Few words about SYNTHESTECH CenterIts total usable area is 400 square meters, which are spread over two floors. The center was built in full compliance with the standards, taking into account regional building codes and environmental requirements. Foundation structures and floors are cast from high-strength concrete of grade 500. The height of the building is 3.5 meter. The building is equipped with all necessary systems. The center is connected to the Internet via a fiber-optic channel at a speed of 300 megabits.
A workshop, a construction department, a research and analytical complex, and a briefing room will be located in “Synthestech” Center.
The building itself is located in a beautiful place, in a lived-in area near the city center of Sochi, and it meets all the stated objectives. All this together allows us fulfillment of our stated plans.
Here, our work under implementation of “Synthestech” Project on the Cold Synthesis of Valuable Elements is entering a practical phase.We are starting to move to our new center. However, due to long rains and high humidity, some processes are not completed.
Sometimes we are asked — how likely is achievement of project commercialization by 2020 announced in White Paper? We are now absolutely confident in the implementation of this plan and, as it is evident from the already embodied stages, we are consistently moving towards its implementation. Some perspectives and plans will be revealed during our video stream.
On behalf of the project head Vladislav Karabanov and the team working in the project, we thank all those who invest in “Synthestech” Project, help and believe in it.Below are photos of our Center. As the Center gets settled, we will provide photo information.
Our Center
View from the facade
30 meters to the Center
Work goes till late
We try on a place for a logoLearn more and sign up for newsletter at our web site:
https://ico.synthestech.com/https://blog.synthestech.com/our-center-is-finished-6f70a457d2b9