Bitcoin Forum

Economy => Service Announcements => Topic started by: operative11 on September 24, 2020, 07:30:36 PM



Title: World's Largest Bitcoin Mining Data-Center 180 MW Hosting @ 4c/kwh [Enegix]
Post by: operative11 on September 24, 2020, 07:30:36 PM
Hello everyone !

We have been building Bitcoin mining facilities since 2017. Today we announce the launch of our 3rd Bitcoin mining facility, the largest one-place Bitcoin mining data-center in the world, consisting of 8 hangars designed to host over 50,000 ASIC miners, with a total 180MW power consumption!

https://imgur.com/YmqXyss
https://imgur.com/1JOViqh
https://imgur.com/wocLmjs
https://imgur.com/N4T701E
https://imgur.com/NyGQaPu
https://imgur.com/WcMBjD6
Specially designed ventilation system maintains optimal temperature year-round, while consuming only about 4% of corresponding ASIC consumption.

We invite you to learn more about our team:
 - Video intro to company: https://www.youtube.com/watch?v=ndsB7wMDW0E
 - Video 180 MW facility drone technical tour: https://youtu.be/0tKVUObOTtk
 - Video Site visit interview with our CEO and representatives of ViaBTC, BTC.com, Canaan and Innosilicon: https://youtu.be/sVLCWhQyhzg
 - Coindesk brief: https://www.coindesk.com/bitcoin-mining-facility-rigs-kazakhstan

You can buy miners directly from us and start mining immediately.
Wholesale hosting prices at 4 cents per kwh.

Legalized status of cryptocurrency mining in Kazakhstan: https://cointelegraph.com/news/kazakhstan-sets-eyes-on-top-3-spot-for-global-bitcoin-mining
"Unlike other countries in Central Asia, the Kazakh government has de facto legalized crypto mining, which makes the market more attractive for both local and foreign players."

Be sure to follow us on Twitter!
https://twitter.com/EnegixLLC
More info at www.enegix.net
Telegram group: https://t.me/enegix