I don't understand why an electrician wouldn't want a job/contract? Maybe I didn't follow you well.
He saw the a few miners in that room (I think at time 2 C1's, 2 SP20's, and a S4). After seeing miners he wanted nothing to do with it. I have no idea why.
Instead of writing a quote for putting in 1 240 breaker and 10 foot line with box, he did a quote to redo entire box (which was not needed it perfectly fine). So less then 100 dollar job he sent a quote for over a thousand dollars. I'm not sure why he did not want it so bad, he even suggested I get other quotes. Needless to say he did not get the job.