How u do the math sir
I am new ... when I check online
It say 50 cents to $1.5 a day after electricity
Can u explain please I might be calculating it wrong
Thanks
I go to viabtc.com they say 17 cents a th so a s17 is 50 th
50 x 17 is 850 cents or $8.50 before power.
a s17 does about 2000 watts per hour 2 x 24 = 48 kwatts In a day so I round to 50kwatts used each day.
power cost is below:
50x20 cents = 10.00
50x19 cents = 9.50
50x18 cents = 9.00. These are losing power rates right now
50x17 cents = 8.50
50x16 cents = 8.00
50x15 cents = 7.50
50x14 cents = 7.00 These would be a 1.00 to 1.50 a day profit.
50x13 cents = 6.50 These would be 2.00-3.00 a day profit
50x12 cents = 6.00
50x11 cents = 5.50
50x10 cents = 5.00 These would be 3.50 to 5.00 a day profit
50x 9 cents = 4.50
50x 8 cents = 4.00
50x 7 cents = 3.50
50x 6 cents = 3.00 These are 5.50 to 7.50 a day
50x 5 cents = 2.50
50x 4 cents = 2.00
50x 3 cents = 1.50
50x 2 cents = 1.00
so if the s17 makes 8.50 and burns 7.00 you earn 1.50 this means you must have 14 cent power
historically 14 cent power is meh for mining ⛏
10 cent is okay
8 cent is good
6 cent is better
4 cent or below is best.