Would anyone possibly be interested? Saves the ~41.5 € (49 € with VAT) setup fee.
It isn't ready to transfer yet (I still have some stuff to move), just trying to sound out how much of that setup fee I can recoup.
Trying to determine which upgrade path to use... whether or not I want to pay a ~58€ relocate fee or just upgrade without parallel operation (I'd rather not, but..)..
http://www.hetzner.de/hosting/produkte_rootserver/ex4Located in DC 16, hard drives have 2185 power on hours (they were both brand new when I first got it).
NIC 1 GBit OnBoard
with 100 Mbps connection
when using a usenet provider, e.g. giganews, I can easily download at 50MB/s +, so...... it sure isn't throttled at 100Mbps