Bitcoin Forum
June 28, 2024, 04:12:32 PM *
News: Latest Bitcoin Core release: 27.0 [Torrent]
 
   Home   Help Search Login Register More  
Pages: [1]
  Print  
Author Topic: Turn key 5mw mining farm  (Read 115 times)
SThayer (OP)
Jr. Member
*
Offline Offline

Activity: 62
Merit: 1


View Profile
January 07, 2023, 01:44:36 AM
 #1

5MW site on 3.3 acres in the States. Mix of hydro and coal power.
Turn key hosting site
Included in the sale:
5MW of power already installed. Additional 8MW is possible after applying for the permits. This would bring it to 13MW total.
4 40 foot containers.
4 1770 KVA transformers.
Power and space to add a 5th container.
5.9 cent power exempt from state sales tax.

Buy the business and lease the land and buildings. Option to buy the land and buildings.
Two buildings. One open 4000 Sq ft building. One large building with a 4000 Sq ft warehouse, a 7000 Sq ft warehouse, offices, and 2 loading docks.

2.1 million for the whole enchilada, 1.6m for just the business assets
MoparMiningLLC
aka Stryfe
Legendary
*
Online Online

Activity: 2128
Merit: 2276


EIN: 82-3893490


View Profile WWW
January 24, 2023, 05:43:25 AM
Merited by WhyFhy (1)
 #2

post some pictures - maybe at least say what state it is in.

Mine BTC @ kano.is
Offering escrow services https://bitcointalk.org/index.php?topic=5154480
All Bitcoin 3D printing needs at CryptoCloaks
Pages: [1]
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.19 | SMF © 2006-2009, Simple Machines Valid XHTML 1.0! Valid CSS!