Bitcoin => Mining => Topic started by: Godlovesyou on April 04, 2023, 04:39:38 AM



Title: Mine a total of 598
Post by: Godlovesyou on April 04, 2023, 04:39:38 AM
Bitcoin miner CleanSpark mined a total of 598 BTC in March alone while setting up new operations in Washington! This is amazing, I wonder what instruments is applying to cash up such a big fish.

https://www.btctimes.com/news/cleanspark-releases-bitcoin-mining-update-for-march-2023


Title: Re: Mine a total of 598
Post by: paid2 on April 04, 2023, 09:02:56 AM
Cleanspark are saying on their website that they use 100% green energy to mine Bitcoin

I wonder if it's true or not. I am always sceptical with this kind of affirmations.

But yeah, with an hashrate of 6.7 Eh/s, they should have a lot of blocks  ;D


Title: Re: Mine a total of 598
Post by: LoyceMobile on April 04, 2023, 09:05:42 AM
Cleanspark are saying on their website that they use 100% green energy to mine Bitcoin

I wonder if it's true or not. I am always sceptical with this kind of affirmations.
Washington has a lot of hydropower, which (in general) is one of the cheapest energy sources. So it makes perfect sense to use it.


Title: Re: Mine a total of 598
Post by: safar1980 on April 04, 2023, 12:21:46 PM
Washington Expansion. (https://in.investing.com/news/cleanspark-releases-march-2023-bitcoin-mining-update-432SI-3584353) The Washington expansion is a passively cooled data center consisting of four primary buildings. Once fully complete, the expansion will hold about 15,000 Antminer S19j Pro+ machines. Total capacity in Washington is expected to be 86MW, the majority of which is sourced from low-carbon, on-grid energy.  Building 1 is complete and ready for miners. Racks are currently being installed in Building 2. The foundation was recently poured for Building 3, while concrete deliveries are imminent for Building 4. Scott Garrison, vice president of business development, is leading the expansion.

what is low-carbon, on-grid energy in practice?



Title: Re: Mine a total of 598
Post by: philipma1957 on April 04, 2023, 12:29:55 PM
Washington Expansion. (https://in.investing.com/news/cleanspark-releases-march-2023-bitcoin-mining-update-432SI-3584353) The Washington expansion is a passively cooled data center consisting of four primary buildings. Once fully complete, the expansion will hold about 15,000 Antminer S19j Pro+ machines. Total capacity in Washington is expected to be 86MW, the majority of which is sourced from low-carbon, on-grid energy.  Building 1 is complete and ready for miners. Racks are currently being installed in Building 2. The foundation was recently poured for Building 3, while concrete deliveries are imminent for Building 4. Scott Garrison, vice president of business development, is leading the expansion.

what is low-carbon, on-grid energy in practice?



Could be 100% hydro. And understating it as low-carbon, on-grid energy just in case the grid feeds them some power from a gas plant occasionally .

8eh now and 16eh later.

Grow we must.  ;D