Bitcoin Forum
May 27, 2024, 03:15:59 AM *
News: Latest Bitcoin Core release: 27.0 [Torrent]
 
   Home   Help Search Login Register More  
Pages: [1]
  Print  
Author Topic: Biweekly report (6.15–6.28)  (Read 64 times)
MassGrid (OP)
Newbie
*
Offline Offline

Activity: 13
Merit: 0


View Profile
June 28, 2019, 08:54:46 AM
 #1

Cheesy Cheesy Cheesy

MassGrid — a decentralized high performance cloud computing network

It has been working to transform the meaningless POW hash calculation into a universal parallel computing that can produce real value to human society through improved POW algorithm and blockchain network mechanism, and build a decentralized GPU. A performance cloud computing network that is available to all individuals or organizations that need these computing power.

We have achieved efficient transmission in low bandwidth situations and released a new algorithm for low bandwidth and efficient AI training, which is 12 times better! 🔝

Currently, our virtual machine test network has been iterated to version V1.3.3.1!

Large-scale test of virtual machine network preparation:

1. Cooperation with large mine deployment has been finished
2. The virtual machine function is switched to the main network.
3, the virtual machine network adds sustainability and storage functions have been completed
4. At present, the virtual machine network has been tested at the Hong Kong Baptist University for small-scale testing.
5. After the small-scale test is completed, large-scale testing will be carried out together with the mine.

1 | Technology update

Wallet update:

1. Patch the master node protocol bug;
2. Patch the master node list refresh bug;
3. Add a rpc interface for partial block access;
The updated version has been uploaded to Github and will be forced to update this evening.

Master node replacement tutorial

The MassGrid main network will be upgraded when the block height reaches 180,000, which is about July 3, 2019.
After this height, the old PC wallet can not be used in the new network, there will be problems such as abnormal transfer, please update as soon as possible!!!
The main node replacement tutorial is as follows👇
http://Https://massgrid.com/doc/masternode.html

2| Mining machine revenue

The official managed mining machine revenue has been released, details are as follows:
Time: 2019.6.10–6.24
Duration:14days
Total revenue: 79,700 MGD
Average income per miner: 73.93 MGD/day

3 | MGD Wallet Update

Dear MGDers,
Please pay attention to the wallet update! The MGD main network block height reaches 180,000 and will be hard forked. The estimated time is July 3th. This fork is upgraded to the main network, and you need to update the PC wallet,please update your wallet as soon as possible to ensure the safety of your assets.

The download link of new wallet is as follows:
download on the official website or Github
Official website:
http://Https://www.massgrid.com/downloads.html?language=cn
Github:
https://github.com/MassGrid/MassGrid/releases/tag/v1.3.3.0-rc

Master node update can be downloaded on the Github Release version

The master node replacement tutorial is as follows:
http://Https://massgrid.com/doc/masternode.html

To learn more about our project and to stay up to date on the latest development, you can visit us on the following pages:
Website: http://massgrid.com
Whitepaper: Click Here
Twitter: https://twitter.com/MassGrid
Youtube: https://www.youtube.com/channel/UCLFYpBlD1Q_jY9TJb40Hs_g
Medium: https://medium.com/@massgrid
Pages: [1]
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.19 | SMF © 2006-2009, Simple Machines Valid XHTML 1.0! Valid CSS!