Title: [ANN] BVSHost bitcoin miner hosting (70$ to 75$ per KW) Post by: senseless on November 25, 2014, 01:48:33 PM BVS Services based on the outskirts of Cincinnati, Ohio is now accepting large clients for hosting. We currently have 500Kw of capacity available for immediate delivery with a minimum order quantity of 1 rack.
Features
Features Under Development
Facility Details: Power: Strictly 240V Fans: We currently have 3 belt driven 48" intake fans and one motor driven 36" exhaust fan with ports for 2 additional exhaust fans to be installed. Airflow: Air cycles every 15 minutes currently and air is no more than 10 degrees above ambient. We can add additional fans in <48 hours when it's deemed necessary. Pricing: Hosting for 1 to 12 units : $75/kW/mo Hosting for 12+ units : $70/kW/mo (billable in 12kW lots) Notes: If you require a different power configuration in terms of number of outlets or power availability per rack it is available on custom order. Lead time EST 2-3 weeks. Additional discounts are offered for prepaid contract periods. Payment Options: Bitcoin Bank Wire Paypal / Credit Card For more information or to order you may contact me directly via PM, skype (tsenseless) or email (tom[at]bvs-host[dot]com) http://i58.tinypic.com/2wrosc9.jpg http://i60.tinypic.com/b4c5ep.jpg Title: Re: [ANN] BVSHost bitcoin miner hosting (70$ to 75$ per KW) Post by: senseless on December 18, 2014, 01:18:52 PM Pricing reduced -- Have immediate capacity for 500kW Title: Re: [ANN] BVSHost bitcoin miner hosting (70$ to 75$ per KW) Post by: senseless on December 23, 2014, 05:18:38 AM Our space is much larger than other datacenter spaces I've seen on BCT. We don't need to duct our air as we have a large enough ceiling that the heat rises and gets exhausted via fans mounted in the roof. We've designed our datacenter to be hot/cold isle and possible for us to enclose either the hot or cold isle if we desire / decide to do so in the future. Currently we are maintaining density low enough that heat is not an issue. Currently intake on the units is around 40F and we have to leave heaters on so the water pipes don't freeze.
New Pictures: main disconnect switches from external transformer http://i60.tinypic.com/fz2mq.jpg 1000KVA Step-down transformer http://i58.tinypic.com/wafshu.jpg main disconnect switches feeding sub-breakers http://i57.tinypic.com/2s0bpec.jpg Load centers with sub-breakers feeding each rack http://i62.tinypic.com/szvosz.jpg Rack power plugs and load center with sub-breakers http://i60.tinypic.com/a9ld0m.jpg A row of racks http://i62.tinypic.com/14m3yq8.jpg |