Bitcoin Forum
May 28, 2024, 11:56:01 AM *
News: Latest Bitcoin Core release: 27.0 [Torrent]
 
   Home   Help Search Login Register More  
Pages: [1]
  Print  
Author Topic: Available Mining Sites in Kentucky  (Read 67 times)
JAGGYProof (OP)
Newbie
*
Offline Offline

Activity: 2
Merit: 0


View Profile
May 03, 2022, 07:21:54 PM
 #1

Hey all, long-time lurker and miner. I hope this isn't against the rules, but I wanted to make you all aware of some new rack space that is coming available. Below are the details. Feel free to send me an e-mail if you'd like to know more: Jake@ProofConsults.com

3MW -- Ready by 9/1. All-in hosting rate of 7.5 - 8c depending on the number of machines
16MW -- ready now for immediate control. The land is attached to the substation and is best for a containerized operation. $20k lease per month. Market rate purchased wholesale through MISO. Average rate is around 5c over the past 5 years, with the most recent 6 months being closer to 6c due to natural gas and coal spikes.
10MW -- ready now for immediate control. The land is attached to the substation, comes with 10k sqft warehouse space and .5 acres. Suitable for containers or evaporative cooling. $14k lease per month. Market rate purchased wholesale through MISO. Average rate is around 5c over the past 5 years, with the most recent 6 months being closer to 6c due to natural gas and coal spikes.

Thanks,
Jake
Pages: [1]
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.19 | SMF © 2006-2009, Simple Machines Valid XHTML 1.0! Valid CSS!