Bitcoin Forum
November 13, 2024, 04:11:53 PM *
News: Latest Bitcoin Core release: 28.0 [Torrent]
 
   Home   Help Search Login Register More  
Pages: [1]
  Print  
Author Topic: Mining hotel in Estonia/Tallinn  (Read 115 times)
cold013 (OP)
Member
**
Offline Offline

Activity: 77
Merit: 15


View Profile
July 09, 2018, 01:31:32 PM
Last edit: February 17, 2020, 03:35:27 PM by cold013
 #1

Hello everybody!

Due to the high cost of mining BTC, it is possible to reduce the cost of electricity by placing equipment in a convenient climatic zone.

Hotel location - Estonia, Tallinn
web: iminer.eu

- The mining hotel in the EU (there is no minimum capacity for accommodation, we accept from 1 device!)
- Accommodation in a regulated facility of Estonia's largest power station
- Insurance equipment against fire and theft (included in the rental price)
- The proposed infrastructure for the installation of equipment includes the following:

1. Distribution of power supply to consumers - input panels of main switchboards, power wiring in cable trays, switchboards on racks, sockets 2 kW, all works on installation of internal and external networks are performed by certified specialists.

2. Distribution of the Ethernet network along the ASICs - input routers on the Internet, UTP 6e twisted-pair cable wiring, switches on the shelves. The main Internet channel is 100 Mbit / s from the leading Operator of Estonia, the optics are right for the hotel.

3. Shelves for the placement of ASICs, including for non-standard equipment

4. The system of ventilation, pre-cooling and removal of hot air from the premises on a special project, calculated on the climatic conditions of Estonia.

5. Fire extinguishing equipment, including portable and mobile fire extinguishers

7. Program / monitoring system, management and cloud service, stratum-proxy.

8. The system of video surveillance and access control to the premises of the farm. Customers have the ability to remotely monitor the operation of equipment. Round-the-clock security.

9. Farm staff. Schedule of work 24\7.

10. Work strictly under contracts within the framework of EU laws.

Price:
- Conditional cost of 1 kW (including all infrastructure used - 0.08 EUR/ kWh (VAT excluded)
- Accommodation 1 device – 25.5 EUR / month (VAT excluded)

Contacts for communication and offers:
email: nsmarttechn@gmail.com
mob: +370 694 11770
cold013 (OP)
Member
**
Offline Offline

Activity: 77
Merit: 15


View Profile
July 13, 2018, 06:09:13 AM
 #2

Up
cold013 (OP)
Member
**
Offline Offline

Activity: 77
Merit: 15


View Profile
February 17, 2020, 03:36:45 PM
 #3

UP: Conditional cost of 1 kW was down to 0.08EC
Pages: [1]
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.19 | SMF © 2006-2009, Simple Machines Valid XHTML 1.0! Valid CSS!