load is 150kw.

Check links!

http://www.trollmountain.com/

https://www.youtube.com/watch?v=aTjF2hJiack
 

Do not hesitate to contact me for an good offer -  eirik.sobye@trollmountain.com


I think that cost of electicity in Norway is very high. What is the actual price of 1kw ?

As the given information, power price is not very high due to they use green energy from hydropower


Title: Re: Norwegian Datacenter
Post by: Trolldatacenter on January 15, 2018, 05:00:50 PM
Aprox price on power is 4,50 eurocent pr kw.
Cheaper on bigger consumes.

Contact me and il get back to you with your price


Title: Re: Norwegian Datacenter
Post by: icanscript on January 15, 2018, 07:05:03 PM
I see only a beautiful site and visualization. Is this a project?
Nothing is built yet? If everything is so simple, why do not you upload a video with a real data center?


Title: Re: Norwegian Datacenter
Post by: Boer on January 15, 2018, 07:18:33 PM
Datacenter in Norway is available for mining, originally a colocation center with certified technician from Uptime Institute, but also focus on mining. Extremely high security with NOKAS as partner. Green energy from hydropower. Our power prices are the best worldwide. Minimum load is 150kw.

Check links!

http://www.trollmountain.com/

https://www.youtube.com/watch?v=aTjF2hJiack
 

Do not hesitate to contact me for an good offer -  eirik.sobye@trollmountain.com


I think that cost of electicity in Norway is very high. What is the actual price of 1kw ?

As the given information, power price is not very high due to they use green energy from hydropower

It's a bit more complex than that though. Norway exports most of its hydroelectric power :p


Title: Re: Norwegian Datacenter
Post by: Trolldatacenter on January 16, 2018, 09:02:18 AM
yes the cite in built and operation starts on monday. il post pictures on friday;)


I see only a beautiful site and visualization. Is this a project?
Nothing is built yet? If everything is so simple, why do not you upload a video with a real data center?


Title: Re: Norwegian Datacenter
Post by: cryptocropty on January 16, 2018, 09:09:52 AM
It's quite brave to have "Troll" in a user/product name in an online forum ;)


Title: Re: Norwegian Datacenter
Post by: Trolldatacenter on January 16, 2018, 09:47:17 AM
Hehehe thats true:)
If you had seen ouer location you would understand. hehe

It's quite brave to have "Troll" in a user/product name in an online forum ;)


Title: Re: Norwegian Datacenter
Post by: Florindvt on January 16, 2018, 02:47:45 PM
apart from the troll thing we might be interested. 150kw is a little high tho. 100kw might be better to start out.


Title: Re: Norwegian Datacenter
Post by: Trolldatacenter on January 16, 2018, 05:48:21 PM
Mail me and i fix 100kw space😊



apart from the troll thing we might be interested. 150kw is a little high tho. 100kw might be better to start out.


Title: Re: Norwegian Datacenter
Post by: icanscript on January 17, 2018, 08:01:11 AM
Potentially a good idea.
I will watch and wait for photos.


Title: Re: Norwegian Datacenter
Post by: Trolldatacenter on January 19, 2018, 11:03:18 AM
semd me and mail and il send you a reallife video.:)



Potentially a good idea.
I will watch and wait for photos.


Title: Re: Norwegian Datacenter
Post by: Trolldatacenter on January 24, 2018, 01:04:45 PM
https://www.youtube.com/watch?v=nCMdsY58X28&feature=youtu.be

This is us:)




semd me and mail and il send you a reallife video.:)



Potentially a good idea.
I will watch and wait for photos.