picks are open
-1.4 = gt_addict
-1.2 = philipma1957 as usual If i win I will roll it over.
-0.9 = edonkey
-0.1 = NeuroticFish
+0.2 = Erumara
+0.4 = zebedee
+0.5 = Lindin99
+0.6 = slastar
+0.7 = Merelcoin
+0.8 = vg54dett
+1.1 = ajareselde
+1.2 = wpt1wpt1
+1.3 = ingiltere
+1.4 = ATguy
+1.5 = Veves1
+1.6 = leowonderful
+1.7 = Cuidler
+1.8 = generalt
+1.9 = Mikestang
+2.0 = DanDan
+2.2 = Valkir
+2.3 = pogress
+2.4 = HagssFIN
+2.5 = HerbPean
+2.6 = VRobb
+2.8 = lolxxxx
+2.9 = tss
+3.0 = topiOleg
+3.2 = psi
+3.3 = pusttiu
+3.6 = blindminer
+3.8 = ahmedjamal1998
+4.2 = fr4nkthetank
+4.7 = ezeminer
+5.5 = vapourminer
+6.6 = indiemax
https://bitcoinwisdom.com/bitcoin/difficultyBitcoin Difficulty: 209,453,158,595
Estimated Next Difficulty: 214,573,430,155 (+2.44%)
Adjust time: After 744 Blocks, About 5.1 days >>>> 716 comes in 28 blocks picking will end.
Hashrate(?): 1,537,705,734 GH/s
Block Generation Time(?):
1 block: 9.8 minutes
3 blocks: 29.6 minutes
6 blocks: 59.1 minutes
Updated: 21:55 (3.5 minutes ago)
Off topic
+1.4 = ATguy
Why you doing kitchen reconstruction? Its just wiring? Because the 16th Jun pre gutting kitchen image looks pretty good (except the fridge taking too much space)
The kitchen was 44 years old. Had some semi-repairs here and there.
The fridge was a pulled out and does fit better. My wife and I are retired we both like to cook. She always wanted a hi-end kitchen. So since she has been really good about my world of BTC since I kind of always wanted a really nice kitchen. Since we are over 55 yrs old we said f-it we will spurge.
So we are doing 3 major upgrades to the houses
1) All new sliding doors and a new front storm door. -- Done
2) The kitchen ----- working on it
3) Two bathrooms and the master bedroom closets. ----- In October