Bitcoin Forum
May 13, 2024, 05:33:27 PM *
News: Latest Bitcoin Core release: 27.0 [Torrent]
 
  Home Help Search Login Register More  
  Show Posts
Pages: [1]
1  Bitcoin / Mining software (miners) / Re: M's Miner (Ant/SP) Monitor v5.2: alerts,auto/mass/scheduled reboot/mobile miner on: May 26, 2016, 11:03:02 PM
I use Hamachi and CryptoGlance and Rasberry Pi and Dedicated ip to monitor my rigs.

Bridge The Connection and make sure your gateway and info is not the same and its good to go.

Some PHP scripts for Security and I can login from anywhere and mobile app too ^^

Testing  ZWILLA soon as well
2  Bitcoin / Mining / Re: 80 machine Setup bittech Updates Live Build Testing Modding analysis Phase 1 on: May 23, 2016, 09:40:14 AM
working on cooling and cfm's.

the difficulty is going insane before the halving. in the last two months we are up .9 thats crazy for sure.

Smaller Miners should be dropping we already saw 50 p/h of miners disappear this week.

We are debating on paying for elec with coins or cash for the up comming halving.

reading alot articles and reddit's

https://bitcoinmagazine.com/articles/will-the-upcoming-mining-reward-halving-impact-bitcoin-s-price-1455126224

$800+ a BTC would make this alot better or god willing a higher miners fee

http://cointelegraph.com/news/china-bitcoin-mining-growth-may-help-overcome-worries-over-711-halving

Converting s7's to 1 fan FW we have 50 C temps and too much CFM

3  Bitcoin / Mining speculation / Re: I have 3 Million USD to invest into Crypto Currency - How should I do it? on: May 23, 2016, 09:28:19 AM



I am in a situation where I must make some decisions on how to proceed with a budgeted investment into Crypto currencies.

Our group is looking to speak with all equipment manufacturers and anyone who might have some splendid ideas on how to best
capitalize on crypto.  

Specifically, we wish to entertain all avenues of investment.

Note that this investment can grow to as much as 10M over time however as a group we have elected to begin with 3M and take things
in stride.

We are wanting to see who can offer the best mining hardware and at the best price. Don't bother offering me used gear and/or crazy high prices for 1.4Th units etc...

We are also looking into ATM machines and establishing an ATM network for Crypto-Currency etc.

Feel free to contact me on skype: host.wanted

No phone calls please.  If you skype me I can give you my email address as a first form of contact, and then we can maybe get on a call.

I own a few datacenters so Im looking to fill them with my own equipment as well as other peoples colo bitcoin rigs and the like.

So the question of this thread is:  IF YOU HAD 3M, what would YOU do with it in Crypto?  let's get the creative juices flowing and see where it goes.

Ya'll ready?





We are also a Multi Million op and were on this forum so I think he might be for real. I might ask a programming question or something else but ya prob not a  good place for finance
4  Bitcoin / Mining / Re: 80 machine Setup bittech Updates Live Build Testing Modding analysis Phase 1 on: May 07, 2016, 11:39:07 PM
I put the future of Block chain in this album the pictures should speak for themselves.

We are going virtual currency through commodities and trusts in value

this is the future!!!

pix From the last year to current


http://imgur.com/a/f7aJL

5  Bitcoin / Mining / Re: 80 machine Setup bittech on: May 07, 2016, 10:29:10 PM
Thanks for the great response.

I did till 12 am thurs friday so I am scripting php for a break lol

MinerMill.com WIP

Phase 123 starts sunday

We are going for slush pool we should land top 4 in group mining

network 85% complete

http://imgur.com/a/Koq7i

http://imgur.com/DEmbKlP

Ducting 70% power 30%

We are stepping out to speak from a  position of authority

thanks for the support


6  Bitcoin / Mining / Re: I just want to ask if there's a way to change the firmware of antminer? on: May 06, 2016, 07:16:30 AM
putty winscp serial ring a bell? SSH in man start coding bitmain API

also several fw mods are avail we are testing some.
on s7's

sha-256 is good for anything that supports it.
7  Bitcoin / Mining / Re: 80 machine Setup bittech on: May 06, 2016, 07:08:33 AM
what horrible timing to start a bitcoin mining farm..

you do know you have about 70 days left before the block reward halving making all those miners useless?


Well, not exactly. It depends on the Bitcoin price, right? If all the prices, like of electricity, miners, etc. stay same but the price of Bitcoin will rise then it might be not useless to mine them.

your logic is flawed..


if you are 'hoping' for the price to increase he would be better off putting all the upfront money directly into bitcoin and hold it.. as the miners WILL NOT make that much in the 70 or so days he has left to mine.

in the end, its a horrible time to invest in bitcoin miners.. he should have done research and waited for next gen machines.

We are a beta testers for miner manufactures we are sent models before they are released. We are well aware of the next series. (months before public release/announcement)

As well companies send us beta models to try to get to change our form factor to theirs.

we have direct face to face relationships with the industry.

we are not new to this. we are just stepping out of the shadows

The life cycle of the machines are part of it. you have to be able to handle things.

You would of said the same thing about the s5's before the s7's there will be always a newer model

wu tang and 1.5 p/h are nothing to f with ^^

if anything please learn from me
8  Bitcoin / Mining / Re: 80 machine Setup bittech on: May 06, 2016, 07:01:07 AM
Got back to do some work at one of the data centers for mining heres how far we got.

http://imgur.com/j2A1NrW

Center should be operational by sunday will share the reports from different pools hash rate etc.

9  Bitcoin / Mining / Re: 80 machine Setup bittech on: May 06, 2016, 06:29:07 AM
Bittech went to NYC for the block-chain consensus 2016

We will have reports coming out soon.

The banking industry has come for the block chain and to kill bitcoin.
already changing the word bitcoin or coin to token seems to be the corps new buzz word.

The banking industry is going to make corp Commodities for value trust and trade back to USD or whatever base they use.
Is my best take to explain how block-chain is evolving.

So Visa coin built value through trust but private networks and private mining closed network chains  

The trick is getting the masses to adopt.
Pay walls for the internet are being discussed as well virtual currency through Commodities coins/tokens

We will be working hard to bring bitcoin to the for front and have alot great products coming out.

Look out for our company products as we are a pro BTC mining firm.

Our financial analyst James will be revealing a breakdown later on this forum.

CEO Chief Engineer is my company position.

Pix in link look for the report from James soon...

He is going to read the block chain book beforehand the banking corps virtual currency platform

http://imgur.com/a/7ucgD

block chain is 84% of all VC investments of 2016 for a reason bittech is not worried about the halving we are well aware.

10  Bitcoin / Mining / Re: 80 machine Setup bittech on: May 06, 2016, 06:20:04 AM
I have a R&D to do that work.

We are a well funded op.

I am sharing because I was one of you guys as well. I spent 2 years in dev before coming out for investors.

As well this is only one facet of the business.
11  Bitcoin / Mining / Re: 80 machine Setup bittech on: May 01, 2016, 01:39:59 PM
gearing up to leave for convention.

http://www.coindesk.com/events/consensus-2016/attendees/

12  Bitcoin / Mining / Re: 80 machine Setup bittech on: April 30, 2016, 11:56:19 PM
Going to NYC bitcoin convention tomorrow  this how far I got with the network it's nearly complete

http://postimg.org/image/i6mwev175/
13  Bitcoin / Mining / Re: 80 machine Setup bittech on: April 30, 2016, 01:06:07 AM
Working Taking care of the network mostly done!

Check it out next I will be Running Power it is half Run already.

Then finally cooling.

Will post updates.

Trying to finish before the coindesk convention next week

http://postimg.org/image/vorj7o2mp/
14  Bitcoin / Mining / Re: 80 machine Setup bittech on: April 27, 2016, 01:37:23 AM
This is a commercial location we are in phase 1 with 80 machines phase 2 puts us around 180 machines so venting directly outside was the only option.

I built some quick rigs out the window with about 4 tons of cooling and maintained a 68 F  temp.

after this we went with a full outtake 12,000 cfm fan sucks the air out from the ducting plus the 16k cfm from the machines,

We also found out its a 80/20 rule with cooling when we vent so we went with this option.

We have 80 240v lines triple phase elec is about 6500$ per month.

We contracted one of lowest rates in my state and have permission from the town for a full megawatt supply.

We had to get a special license next upgrade is going to be 1800 Amps Triple Phase and our rate changes to 9.8 per K/Wh  commercial rates no industrial!!!
my partner is a master negotiator

This should push us well over  a peta hash and we plan on solo mining blocks,  Or running a P2pool/Stratum.
Been messing around with a beta Rpi Ubuntu setup.

Things are changing with the halving so reports are key. And a possible upgrade I don't know how long of lifespan these batches will yield.

We run 24 hour test on all mining pools and change with the work load we also split between networks to avoid the 18 shares per min limit.

I am going to the BTC/Coindesk convention next week I will try to post some updates from the venue


I have been busy running the network Cat6 with managed switches.
The Racks are temp and I am going with a setup like genesis mining groups build.

these are quick report site pics I sent out to my partners for updates so excuse the blurriness.



I am a IT Engineer for 10 years professionally. I have worked for EMC MS apple dell unysis etc.

I have a strong resume its half the reason I was given the budget with complete confidence.

I missed the web boom I was to young im not missing this one!

My partners are all IT clients I have known for years.

0.024 per machine avg

cat6 300mbps/300mbs FIOS (comcast is horribad 100mbps/20mpbs LOL)
managed cisco switches 2950

We plan on going blockchain 2.0 or testing beta next July when it comes out.


Bitmain s7 don't see us changing in the near future especially after the multi failures of other manufactures  ><



15  Bitcoin / Mining / 80 machine Setup bittech Updates Live Build Testing Modding analysis Phase 1 on: April 23, 2016, 05:38:39 PM
Currently Building a major rig for our main pool.

Rig 80 Ant pool Rig Hash_Rate 4.8 TH

Here are some Commercial Site Pix during Construction.

220v Triple Phase Elec. 10.7 k/w

Capacity:

1 Megawatt Town Commercial License









Ill Post Hash Rate Total after Final Testing
bittech



Pages: [1]
Powered by MySQL Powered by PHP Powered by SMF 1.1.19 | SMF © 2006-2009, Simple Machines Valid XHTML 1.0! Valid CSS!