Bitcoin Forum
May 28, 2024, 03:36:59 AM *
News: Latest Bitcoin Core release: 27.0 [Torrent]
 
  Home Help Search Login Register More  
  Show Posts
Pages: [1] 2 3 »
1  Alternate cryptocurrencies / Announcements (Altcoins) / Re: [ANN] [XDAG] Community Driven - First Mineable DAG | CPU Mining on: April 28, 2024, 08:07:34 AM

XDAG Community Developer Regular Meeting Minutes (35th)

On April 28, 2024, XDAG community developers held the 35th regular meeting. Participants communicated and arranged the recent development work of the community:

Ⅰ. Work review
1. Release XDAG V0.7.1, the upgrade matter includes:
a. Optimize the sync request algorithm, fix the sync process stuck problem, improve the sync speed, and greatly shorten the sync time.
b. Introduce a light mode for non-mining nodes, enabling vonsensus verification and data sync with reduced RAM consumption.
c. Fix the TX fee bug triggered by special circumstances.
2. Two community nodes have been successfully established. The related equal and solo mining pools are being debugged simultaneously and are planned to be officially launcheded lately.
3. Test the original XMRIG software to directly mine XDAG. The original XMRIG could be used in the future to mine XDAG.

Ⅱ. Follow-up work
1.Continue to develop the conversion of transfer fees from fixed rates to variable rates, and achieve transfer priority ordering of transfer rates; ;
2. Officially announce the community public nodes.

Ⅲ. Reaffirmation of principles
In order to maintain a fair and positive environment among nodes, the community reiterates that it will provide differentiated support for nodes that accept Apollo Consensus and implement donation plan, including: display and recommendation of community public media channels and technical support from community developers, etc.

Ⅳ. Participants:
Holt, Jake, Swordlet, Bill, June, Dikleres, iGod

XDAG Community Development Team

XDAG社区开发者例会会议纪要(第35次)

2024年4月27日,XDAG社区开发者召开了第35次例行会议,与会人员对社区近期开发工作进行了沟通及安排:

Ⅰ. 工作回顾
1.发布XDAG V0.7.1版本,升级内容包括:
a.优化同步请求算法,修复同步过程卡顿的问题,提高同步速度,大幅缩短同步耗时
b.为节点提供light模式,负责共识验证和同步数据的功能,大幅降低运行内存消耗
c.修复特殊情况触发的手续费BUG
2.成功搭建2个社区节点,相关的equal和solo矿池正在同步调试中,计划近期正式公布
3.测试原版XMRIG软件支持挖矿XDAG,后续用户可便捷的使用原版XMRIG挖XDAG

Ⅱ. 后续计划
1.持续推进转账手续费由固定转为可变,实现转账优先级排序;
2.正式公布社区公共节点

Ⅲ. 重申原则
为维护各节点间公平、积极的环境,社区重申将对接受阿波罗共识并执行阿波罗捐赠的节点进行差异化支持,包括: 社区公共媒体渠道的展示、推荐以及社区开发者的技术支持等

Ⅳ. 参会成员:
Holt, Jake, Swordlet, Bill, June, Dikleres, iGod

XDAG社区开发者团队
2024年4月28日
2  Alternate cryptocurrencies / Announcements (Altcoins) / Re: [ANN] [XDAG] Community Driven - First Mineable DAG | CPU Mining on: March 31, 2024, 08:32:29 AM
XDAG Community Developer Regular Meeting Minutes (34th)

March 31, 2024

On March 30, 2024, XDAG community developers held the 34th regular meeting. Participants communicated and arranged the recent development work of the community:

Ⅰ. Work review
1. The XDAG V0.7.0 Hummingbird upgrade was successfully completed, and the mainnet has been running smoothly, which has been fully recognized by community enthusiasts. Miners no longer need a proxy to connect to the mining pool, the hardware requirements for mining pool operation are further reduced, and the increase in handling fees makes the network more secure from attacking.
2. Promote the establishment of community public nodes and provide convenience for community enthusiasts to freely create mining pools.

Ⅱ. Follow-up plan
1. Start XRC-20 research and development work (updated to the community roadmap on official website).
2. Upgrade the transfer fee from fixed to variable to prioritize transfers and lay the foundation for the implementation of XRC-20 (updated to the community roadmap).
3. Try to promote XMRig mining software to support XDAG algorithm.
4. Announce community public nodes.

Ⅲ. Participants:
Holt, Jake, Swordlet, Bill, June, Dikleres, iGod, Edward, Christopher, FSOL


XDAG Community Developer Team

XDAG社区开发者例会会议纪要(第34次)

2024年3月30日,XDAG社区开发者召开了第34次例行会议,与会人员对社区近期开发工作进行了沟通及安排:

Ⅰ. 工作回顾
1.成功完成XDAG V0.7.0蜂鸟升级,主网平稳运行至今,得到了社区爱好者们的充分肯定。矿工不再需要代理连接矿池,矿池运行的硬件要求进一步降低,手续费的增加使得网络更加安全;
2.推动搭建社区公共节点,为社区爱好者自由创建矿池提供便利

Ⅱ. 后续计划
1.开启XRC-20研发工作(已更新至社区路线图);
2.将转账手续费由固定转为可变,实现转账优先级的排序,为实现XRC-20打下基础(已更新至社区路线图);
3.尝试推动XMRig软件支持XDAG算法;
4.公布社区公共节点

Ⅲ. 参会成员:
Holt, Jake, Swordlet, Bill, June, Dikleres, iGod, Edward, Christopher, FSOL

XDAG社区开发者团队
2024年3月31日
3  Alternate cryptocurrencies / Announcements (Altcoins) / Re: [ANN] [XDAG] Community Driven - First Mineable DAG | CPU Mining on: March 12, 2024, 12:22:30 PM
XDAG V0.7.0 Mainnet Upgrade Announcement

After three rounds of public testing in the community, the XDAG V0.7.0 mainnet upgrade is ready. The relevant work arrangements for the upgrade are as follows:
Ⅰ Upgrade time
Start time: March 16th 12:00 (UTC+0)
Ending time: subject to announcement (estimated to be 3 hours)
Snapshot data: Data at 12:00 on March 16, 2024 (UTC+0)
Upgraded version: XDAGj-V0.7.0

Ⅱ Impact Assessment
This mainnet upgrade will have the following impacts:
A. Wallet users:
Clear historical transfer data before the wallet snapshot time point
B. Trading platform:
Please stop the node running in advance and upgrade to version 0.7.0 later.  If the trading platform adopts the transfer reserve deposit method, please process the user's account application before the main network upgrade time to avoid disputes.

Ⅲ Upgrade content
1. Separation of mining pools and nodes
2. Mining pools are removed from the whitelist and users can build their own mining pools.
3.Set a 0.1 transfer fee
4. According to the consensus reached by the community Apollo project, 5% of the node main block donation will be implemented to support community.

Ⅳ Other matters
1. Mainnet services will be suspended during the upgrade.
2. Problem feedback channels
 Discord:
 https://discord.com/channels/394430409376792576/1216751197466136616
 XDAG Github RP:
 https://github.com/XDagger/xdagj/issues

XDAG V0.7.0主网升级公告

经过社区三轮公测后,XDAG V0.7.0主网升级工作已准备就绪,现就升级相关工作安排如下:
Ⅰ 升级时间
开始时间:3月16日 12:00(UTC+0)
结束时间:以公告为准(预计3个小时)
快照数据:   2024年3月16日12:00(UTC+0)数据
升级版本:XDAGj-V0.7.0

Ⅱ 影响评估
此次主网升级将有以下影响:
A.钱包用户:
清除钱包快照时间点之前的历史转账数据
B.交易平台:
请提前停止节点运行,并在后续升级0.7.0版本。若交易平台采用转账备注入账方式,请在主网升级时间前处理用户入账申请,以免发生纠纷。

Ⅲ 升级内容
1.矿池与节点分离
2.矿池去白名单,用户可自行搭建矿池
3.设置0.1转账手续费
4.按照社区阿波罗方案达成的共识,执行5%节点主块捐赠以支持社区建设

Ⅳ 其他事项
1. 升级期间暂停主网服务
2. 问题反馈渠道
Discord:
https://discord.com/channels/394430409376792576/1216751197466136616
XDAG Github RP:
https://github.com/XDagger/xdagj/issues
4  Alternate cryptocurrencies / Announcements (Altcoins) / Re: [ANN] [XDAG] Community Driven - First Mineable DAG | CPU Mining on: February 25, 2024, 02:34:20 PM
XDAG Community Developers Regular Meeting Minutes (33rd)

On February 24, 2024, XDAG community developers held the 33rd regular meeting. Participants communicated and arranged the recent development work of the community:

Ⅰ. Work review
1. Successfully completed the second and third rounds of public testing of XDAG version 0.7.0;
2. Fix various problems reported during the public beta;
3. Discuss the community incentive model.

Ⅱ. Follow-up plan
1. Start the final confirmation work after fixing the public beta issues of version 0.7.0 and start preparing for the mainnet upgrade;
2. In view of the contributions made by community developers to version 0.7.0, it is planned to launch a special crowdfunding donation task to encourage community developers.

Ⅲ. Participants:
Holt, Jake, Swordlet, June, Dikleres, iGod, Edward, Christopher

XDAG Community Developer Team

XDAG社区开发者例会会议纪要(第33次)

2024年2月24日,XDAG社区开发者召开了第33次例行会议,与会人员对社区近期开发工作进行了沟通及安排:

Ⅰ. 工作回顾
1.顺利完成XDAG 0.7.0版本第2轮及第3轮公测;
2.修复公测过程中反馈的各项问题;
3.讨论社区激励模式。

Ⅱ. 后续计划
1.开始0.7.0版本公测问题修复后的最终确认工作并着手准备主网升级;
2.针对社区开发者为0.7.0版本所做的贡献,计划开启专项众筹捐赠任务以激励社区开发者。

Ⅲ. 参会成员:
Holt, Jake, Swordlet, June, Dikleres, iGod, Edward, Christopher

XDAG社区开发者团队
2024年2月25日
5  Alternate cryptocurrencies / Announcements (Altcoins) / Re: [ANN] [XDAG] Community Driven - First Mineable DAG | CPU Mining on: February 17, 2024, 02:03:12 PM
XDAG version 0.7.0 third round of public beta announcement

Dear community members, the third round of open beta in the community is now open. We hope that everyone will actively participate in this open beta.  The public beta matters are arranged as follows:

Ⅰ Basic information
Time:
February 17th 14:00 (UTC) - February 24th 14:00 (UTC)
Version:
XDAG 0.7.0
Testnet browser:
https://testexplorer.xdag.io/

Ⅱ Verification content
1. Freely build a mining pool (newly added).
 Community members can freely build mining pools through github steps.  Reference steps for building a mining pool:

https://github.com/swordlet/xdagPool/blob/develop/xdagj_pool_run_doc.pdf

2. Ordinary users can verify the transfer and mining functions.  Each transfer is charged a fixed fee of 0.1 XDAG (wallet balance > 0.1) for the transfer amount;
3. The mining pool owner verifies the mining pool functions: miner connection, mining, computing power estimation, cumulative reward calculation, distribution and other mining pool functions.  The mining reward distribution method of the mining pool is changed to be distributed every 5 minutes, and the miner's cumulative reward will be transferred out after >3 XDAG.


Ⅲ Precautions
1. Please be sure to strictly distinguish the mainnet and testnet environments, do not confuse the two data, and ensure the security of your mainnet wallet
2. If you find any problems or bugs during the testing process, please feedback to

https://discord.com/channels/394430409376792576/1194211004477870194

XDAG 0.7.0版本第三轮公测公告

各位社区成员,现开启社区第三轮公测,希望大家积极参与此次公测。公测事项安排如下:

Ⅰ 基本信息
时间:
2月17日 14:00 (UTC) - 2月24日 14:00 (UTC)
版本:
XDAG 0.7.0
测试网浏览器:
https://testexplorer.xdag.io/

Ⅱ 验证内容
1.自由搭建矿池(新增)。
社区成员可以通过github步骤自由搭建矿池。矿池搭建参考步骤:
https://github.com/swordlet/xdagPool/blob/develop/xdagj_pool_run_doc.pdf

2.普通用户验证转账及挖矿功能。每次笔转账收取 0.1 XDAG固定手续费(钱包余额>0.1)转账金额;
3.矿池主验证矿池功能:矿工连接、挖矿、算力估算、累积奖励计算、发放等矿池等功能。矿池挖矿奖励分配方式改为每5分钟分配一次,矿工累积奖励>3 XDAG后转出。


Ⅲ 注意事项
1. 请务必严格区分主网及测试网环境,不要混淆两者数据,确保自己主网钱包安全
2. 测试过程中发现任何问题BUG,请反馈至
https://discord.com/channels/394430409376792576/1194211004477870194
6  Alternate cryptocurrencies / Announcements (Altcoins) / Re: [ANN] [XDAG] Community Driven - First Mineable DAG | CPU Mining on: February 06, 2024, 08:05:20 AM
Announcement of XDAG 0.7.0 Version 2nd Public Testing

Dear community members, the second round of public beta is now launching. We hope that everyone will actively participate in this public beta. The public beta is arranged as follows:

Ⅰ Basic information
Time:
February 6th 08:00 (UTC) - February 13th 08:00 (UTC)
Version: XDAG 0.7.0
Testnet browser:
https://testexplorer.xdag.io/

Ⅱ How to participate
1. Wallet transfer
A. XDAG-Pro wallet adjusts the network to TestNet
B. XDAG GoWallet old wallet changes the RPC address to:
https://testnet-rpc.xdagj.org

2. Mining by miners
Link to the following test mining pool address:
testpool.xdagpool.com:3003

Ⅲ Verification content:
1. Ordinary users can verify the transfer and mining functions. Each transfer is charged a fixed fee of 0.1 XDAG (wallet balance > 0.1) for the transfer amount;
2. The mining pool owner verifies the mining pool functions: miner connection, mining, hashrate estimation, cumulative reward calculation, distribution and other mining pool functions. The mining reward distribution method of the mining pool is changed to be distributed every 5 minutes, and the miner's cumulative reward will be transferred out after >3 XDAG.


Ⅳ Precautions
1. Please be sure to strictly distinguish the mainnet and testnet environments, do not confuse the two data, and ensure the security of your mainnet wallet;
2. If you find any problems or bugs during the testing process, please feedback to
https://discord.com/channels/394430409376792576/1194211004477870194

XDAG 0.7.0版本第二轮公测公告

各位社区成员,现开启社区第二轮公测,希望大家积极参与此次公测。公测事项安排如下:

Ⅰ 基本信息
时间:
2月6日 08:00 (UTC) - 2月13日 08:00 (UTC)
版本:
XDAG 0.7.0
测试网浏览器:
https://testexplorer.xdag.io/

Ⅱ 参与方式
1.钱包转账
A. XDAG-Pro钱包调整网络为TestNet
B. XDAG GoWallet老钱包修改RPC地址为:
https://testnet-rpc.xdagj.org

2.矿工挖矿
链接以下测试矿池地址:
testpool.xdagpool.com:3003

Ⅲ 验证内容:
1.普通用户验证转账及挖矿功能。每次笔转账收取 0.1 XDAG固定手续费(钱包余额>0.1)转账金额;
2.矿池主验证矿池功能:矿工连接、挖矿、算力估算、累积奖励计算、发放等矿池等功能。矿池挖矿奖励分配方式改为每5分钟分配一次,矿工累积奖励>3 XDAG后转出。


Ⅳ 注意事项
1. 请务必严格区分主网及测试网环境,不要混淆两者数据,确保自己主网钱包安全
2. 测试过程中发现任何问题BUG,请反馈至
https://discord.com/channels/394430409376792576/1194211004477870194
7  Alternate cryptocurrencies / Announcements (Altcoins) / Re: [ANN] [XDAG] Community Driven - First Mineable DAG | CPU Mining on: January 28, 2024, 07:07:22 AM
XDAG Community Developers Regular Meeting Minutes (32nd)

On January 27, 2024, XDAG community developers held the 32nd regular meeting. Participants communicated and arranged the recent development work of the community:

 Ⅰ. Work review
1. Successfully listed $XDAG on XeggeX and NonKYC trading platforms (www.xeggex.com www.nonkyc.io);
2. Successfully completed the first round of public testing of XDAG version 0.7.0.

 Ⅱ. Follow-up plan
1. Optimize and improve the problems found in the first round of public testing;
2. Discuss and determine the key test content of the second round of public beta;
3. Plan to launch the second round of public testing in the near future.

Ⅲ. Participants:
Holt, Jake, Swordlet, June, Dikleres, iGod, Edward

 XDAG Community Developer Team

XDAG社区开发者例会会议纪要(第32次)

2024年1月27日,XDAG社区开发者召开了第32次例行会议,与会人员对社区近期开发工作进行了沟通及安排:

Ⅰ. 工作回顾
1.成功登陆XeggeX及NonKYC交易平台;
2.顺利完成XDAG 0.7.0版本第一轮公测。

Ⅱ. 后续计划
1.优化完善第一轮公测中发现的问题;
2.讨论确定第二轮公测重点测试内容;
3.计划近期开启第二轮公测。

Ⅲ. 参会成员:
Holt, Jake, Swordlet, June, Dikleres, iGod, Edward

XDAG社区开发者团队
2024年1月28日
8  Alternate cryptocurrencies / Announcements (Altcoins) / Re: [ANN] [XDAG] Community Driven - First Mineable DAG | CPU Mining on: January 08, 2024, 01:48:34 PM
XDAG Community Developers Regular Meeting Minutes (31st)

On December 30, 2023, XDAG community developers held the 31st regular meeting. Participants communicated on the recent development work of the community:

Ⅰ. Work review
1. Complete the code development work for XDAG independent mining pool and node transfer fees, main block donation and other functions;
2. Complete developers testing work;
3. Assist new trading platforms (Xeggex & Nonkyc.io ) to complete technical docking.

Ⅱ. Follow-up plan
1. Community public beta will be launched soon
2. Continue to improve and optimize the new version of node and mining pool code
3. Discuss the docking details with XDAG Hub contributors and advance the XRC-20 and AMM protocol initiatived by the Community on this June.
4. Promote the release of the Linux version of XDAG Pro, and follow up plans to support the built-in browser function.

Ⅲ. Participants:
Holt, Jack, Swordlet, June, Dikleres, Bill, Hans, Mind, iGod, Christopher

XDAG Community Developer Team

XDAG社区开发者例会会议纪要(第31次)

2023年12月30日,XDAG社区开发者召开了第31次例行会议,与会人员对社区近期开发工作进行了沟通:

Ⅰ. 工作回顾
1. 完成XDAG独立矿池及节点转账手续费、主块捐赠等功能的代码开发工作;
2. 完成开发者测试工作;
3. 协助Xeggex及NonKYC交易平台完成技术对接

Ⅱ. 后续计划
1.近期开启社区公测
2.持续完善优化新版本节点及矿池代码
3.与XDAG Hub贡献者讨论对接细节,推动社区在今年6月份发布的XRC-20与AMM协议。
4.推进XDAG Pro发布Linux版本,后续计划支持内置浏览器功能

Ⅲ. 参会成员:
Holt, Jack, Swordlet, June, Dikleres, Bill, Hans, Mind, iGod, Christopher

XDAG社区开发者团队
2023年12月31日
9  Alternate cryptocurrencies / Announcements (Altcoins) / Re: [ANN] [XDAG] Community Driven - First Mineable DAG | CPU Mining on: December 03, 2023, 07:14:51 AM
XDAG Community Developers Regular Meeting Minutes (30th)

On December 2, 2023, XDAG community developers held their 30th regular meeting. Participants communicated on the recent development work:

Ⅰ. Work review
1. The code development work for the XDAG node transfer fee function has been completed and the function is currently under internal testing;
2. The code development work for the basic functions of the XDAG independent mining pool has been completed, and internal testing of the functions is currently underway;
3. Assist the new trading platforms to complete technical docking.

Ⅱ. Recent plans
Continue to optimize the code and improve the interface of nodes and mining pools. After completing the internal testing of functions and performance, we plan to officially launch the community public beta version.

Ⅲ. Participants:
Holt, Jack, Swordlet, June, Dikleres, Bill, iGod, Christopher

XDAG community developer team


XDAG社区开发者例会会议纪要(第30次)

2023年12月2日,XDAG社区开发者召开了第30次例行会议,与会人员对社区近期开发工作进行了沟通:

Ⅰ. 工作回顾
1. 已完成XDAG节点转账手续费功能的代码开发工作,目前正在进行功能内测;
2. 已完成XDAG独立矿池基础功能的代码开发工作,目前正在进行功能内测;
3. 协助交易平台完成技术对接

Ⅱ. 近期计划
继续对节点及矿池进行代码优化及接口完善,计划完成功能及性能内测后,正式开启社区公测

Ⅲ. 参会成员:
Holt, Jack, Swordlet, June, Dikleres, Bill, iGod, Christopher

XDAG社区开发者团队
2023年12月3日
10  Alternate cryptocurrencies / Announcements (Altcoins) / Re: [ANN] [XDAG] Community Driven - First Mineable DAG | CPU Mining on: October 29, 2023, 02:45:50 PM
XDAG community developers Regular Meeting Minutes (29th)

At 21:30 on October 28, 2023, XDAG community developers held the 29th regular meeting. Participants communicated on the recent development work of the community:

Ⅰ. Work review
1. The donation of google browser plug-in wallet development tasks has been officially launched. Community enthusiasts are requested to respond actively to encourage developers;
2. Basic function development work of XDAG independent mining pool.

Ⅱ. Recent plans
Continue to promote the development of node mining pools, improve XDAG independent mining pool nodes and protocol communication between mining pools, and plan to start internal testing in the near future;

Ⅲ. Community Developer Statement
Regarding the potential psychological impact of the certain trading platform being hacked incident, community developers reiterated the bottom line and basic principles that need to be adhered to:
1. No one has the right to actively modify the main chain address data;
2. Community developers only maintain the unmodified main chain.

Ⅳ. Other matters
Participants:
Holt, Jack, Swordlet, Cherry, June, Dikleres, Bill, iGod, Dr.Wang, Christopher

 XDAG community developer team
 October 29, 2023

XDAG社区开发者例会会议纪要(第29次)

2023年10月28日晚21:30,XDAG社区开发者召开了第29次例行会议,与会人员对社区近期开发工作进行了沟通:

Ⅰ. 工作回顾
1. 浏览器插件版钱包开发任务捐赠工作已正式开启,请社区爱好者们积极响应,以激励开发者;
2. XDAG独立矿池的基础功能开发工作。

Ⅱ. 近期计划
继续推进节点矿池开发工作,完善XDAG独立矿池节点、矿池间协议通讯,计划近期开始内测;

Ⅲ. 社区开发者声明
针对交易平台黑客事件对社区造成的潜在心理影响,社区开发者们重申需要坚守的底线和基本原则:
1. 任何人无权力主动修改主链地址数据;
2. 社区开发者只对无修改的主链进行维护。

Ⅳ. 其他事项
参会成员:
Holt, Jack, Swordlet, Cherry, June, Dikleres, Bill, iGod, Dr.Wang, Christopher

 XDAG社区开发者团队
  2023年10月29日

11  Alternate cryptocurrencies / Announcements (Altcoins) / Re: [ANN] [XDAG] Community Driven - First Mineable DAG | CPU Mining on: October 17, 2023, 02:05:42 PM
Crowdfunding for XDAG Hub

The XDAG community has the opportunity to make a major strategic move into Web 3.0, with a new XDAG extension project for Google chrome browser called "XDAG Hub"

State:
Funding

Target:
300,000 XDAG

Donate XDAG Address:
xDAGhub2spqwn3c2Nku7siTnqWuCGzmy

Period:
2023, October 17 at noon UTC to 2023, November 7 at noon UTC

Link:
https://medium.com/@XDAG_Community/crowdfunding-for-xdag-hub-a-chrome-extension-6d2e60442a00

XDAG Hub开发工作众筹公告

XDAG Hub谷歌浏览器插件将成为XDAG Web3生态系统的基础设施,现为该开发工作进行专项众筹,以激励开发者。

状态:
众筹进行中

目标:
300,000 XDAG

XDAG众筹地址:
xDAGhub2spqwn3c2Nku7siTnqWuCGzmy

众筹周期:
2023.10.17 - 2023.11.07 UTC

详细链接:
https://medium.com/@XDAG_Community/crowdfunding-for-xdag-hub-a-chrome-extension-6d2e60442a00
12  Alternate cryptocurrencies / Announcements (Altcoins) / Re: [ANN] [XDAG] Community Driven - First Mineable DAG | CPU Mining on: October 01, 2023, 06:05:48 AM
XDAG community Developer Regular Meeting Minutes (28th)

 At 21:30 of September 30, 2023, XDAG community developers held the 28th regular meeting. Participants communicated on the recent development:

Ⅰ. Work review
1. A new enthusiast has taken the initiative to apply to develop the Chrome plug-in wallet, and has well communicated with the community. Crowdfunding will be launched in the near future to encourage developers to contribute to the community;
2. Reconstruct the XDAG network protocol to improve synchronization efficiency;
3. Complete the development of node transfer fees and main block donation code;
4. XDAG co-branded the Eastern Football Club successfully completed its first Douyin live broadcast game, with about 20,000 live fans on the stadium and about 3,000  online viewers on Douyin. The next live broadcast will be held on October 2.

Ⅱ. Recent plans
Continue the separation of node mining pools, improve the basic function code of the XDAG independent mining pool and the network communication between nodes and mining pools. It is expected to complete the internal beta version by the end of October;

Ⅲ.Other matters
Participants:
Holt, Jack, Swordlet, June, Dikleres, Bill, iGod, Dr.Wang

 XDAG community developer team
 September 30, 2023

XDAG社区开发者例会会议纪要(第28次)

2023年9月30日晚21:30,XDAG社区开发者召开了第28次例行会议,与会人员对社区近期开发工作进行了沟通:

Ⅰ. 工作回顾
1. 有新爱好者主动申请承担Chrome插件版钱包开发工作,已同社区进行对接,近期将开启众筹工作以激励开发者为社区做出的贡献;
2. 对XDAG网络协议进行重构,提升同步效率;
3. 完成节点转账手续费以及主块捐赠代码的开发;
4. XDAG联名东方足球队成功完成首场抖音直播比赛,现场观众约2万人,抖音在线人数最高约3000人,下一场直播将在10月2日举行。

Ⅱ. 近期计划
继续推进节点矿池分离工作,完善XDAG独立矿池基础功能代码及节点、矿池间网络通讯,初步预计10月底完成内测版本;

Ⅲ.其他事项
参会成员:
Holt, Jack, Swordlet, June, Dikleres, Bill, iGod, Dr.Wang

 XDAG社区开发者团队
  2023年9月30日
13  Alternate cryptocurrencies / Announcements (Altcoins) / Re: [ANN] [XDAG] Community Driven - First Mineable DAG | CPU Mining on: August 25, 2023, 01:14:08 PM
XDAG V0.6.5 Mainnet Upgrade Announcement

 It's very pleased to inform the  community that after passing the community public beta, the XDAG V0.6.5 mainnet upgrade is ready, and the arrangements for the mainnet upgrade are as follows:
 Ⅰ Upgrade time
 Start time: 12:00, August 28 (UTC+0)
 End time: Undecided (expected 3 hours, subject to subsequent announcements)
 Start data: Data snapshot at 12:00 (UTC+0) on August 28, 2023
 Upgrade version: XDAGj-0.6.5

 Ⅱ Impact Assessment
 After the mainnet is upgraded to version 0.6.5, the following impacts will occur:
 Wallet users: no impact
 Miner users: no impact
 Trading platform: update trading platform node RPC call logic

 Ⅲ Upgrade content
1.Upgrade the synchronization method between nodes to optimize the synchronization time and data transmission volume;
2.Upgrade the data type of the balance and introduce the XAmount data type so that the minimum unit of the balance is 1 nano, that is, 1 XDAG = 10^9 nano;
3.Introduce MySQL database to store transaction history to enrich storage and query methods, and add RPC functions to make query transaction history more flexible and diverse.
 Ⅳ Other matters
1.This upgrade will start with the latest snapshot data, and the historical transaction data of the wallet address will be cleared;
2.Feedback channel
Discord: https://discord.com/channels/394430409376792576/1144553604204724335
 XDAGj Github RP: https://github.com/XDagger/xdagj/issues

XDAG V0.6.5主网升级公告

很高兴的通知社区成员,在通过社区公测后,XDAG V0.6.5主网升级工作已经准备就绪,现就主网升级事宜安排如下:
Ⅰ 升级时间
开始时间:8月28日 12:00(UTC+0)
结束时间:未定(预计3个小时,以后续公告为准)
启动数据:   2023年8月28日12:00(UTC+0)数据快照
升级版本:XDAGj-0.6.5

Ⅱ 影响评估
主网升级到0.6.5版本后,将有以下影响:
钱包用户: 无影响
矿工用户: 无影响
交易平台: 更新交易平台节点RPC调用逻辑

Ⅲ 升级内容
1. 对节点间的同步方法进行升级,以优化同步时间和数据传输量;
2. 对余额的数据类型进行升级,引入XAmount数据类型,使余额的最小单位为 1 nano,即 1 XDAG = 10^9 nano;
3. 引入MySQL数据库存储交易历史,以丰富存储和查询方式,并增加RPC函数,使查询交易历史更加灵活多样。
Ⅳ 其他事项
1. 本次升级会采用最新快照数据启动,钱包地址的历史交易数据将被清除;
2.问题反馈渠道
Discord:
https://discord.com/channels/394430409376792576/1144553604204724335
XDAGj Github RP:
https://github.com/XDagger/xdagj/issues
14  Alternate cryptocurrencies / Announcements (Altcoins) / Re: [ANN] [XDAG] Community Driven - First Mineable DAG | CPU Mining on: August 22, 2023, 09:32:12 AM
重大新闻:
XDAG-Pro钱包已经在IOS应用商店成功发布,IOS手机用户现在可以下载XDAG-Pro钱包了。

Big News:
XDAG-Pro wallet has been successfully released in the IOS App Store, and IOS mobile phone users can download XDAG-PRO wallet now.

https://apps.apple.com/hk/app/xdag-pro/id6458534585
15  Alternate cryptocurrencies / Announcements (Altcoins) / Re: [ANN] [XDAG] Community Driven - First Mineable DAG | CPU Mining on: August 13, 2023, 11:43:26 PM
XDAG V0.6.5 has released
https://github.com/XDagger/xdagj/tree/0.6.5
16  Alternate cryptocurrencies / Announcements (Altcoins) / Re: [ANN] [XDAG] Community Driven - First Mineable DAG | CPU Mining on: July 30, 2023, 12:53:53 PM
XDAG Community Developer Regular Meeting Minutes (26th)

At 21:30 on July 29, 2023, the developers of the XDAG community held the 26th regular meeting, and the participants communicated about the recent development work of the community:

Ⅰ. Work review
1. The application process of IOS developer account for publishing IOS version XDAG-pro is progressing smoothly;
2. Officially release the Windows desktop version of XDAG-pro:
https://github.com/XDagger/XDAG-Pro/releases/tag/1.0.20-21
3. The XDAG Proxy version is upgraded to V2.0.1 to improve proxy stability:
https://github.com/XDagger/xmrig2xdag/releases/tag/v2.0.1

Ⅱ. Short-term plans
1. Prepare to release XDAGj version 0.6.5 to meet the needs of the MEXC trading platform for node RPC, and further optimize the synchronization efficiency of main network nodes;
2. Adaptive development of the XDAG blockchain browser to match the release of XDAGj version 0.6.5;
3. The version of the XDAG node that increases the transaction fee is scheduled to be released after XDAGj version 0.6.5. At present, the separation of the mining pool is progressing smoothly. After the new mining pool goes online, the original XDAG proxy (X2X Proxy) will be discarded, and the connection to the proxy is no longer required for mining.

Ⅲ. Participants:
Holt, Jack, Swordlet, Bill, Cherry, Boom, iGod, Christopher

XDAG community developer team
July 30, 2023
17  Alternate cryptocurrencies / Announcements (Altcoins) / Re: [ANN] [XDAG] Community Driven - First Mineable DAG | CPU Mining on: July 22, 2023, 03:42:33 AM
XDAG Proxy has updated to V2.0.1 , Check here:
https://github.com/XDagger/xmrig2xdag/releases/tag/v2.0.1
18  Alternate cryptocurrencies / Announcements (Altcoins) / Re: [ANN] [XDAG] Community Driven - First Mineable DAG | CPU Mining on: July 09, 2023, 11:40:26 AM

Good news!XDAG Pro's new Desktop version wallet is released🥳
Let's download and try it:
https://github.com/XDagger/XDAG-Pro/releases/tag/1.0.20-21
19  Alternate cryptocurrencies / Announcements (Altcoins) / Re: [ANN] [XDAG] Community Driven - First Mineable DAG | CPU Mining on: July 03, 2023, 12:01:56 PM
XDAG Community Developer Regular Meeting Minutes (25th)

At 21:30 on the evening of July 1, 2023, the developers of the XDAG community held the 25th regular meeting, and the participants communicated about the recent development work of the community:

Ⅰ. Work Review
1. Successfully assist the new trading platform to complete the technical docking work;
2. Release XDAGj version 0.6.4 to solve and optimize the synchronization problem and efficiency of the main network nodes, and greatly reduce the synchronization time;
3. Start the XRC-20 and AMM protocol design work.

Ⅱ. Short-term plan
1. The code development of the XDAG node to increase the transfer fee has been completed, and the mining pool separation work has been started simultaneously. After the developer test is completed, the community public test is initially expected to be carried out in late July;
2. Start the new UI design and development of XDAG Pro PC version;
3. Continue the release procedure work of XDAG Pro wallet in the IOS app store. It is expected that the application for the IOS enterprise developer account will be completed in the near future, which will be a substantial step towards the successful release of the XDAG Pro IOS wallet.

Ⅲ. Participants:
Holt, Jack, Swordlet, Bill, Cherry, Boom, iGod, Christopher, FSOL

XDAG community developer team
July 3, 2023

XDAG社区开发者例会会议纪要(第25次)

2023年7月1日晚21:30,XDAG社区开发者召开了第25次例行会议,与会人员对社区近期开发工作进行了沟通:

Ⅰ. 工作回顾
1. 顺利协助交易平台完成技术对接工作;
2. 发布XDAGj 0.6.4版本,解决、优化主网节点同步问题及效率,大幅缩减同步时间;
3. 开启XRC-20及 AMM协议设计工作。

Ⅱ. 近期计划
1. 已完成XDAG节点增加转账手续费代码开发,并同步开始矿池分离工作,在完成开发者测试后,初步预计7月下旬进行社区公测;
2. 开始XDAG Pro PC版本新UI设计及开发工作;
3. 继续推进XDAG Pro钱包在IOS应用商店发布。预计近期能完成IOS企业开发者账号的申请,为成功发布XDAG Pro IOS版本钱包迈出实质性的一步。

Ⅲ.参会人员:
Holt, Jack, Swordlet, Bill, Cherry, Boom, iGod, Christopher, FSOL

 XDAG社区开发者团队
  2023年7月3日
20  Alternate cryptocurrencies / Announcements (Altcoins) / Re: [ANN] [XDAG] Community Driven - First Mineable DAG | CPU Mining on: May 30, 2023, 02:04:44 AM
XDAG Community Developer Regular Meeting Minutes (24th)

 At 21:30 on the evening of May 27, 2023, the developers of the XDAG community held the 24th regular meeting, and the participants communicated about the recent development work of the community:

 Ⅰ. Work review
 1. Completed the Crowdfunding Task of the Exchange listing fee and proceed the Exchange pre-listing work;
 2. Successfully listed XDAG on UUBiter trading platform.

 Ⅱ. Short-term plans
 1. Sorted out the plan of increasing transfer fees and mining pool separation from nodes, and preliminarily expected to complete code development by the end of June;
 2. Fully promote the release of the XDAG- Pro wallet in the IOS app store.  In order to solve the difficulty of releasing wallets on IOS, the community will try to establish a legal entity to meet the requirements for IOS enterprise developer accounts.  The legal entity and accounts mentioned will be under the supervision and management of the community self-government team.

 Ⅲ. Participants:
 Holt, Jack, Swordlet, Bill, Cherry, Boom, iGod, Christopher, Dr. Wang

 XDAG community developer team
 May 29, 2023


XDAG社区开发者例会会议纪要(第24次)

2023年5月27日晚21:30,XDAG社区开发者召开了第24次例行会议,与会人员对社区近期开发工作进行了沟通:

Ⅰ.工作回顾
1. 完成交易平台众筹任务,并开始推进平台对接工作;
2. 成功登陆UUBiter交易平台。

Ⅱ.近期计划
1. 梳理XDAG节点增加转账手续费及矿池分离工作思路,初步预计6月底完成代码开发工作;
2. 全力推进XDAG Pro钱包在IOS应用商店发布。为解决在IOS发布钱包的困难,社区将尝试成立相关组织以满足IOS企业开发者账号要求。对于所提到的组织、账号都将处于社区自治团队的监督、管理之下。

Ⅲ.参会人员:
Holt, Jack, Swordlet, Bill, Cherry, Boom, iGod, Christopher, Dr.Wang

 XDAG社区开发者团队
  2023年5月29日
Pages: [1] 2 3 »
Powered by MySQL Powered by PHP Powered by SMF 1.1.19 | SMF © 2006-2009, Simple Machines Valid XHTML 1.0! Valid CSS!