December 09, 2017, 07:03:20 AM |
|
Hi guys, first post on this awesome and informative site.
I have 2 S9's and s L3+'s arriving to me in California this week, and I have some questions if I may:
1). I purchased the apw3++, and believe it will only produce 1200W on a 110V socket. With this in mind: a). Will the L3+, as it only requires 800W, run fine from the wall? Any concerns on heat or efficiency? b). Can I run the S9's 'indefinitely' on a 2000W 110v/220v transformer? Any concerns here? It's certainly more efficient than having a 220v outlet installed c). Can I run the 4 units from one or two outlets, if I use a good surge protector? I was hoping for the 2 L3+s directly into the mains, then the S9's via the transformers.
2). I am purchasing some sound proof boxes, and want to run the ducting from the boxes down into one duct, using Y adapters. So 4 hoses from the boxes, down into 2, then down to 1 that I vent out of the room. Is there any concern here? Not sure about the CFMs from each fan pushing down into 1 5" duct, not sure of the mechanics with pressure here?
3). I plan to daisy chain a router from my main one upstairs, using an output from router 1 to the input of router 2 down in the garage, then using the 4 Ethernet ports to feed each miner - does this sound doable?
Any other advice very welcome.