Bitcoin Forum
May 11, 2024, 06:15:18 AM *
News: Latest Bitcoin Core release: 27.0 [Torrent]
 
  Home Help Search Login Register More  
  Show Posts
Pages: [1]
1  Alternate cryptocurrencies / Announcements (Altcoins) / 💡[ANN] Gigajoule - Floating Solutions💡 on: September 08, 2019, 07:37:21 PM


12345678910111213141516171819202122232425262728293031323334
ELECTRICITY IS A
CORNERSTONE TO ANY
COUNTRY’S GROWTH
AND POTENTIAL

12345

12345678910111213141516171819202122232425262728293031
An estimated 2 billion people worldwide do not have
access to electrical power, and this figure is increasing.

In countries like Nigeria, despite the abundance of
natural gas as feedstock, less than half of the population
has access to stable electricity supply.

Even where electrical transmission systems do exist, many
developing countries rely on costly and inefficient
substitute power generation systems.

These have negative impact both on the environment and
on sovereign finances and budgets as governments often
need to apply subsidies to make them affordable.



THE GIGAJOULE SOLUTION

123456789101112131415161718192021222324
Floating Power Plants (FPPs)
  • Natural gas-based power generation
  • Gas turbines mounted on barges
  • Can be deployed wherever there is access
    to the sea
  • Positioned in lagoons, rivers or harbours
  • Coupled to natural gas supply and the
    national transmission system
123456789101112131415161718192021222324
Natural Gas as Feedstock
  • Cleanest of all carbon-based energy
    sources
  • Gas associated with oil production
    (as in Nigeria) or LNG (Liquid Natural Gas)
123456789101112131415161718192021222324
Siemens SGT-A65 Gas Turbines
  • State-of-the-art turbine technology
  • Aeroderivative engines
  • Modularized with generators and mounted
    in pairs on barges


123456789101112131415161718192021222324


AIRCRAFT-ENGINE POWER
GENERATION


Gigajoule uses the Siemens Trent turbine
as its primary power unit. At its core is
the same Rolls-Royce engine that is found
on the Boeing 777 and Airbus A380 aircraft,
providing enhanced reliability for long-range
flights and maximum passenger capacity.

The Siemens Trent gas turbine is assembled
in a modularised package with a Brush
generator, to form the SGT-A65 generator set.

The use of Rolls-Royce engines for electrical
power plants represents successful technology
transfer and benefits from more than 30
years of development and billions
of dollars of research.

The SGT-A65 also benefits from a long
operating life of 50,000 hours (approx. 6 years).
Turbines can then be switched out for a
replacement in under 72 hours. The cost of this
“as new” recurring operational capacity is
incorporated in O&M costs.

The Siemens technology package includes
comprehensive O&M and performance
guarantees, resulting in maximum
reliability and efficiency.
123456789101112131415161718192021222324


FLOATING POWER PLANT


An FPP has unique economic, social and
environmental features that make it an
optimal source of electric energy.

Floating power plants that use SGT-A65
engines have several important advantages:

Location flexibility

  • Two SGT-A65s are mounted on a floating
    barge, thus creating a complete movable
    power plant
  • Significantly less footprint is required
    than for land-based power plants. This
    provides many options of where to site
    the FPP units, as close as possible to gas
    supply and the local electrical evacuation
    infrastructure.
  • Ownership of the FPP units is always
    retained. These assets can therefore be
    deployed to other sites if necessary.

Speed of manufacture, installation
and commissioning


  • Quicker and easier than land-based
    counterparts
  • Gigajoule’s floating power plants will
    be assembled in the Appledore Shipyard
    UK with its covered dry dock allowing
    for manufacture throughout the year
  • Once the floating power plant arrives
    at the place of deployment by heavy lift
    vessel, connection to gas supply and
    the electrical grid is done in a
    relatively short time

Simultaneous establishment of the
land-based infrastructure for
the FPP units

  • Dry dock, gas pipelines, substations
    and transmission lines


Economies of scale
  • FPP units are deployed in groups of
    four per site though this can be increased
    or decreased as requirements dictate
  • In a typical deployment configuration,
    eight modularised SGT-A65 generator sets
    in operation means that maximum
    operating availability can be maintained
    at all times for the typical twenty-year
    operational term.
123456789101112131415161718192021222324


SIEMENS SGT-A65 SYSTEM


The Siemens Trent gas turbine is assembled
in a modularised package with a Brush
generator, to form the SGT-A65 generator
set, complete with intake duct and
exhaust stack. The system is fully automated.
Each SGT-A65 has a generating
capacity of 66 MW.

Siemens Operating, Maintenance and
Performance warranties ensure a twenty-year
average of operational ability of
not less than 95%.

The SGT-A65 is an aeroderivative gas-powered
turbine. Its start-up time is very fast, at less
than 10 minutes, and it can tolerate frequent
stops and starts. This stop-and-go capability
is particularly effective in balancing out
energy load fluctuations.

The SGT-A65 can provide base-load power both
to electrical grids and to industrial applications.



APPLICATIONS


Immediate
Gigajoule is ready to implement three projects of 528MW each at various sites in Southern Nigeria, in close proximity to gas supply
and electricity evacuation infrastructure.

  • Significant work has been completed at each of these sites to secure power generation licenses, confirmation of gas supply
    and electricity evacuation transmission studies.
  • Additional work includes preliminary environmental approvals, floating plant and infrastructure design work, economic viability
    confirmation and the necessary precursor negotiations to secure the Power Purchase Agreement with the Federal Government.

Project funding is achieved by utilizing the following credit enhancements:

  • World Bank Partial Risk Guarantee
  • Siemens full Operating, Maintenance and Performance Warranty
  • Lloyds of London Insurance

This amounts to over 1500MW installed capacity at a project cost of US$1.4bn (net) which is externally financed.

910111213141516171819202122232425262728293031323334
Future

  • In Nigeria alone there is immediate demand for
    another 10 000MW
  • In the rest of Africa, immediate demand is 20 000MW
  • Globally, excluding Africa, demand is estimated at
    another 30 000MW
123456789101112131415161718192021222324252627282930
Potential

  • Desalination plants for fresh water supply
  • Mini-refineries to produce diesel and petroleum products
    from traditionally uneconomic oil fields






12345678910111213141516171819202122232425262728293031323334
THE GIGAJOULE TOKEN

An initial exchange offering (IEO) will be conducted to finance
the implementation of the Gigajoule project. A digital token
named the Gigajoule (GIGJ) will be issued.

In contrast with most ICOs and IEOs, the GIGJ token will not
be a simple utility token, exchangeable for goods or services
to be produced in the future.
Rather, the GIGJ token is structured as a security: token
holders will benefit from the success of the project.

GIGJ token holders will be entitled to receive an annual
dividend of 15% of the profits generated by the Gigajoule
project, in proportion to their number of tokens.
12345678910111213141516171819202122232425262728293031323334

IEO SPECIFICATIONS






IEO SCHEDULE

The initial coin offering shall be divided into two general stages: a private pre-sale and an IEO public sale. Discount incentives shall be
applicable  according to the following table





12345678910111213141516171819202122232425262728293031323334

12345678910111213141516171819202122232425262728293031323334








EXECUTIVE TEAM


12345678910111213141516171819


GARDNER, DAVID
Founder & Senior Engineer
12345678910111213141516171819


POTTER, CHRIS
Founder & Maritime Engineer
12345678910111213141516171819


SCHWARTZ, RUSSEL
Founder & Chief Executive Officer
12345678910111213141516171819


SCHWARTZ, WARREN
Founder & Software Engineer


Frequently Asked Questions

WHAT IS A GIGAJOULE TOKEN?
The Gigajoule token (symbol: GIGJ) is the digital token that shall be issued in the IEO, using the Ethereum standard ERC, for the conduction
of the fundraising. GIGJ tokens shall be available for purchase throughout the IEO and will be delivered to investors’
wallets after the completion of the IEO.

ARE GIGJ UTILITY TOKENS OR SECURITY TOKENS?
GIGJ tokens will be security tokens, not utility tokens. Utility tokens, the most common method in ICO/IEO fundraising, give token holders
the right to exchange them for goods and services to be produced by the project which is financed through the ICO/IEO. Token holders do
not participate in any way in the profits of the project. In contrast, security tokens provide investors with profit earning rights,
among other potential rights.

WHAT RIGHTS DO GIGJ TOKEN HOLDERS HAVE?
GIGJ token holders shall have a right to earn 15% of the annual profits generated by all Gigajoule projects, according to the percentage of
tokens they hold. For instance, if in year 2025 a total of $20,000,000 in net profits is generated, a token holder who owns 5% of the GIGJs
in circulation, will earn the sum of $150,000 in annual profits ($20M x 15% x 5%).

WHICH CRYPTOCURRENCIES CAN I USE TO PURCHASE GIGJ TOKENS?
GIGJ tokens can be purchased during the IEO with BTC and ETH cryptocurrencies. Purchase of GIGJ tokens after the IEO will depend on the
specifications of the digital exchanges where GIGJ shall be listed.

WHAT WILL HAPPEN TO UNSOLD GIGJ TOKENS?
GIGJ tokens that are not sold during the IEO shall be burnt. “Burning” a token means sending it to an ETH address where the token can not
be traded further.

WILL GIGJ TOKENS BE LISTED IN DIGITAL EXCHANGES?
Yes, GIGJ tokens will be listed at exchanges. Now we are at an advanced stage of negotiations with a top 10 exchange by daily volume
and will announce it soon.

123456789101112131415161718192021222324

123456789101112131415161718192021222324


123456789101112131415161718192021222324


JOIN OUR COMMUNITY!
https://t.me/gigjtoken
Pages: [1]
Powered by MySQL Powered by PHP Powered by SMF 1.1.19 | SMF © 2006-2009, Simple Machines Valid XHTML 1.0! Valid CSS!