@cloudstrife07 - I never thought of that. Maybe its time I find a data centre solution to mitigate the power risk.
Anyway, I wonder how some people can do mining at home, unless they changed the meter to 3 phase, changed the Distribution Box and additional wiring.
For nomal 1 phase meter home:
1 home socket = 13A.
1 rig 1200w = 5A.
so you can go max 2 rig per socket, unless u route the 20A MCB (mini circuit breaker) from the DB which is usually used for airconds to power your rigs.