Bitcoin Forum

Bitcoin => Hardware => Topic started by: Scot_SJI on December 03, 2022, 11:32:28 PM



Title: The New Digital Shovel M300 Minipod
Post by: Scot_SJI on December 03, 2022, 11:32:28 PM
We build these in Toronto Canada, and we have units in stock and ready to ship within 1-2 weeks of selecting options.

https://www.youtube.com/watch?v=wbr2C32bpQc


Title: Re: The New Digital Shovel M300 Minipod
Post by: Skot on December 06, 2022, 06:22:27 PM
Those look cool, I like the smart PDU with CTs on every branch.

I think we have different interpretations of "mini" though!


Title: Re: The New Digital Shovel M300 Minipod
Post by: Scot_SJI on December 17, 2022, 04:37:56 AM
Thanks! Our old units use to be a single assembly that was 3MW. The modular blocks make it possible to do smaller builds. We are also coming out with a 150KW unit that can take 208V power.