Bitcoin Forum
May 24, 2024, 09:41:25 PM *
News: Latest Bitcoin Core release: 27.0 [Torrent]
 
   Home   Help Search Login Register More  
Pages: [1]
  Print  
Author Topic: [ANN][ICO] MINEBERG own-production of 14nm and 7nm Bitcoin ASIC Miners  (Read 252 times)
minebergteam (OP)
Newbie
*
Offline Offline

Activity: 2
Merit: 0


View Profile
November 05, 2018, 01:51:21 PM
Last edit: November 08, 2018, 02:29:43 PM by minebergteam
 #1

Project website - https://mineberg.com
ICO website - https://mineberg.io
Blockchain explorer - http://mineberg.io:2052/Mineberg/assetref/197-591-32807
Whitepaper - https://www.mineberg.io/document/5bdeeefc69779.pdf
Project video introduction - https://youtu.be/UVC1QlmrDGw
Two-phase immersion miner demo - https://youtu.be/g3doTZnSB7Q


ICO Stage #1 (30% OFF) summary
  • 1 BERG = 0.7 USD
  • Total coins suply for Pre-ICO = 714,286 BERG
  • $50 = 1 TH/s of Mineberg Immersion Mining Center's capacity.
  • Possibility to resell BERG freely through the Mineberg Wallet.
  • Capacity activation - 1 month after the ICO end.
  • Coins can be distributed to any hashrate equivalent needed.

Project description
BitWare Group Limited UK is a technological group of 45 world's best engineers and 5 laboratories focused on IoT, Blockchain, AI and Machine Learning.
Mineberg - is a trademark of BitWare Group that will provide own-production, low-margin, life-time dedicated Bitcoin mining capacities world-wide.
Own manufacture and maintain process allows to reduce capital and operational expenses, providing supercomputer clusters' best for cryptocurrency networks service.

Mineberg Immersion Mining Center's minimal hosting rate is $0.02 per kWh. We offer 1 TH/s for 40$, providing lowest entry threshold on the market.
Project’s fund constantly increases total computing power and distributes it among the coinholders, ensuring a guaranteed level of bitcoin production.
Coinholders are able to convert Bitcoin to Fiat through our own Bitcoin exchange.

Project roadmap

Stage 1

  • Production of Mineberg 14nm BTC Immersion Miner - (Industrialisation and machine supply).
  • Production of HPC equipment Mineberg HPC Server, Stratix 10 FPGA+HBM2 Immersion machine for HPC and AI - (Industrialisation and machine supply).
  • Mineberg 20MW GreenHouse (Office, Gas Power Stations, Mining equipment, GreenHouse).

Results of the 1st stage: 2 type of low-margin solutions for industrial mining BTC Miners and HPC Servers for High-Performance Computing are ready.
The total capacity of the immersion center, subject to raising funds in the amount of $ 8,000,000 (Hardcap), will be 20 MW. The miners’ supply time is 1 month starting from the end of ICO.

Immersion mining center building schedule:
  • Softcap - 1 module of Mineberg IC with total 1 MWt capacity will be launched
  • Midcap - 10 modules of Mineberg IC with total 10 MWt capacity will be launched
  • Hardcap - 20 modules of Mineberg GreenHouse with total 20 MWt capacity will be launched.

Stage 2
  • The release of a chip for Bitcoin mining - 7nm BTC ASIC (IC, IP, TSMC lithography and prototype);
  • Release of co-processor for HPC acceleration ASIC+HBM2 (System in Package rototype - SiP);
  • Mass production of HPC co-processors and mining chips for 7nm BTC ASIC.

The results of the second stage: ASIC microcircuit for industrial mining 7nm BTC and a coprocessor to accelerate machine learning and robotic systems.

Additional emission
In the process of developing the project, Mineberg will have new capacities that will be reflected through the additional release of a batch of coins and placing them on the exchange. In total, after the implementation of three stages of additional emission, the total capacity of the immersion center will be 170 MW.
  • $10M - 25 Mineberg modules with a total capacity of 20 MW.
  • $20M - 50 Mineberg GreenHouse modules with a total capacity of 50 MW.
  • $35M - 80 Mineberg GreenHouse modules with a total capacity of 80 MW

BTCBTCBTCBTCBTC
AleOpus
Jr. Member
*
Offline Offline

Activity: 322
Merit: 6


View Profile
November 06, 2018, 02:35:43 PM
 #2



Project website - https://mineberg.com
ICO website - https://mineberg.io
Blockchain explorer - http://mineberg.io:2052/Mineberg/assetref/197-591-32807
Whitepaper - https://www.mineberg.io/document/5bdeeefc69779.pdf
Project video introduction - https://youtu.be/UVC1QlmrDGw
Two-phase immersion miner demo - https://youtu.be/g3doTZnSB7Q


ICO Stage #1 (30% OFF) summary
  • 1 BERG = 0.7 USD
  • Total coins suply for Pre-ICO = 714,286 BERG
  • $40 = 1 TH/s of Mineberg Immersion Mining Center's capacity.
  • Possibility to resell BERG freely through the Mineberg Wallet.
  • Capacity activation - 1 month after the ICO end.
  • Coins can be distributed to any hashrate equivalent needed.

Project description
BitWare Group Limited UK is a technological group of 45 world's best engineers and 5 laboratories focused on IoT, Blockchain, AI and Machine Learning.
Mineberg - is a trademark of BitWare Group that will provide own-production, low-margin, life-time dedicated Bitcoin mining capacities world-wide.
Own manufacture and maintain process allows to reduce capital and operational expenses, providing supercomputer clusters' best for cryptocurrency networks service.

Mineberg Immersion Mining Center's minimal hosting rate is $0.02 per kWh. We offer 1 TH/s for 40$, providing lowest entry threshold on the market.
Project’s fund constantly increases total computing power and distributes it among the coinholders, ensuring a guaranteed level of bitcoin production.
Coinholders are able to convert Bitcoin to Fiat through our own Bitcoin exchange.

Project roadmap

Stage 1

  • Production of Mineberg 14nm BTC Immersion Miner - (Industrialisation and machine supply).
  • Production of HPC equipment Mineberg HPC Server, Stratix 10 FPGA+HBM2 Immersion machine for HPC and AI - (Industrialisation and machine supply).
  • Mineberg 20MW GreenHouse (Office, Gas Power Stations, Mining equipment, GreenHouse).

Results of the 1st stage: 2 type of low-margin solutions for industrial mining BTC Miners and HPC Servers for High-Performance Computing are ready.
The total capacity of the immersion center, subject to raising funds in the amount of $ 8,000,000 (Hardcap), will be 20 MW. The miners’ supply time is 1 month starting from the end of ICO.

Immersion mining center building schedule:
  • Softcap - 1 module of Mineberg IC with total 1 MWt capacity will be launched
  • Midcap - 10 modules of Mineberg IC with total 10 MWt capacity will be launched
  • Hardcap - 20 modules of Mineberg GreenHouse with total 20 MWt capacity will be launched.

Stage 2
  • The release of a chip for Bitcoin mining - 7nm BTC ASIC (IC, IP, TSMC lithography and prototype);
  • Release of co-processor for HPC acceleration ASIC+HBM2 (System in Package rototype - SiP);
  • Mass production of HPC co-processors and mining chips for 7nm BTC ASIC.

The results of the second stage: ASIC microcircuit for industrial mining 7nm BTC and a coprocessor to accelerate machine learning and robotic systems.

Additional emission
In the process of developing the project, Mineberg will have new capacities that will be reflected through the additional release of a batch of coins and placing them on the exchange. In total, after the implementation of three stages of additional emission, the total capacity of the immersion center will be 170 MW.
  • $10M - 25 Mineberg modules with a total capacity of 20 MW.
  • $20M - 50 Mineberg GreenHouse modules with a total capacity of 50 MW.
  • $35M - 80 Mineberg GreenHouse modules with a total capacity of 80 MW

BTCBTCBTCBTCBTC

Crypto Spring - New Coins https://discord.gg/6wCArKV
minebergteam (OP)
Newbie
*
Offline Offline

Activity: 2
Merit: 0


View Profile
November 11, 2018, 12:26:55 PM
 #3

Hello!

Congratulations! You have been selected and added to icoholder.com. Find your project on our website and go through verification to add more information.

https://icoholder.com/en/mineberg-27097

Thank you very much!!!
anggriani
Sr. Member
****
Offline Offline

Activity: 630
Merit: 251



View Profile
November 21, 2018, 04:18:55 AM
 #4

why can't I access your site? where is your location mining? you say that you have your own exchange, so can I trade there?
FraGmeNt01
Copper Member
Newbie
*
Offline Offline

Activity: 84
Merit: 0

join in :https://t.me/HOT_BOUNTY_CHANELL


View Profile
November 28, 2018, 06:53:50 PM
 #5

Hello! Do you need a bounty Manager? I can conduct a bounty campaign of your project
starkovblue
Sr. Member
****
Offline Offline

Activity: 966
Merit: 270


View Profile
November 30, 2018, 05:05:12 PM
 #6

It is doubtful for me that in such a market you will find investors and buyers for your products at such prices. Even if all of you in terms will deliver competitors all the same look better.

Crypto is a very unique industry, where the line between "deserves to be in jail" and "leading member of the community" is as thin as one-ply toilet paper.
Pages: [1]
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.19 | SMF © 2006-2009, Simple Machines Valid XHTML 1.0! Valid CSS!