So I had an internet issue. Not sure if it was me or optimum.
Figure out how to reconnect the gear to the net and it is back running.
I decided to hit stop button on miner and see what watts drop to.
they go to 10-12 and this is while loading the full blockchain node.
I am up to block 415,000 of 685,195
I have about 82gb of chain loaded
I think we will load around 220gb to fully load chain. Maybe six or eight hours.
I have pretty fast net 300gb down 50gb up.
On a killer pc I can load the full chain in under 5 hours.
This will be slower but not that slow.
So 10-12 watts just loading the chain
and 126-130 watts eco mining and loading the chain
I will get back with more watts.
update
So over night it bogged down.
My internet like many around the USA has been terrible since covid-19 made a ton of kids and adults use pcs out of the home.
I suspect I have been throttled due to the long large download.
I have 30/32 connections
I have 511,700 of 685,262 blocks and 182,12gb of the chain.
2 suggestions the option for an upgraded nvme.2 ssd ie a 1tb vs the 500 gb should be given.
And maybe slightly taller bigger rubber feet.
https://www.amazon.com/Furniture-Adhesive-Dampening-Anti-Scratch-Protection/dp/B083HBDVQQ/ref=sr_1_56?my thoughts are maybe something like the ones above. May be better
I do have these and will be trying them
https://www.amazon.com/3M-SP954-Naclear-Bumpers3M-SP954-NA-Protects/dp/B07872QV5D/ref=sr_1_2?this is the 1tb ssd
https://www.amazon.com/Crucial-NAND-NVMe-PCIe-2400MB/dp/B089DNM8LR/ref=sr_1_4?this is the 500gb ssd that came with it.
https://www.amazon.com/Crucial-NAND-NVMe-PCIe-2400MB/dp/B086BGWNY8/ref=sr_1_4?105 vs 58 retail cost so an upgrade option uncharge of 60 dollars would make a little extra for the builder and the owner would never have to worry about running out of space.
It looks like this will take 250 gb of the ssd.
I can clone it and drop in a 1tb any time I want but it would be easy to have the gear come with a 1tb.