WTS: ASIC, GPU, Hosting, Containers, Powered Land, Turnkey Bitcoin Mines
Used ASICs:
MicroBT Whatsminer M30S 90T / M30S++ 108T $1.15 - $1.75
Loc: MT, USA - Apogee West - Located at Local Airport - Air Freight and LTL outbound is low cost
Condition: All Working Units, Clean, 15 day DOA with RRR (repair, replace, or refund)
MOQ: 30qty
Lot Breakdown: M30S 90T - 1397qty -$1.15/T
M30S++ 108T: 29qty - $1.75/T
Tiered pricing by take rate
Containers:
All-in-One container solutions. Very short LT's. Built in USA to spec! 2MW air cooled containers with everything needed to begin mining including mounted 2MW Transformer. Remove a whole process from the chain by eliminating sourcing, additional crane day for unloading, concrete slabs poured, etc. These are hi-tech and state of the art, very competitively priced, well-designed for running cool in hot climates. These are future proofed against next ASIC gen increased air intake needs and power needs for many gens to come. Able to build at LARGE scale! Building out a large site? This is your solutions to rollout the MW with ease.
GPU:
Please get in touch if you would like to buy or sell bulk quantities of GPU's including server cases.(secondary/used only please) We have a massive rotating stock in various parts of the world including UAE, EU, HK, and the USA
Hosting:
Apogee currently Offers ASIC hosting with single unit MOQ to 1MW MOQ - Our hosting rates vary from 5.5c/kWh all-in to 6.9c/kwh all-in within secure facilities that have been in perpetual operation.
Nvidia H100 and H200 monthly remote rentals - On Demand and Monthly - Per hour basis - Singapore
$110-$210/KW/Month for Hi Density Colocation for AI and HPC Servers & GPUs in the USA
Powered Land for Sale:
20+GW and 1000's of acres of premium land for sale highly suitable for High Capacity HPC and serious Bitcoin Mining ops. Powered-on and ready in as little as 8mo. Available for Direct Offtake or JV for better rate. PPA's ready to sign! As low as 3.1c/kwh with 99+% uptime. 20MW MOQ
Turnkey ASIC Mining Sites:
Kansas, USA (natural gas site) Online in January 2025. 2.9c/kwh with 30MW total capacity. Containers & transformers on site. 10 acres available at $25m (negotiable) This is behind the meter Natural Gas Site. Will be fully operational within 15-19 weeks after project initiation.
Email:
Scott@ApogeeWestMining.com • Tel/TG/WhatsApp: +1 (406) 220-2656
Scott Bullard - Apogee West LLC - Montana, USA - HPC/GPU, Multi-MW Mining Site Sales & Development, Bulk Mining Hardware Acquisitions, ASIC Sales/Hosting