Dear all,

First ignore my newbie account, my old account which i lost access to is: https://bitcointalk.org/index.php?action=profile;u=257526

I've recently been working with large mining farm setups.
Have done a farm with 1600GPUs producing about 30Ghs(and expanding) on ethereum. (A combo of 1050tis, 1060s and 1070s)
Currently looking for more work.

If anyone requires a large mining farm setup done ,(I'm talking a couple of crores worth) You can contact me. We have team of people and good ties with GPU suppliers.
We handle everything from sourcing parts to building cooling systems, Electrical wiring and paneling, Internet infrastructure and networking, Building the rigs, Overclocking and software tweaking.


For credibility queries you can PM me and we can talk there. I don't really want to post pictures here and be out in full visibility.
samsan
Newbie
*
Offline Offline

Activity: 53
Merit: 0


View Profile WWW
December 15, 2017, 02:29:54 PM
 #2

Dear all,

First ignore my newbie account, my old account which i lost access to is: https://bitcointalk.org/index.php?action=profile;u=257526

I've recently been working with large mining farm setups.
Have done a farm with 1600GPUs producing about 30Ghs(and expanding) on ethereum. (A combo of 1050tis, 1060s and 1070s)
Currently looking for more work.

If anyone requires a large mining farm setup done ,(I'm talking a couple of crores worth) You can contact me. We have team of people and good ties with GPU suppliers.
We handle everything from sourcing parts to building cooling systems, Electrical wiring and paneling, Internet infrastructure and networking, Building the rigs, Overclocking and software tweaking.


For credibility queries you can PM me and we can talk there. I don't really want to post pictures here and be out in full visibility.

from which region
bitcoinblog
Sr. Member
****
Offline Offline

Activity: 501
Merit: 252


View Profile
December 15, 2017, 03:28:43 PM
 #3

Dear all,

First ignore my newbie account, my old account which i lost access to is: https://bitcointalk.org/index.php?action=profile;u=257526

I've recently been working with large mining farm setups.
Have done a farm with 1600GPUs producing about 30Ghs(and expanding) on ethereum. (A combo of 1050tis, 1060s and 1070s)
Currently looking for more work.

If anyone requires a large mining farm setup done ,(I'm talking a couple of crores worth) You can contact me. We have team of people and good ties with GPU suppliers.
We handle everything from sourcing parts to building cooling systems, Electrical wiring and paneling, Internet infrastructure and networking, Building the rigs, Overclocking and software tweaking.


For credibility queries you can PM me and we can talk there. I don't really want to post pictures here and be out in full visibility.

Buddy from where you are going to get that much Electricity ? And which state will provide you that continuous electricity without failure ?

Even the best state Kerala is facing One hour cutoff on electricity , in that time how many generators are required for 1600 GPU ?

As my calculation 3 Sapphire 7970 Dual X are taking approx 700-750 Wattage producing 2.1 MHS on ScryptCoin. In that case you need .. 1600/3 = 534 x 750 = 400500 Watt = 400.5 Kilowatt in one hour which means 2002.5 INR per day if i calculate it with nominal price of Rs. 5 but i am sure that much unity means your Surcharge will increase.

I have doubt on you now ... are you really serious Mining Farm in IndiaGrin

** FREE SPACE **
jaideep10002 (OP)
Newbie
*
Offline Offline

Activity: 41
Merit: 0


View Profile
December 16, 2017, 01:32:18 PM
 #4

Dear all,

First ignore my newbie account, my old account which i lost access to is: https://bitcointalk.org/index.php?action=profile;u=257526

I've recently been working with large mining farm setups.
Have done a farm with 1600GPUs producing about 30Ghs(and expanding) on ethereum. (A combo of 1050tis, 1060s and 1070s)
Currently looking for more work.

If anyone requires a large mining farm setup done ,(I'm talking a couple of crores worth) You can contact me. We have team of people and good ties with GPU suppliers.
We handle everything from sourcing parts to building cooling systems, Electrical wiring and paneling, Internet infrastructure and networking, Building the rigs, Overclocking and software tweaking.


For credibility queries you can PM me and we can talk there. I don't really want to post pictures here and be out in full visibility.

Buddy from where you are going to get that much Electricity ? And which state will provide you that continuous electricity without failure ?

Even the best state Kerala is facing One hour cutoff on electricity , in that time how many generators are required for 1600 GPU ?

As my calculation 3 Sapphire 7970 Dual X are taking approx 700-750 Wattage producing 2.1 MHS on ScryptCoin. In that case you need .. 1600/3 = 534 x 750 = 400500 Watt = 400.5 Kilowatt in one hour which means 2002.5 INR per day if i calculate it with nominal price of Rs. 5 but i am sure that much unity means your Surcharge will increase.

I have doubt on you now ... are you really serious Mining Farm in IndiaGrin


Hey there,

Current installed capacity for power that we have is about 375kW.

As I said, if you have reason to doubt me, please send me a PM. Will explain everything there.

We pay 2.7 Rupees per killowatt(irrespective of no of units). This is the production rate at which power plants produce power.
I'm not going to go out in public and tell you how we achieve those rates but lets just say we have an agreement with the electric company and some powerful connects.

Also, if you read my post carefully, We don't use outdated cards like the 7970.
The 1070s ,1060s and 1050tis are much more efficient. Hence your 400kW calculation is invalid.

Also we don't have cutoffs. There are switchovers(15min downtime) every two months or so which we can handle.

The problem is not in backup generators but rather power factor correction and harmonic filters.

The 30Ghs setup is fully operational. We mine exclusively on: https://miningpoolindia.com/

Please PM for questions. Avoid spoiling the thread with trivial inquiries. Don't even know why you mentioned 7970s and scrypt. All extremely outdated stuff.
bitcoinblog
Sr. Member
****
Offline Offline

Activity: 501
Merit: 252


View Profile
December 16, 2017, 02:24:43 PM
 #5


Hey there,

Current installed capacity for power that we have is about 375kW.

As I said, if you have reason to doubt me, please send me a PM. Will explain everything there.

We pay 2.7 Rupees per killowatt(irrespective of no of units). This is the production rate at which power plants produce power.
I'm not going to go out in public and tell you how we achieve those rates but lets just say we have an agreement with the electric company and some powerful connects.

Also, if you read my post carefully, We don't use outdated cards like the 7970.
The 1070s ,1060s and 1050tis are much more efficient. Hence your 400kW calculation is invalid.

Also we don't have cutoffs. There are switchovers(15min downtime) every two months or so which we can handle.

The problem is not in backup generators but rather power factor correction and harmonic filters.

The 30Ghs setup is fully operational. We mine exclusively on: https://miningpoolindia.com/

Please PM for questions. Avoid spoiling the thread with trivial inquiries. Don't even know why you mentioned 7970s and scrypt. All extremely outdated stuff.

Its ok , if u have contract with private firms generation electricity. But don't expect someone will just PM you without Trivial Question. You made thread in a public forum so trivial questions are obvious.

Yes 7970 is Old but still in market.

And miningpoolindia.com is a proxy hidden domain , how come i know from where your company came from. And if you are confident in your business then things should be publicly clear. Or you are hiding something ?

Listen we are not expert but we are not dumb too. So discuss in public may be not me but others will get interest and offer you something big. But that only possible if you not force others not to discuss in public.


** FREE SPACE **
jaideep10002 (OP)
Newbie
*
Offline Offline

Activity: 41
Merit: 0


View Profile
December 16, 2017, 04:15:06 PM
Last edit: December 16, 2017, 06:49:32 PM by jaideep10002
 #6


Hey there,

Current installed capacity for power that we have is about 375kW.

As I said, if you have reason to doubt me, please send me a PM. Will explain everything there.

We pay 2.7 Rupees per killowatt(irrespective of no of units). This is the production rate at which power plants produce power.
I'm not going to go out in public and tell you how we achieve those rates but lets just say we have an agreement with the electric company and some powerful connects.

Also, if you read my post carefully, We don't use outdated cards like the 7970.
The 1070s ,1060s and 1050tis are much more efficient. Hence your 400kW calculation is invalid.

Also we don't have cutoffs. There are switchovers(15min downtime) every two months or so which we can handle.

The problem is not in backup generators but rather power factor correction and harmonic filters.

The 30Ghs setup is fully operational. We mine exclusively on: https://miningpoolindia.com/

Please PM for questions. Avoid spoiling the thread with trivial inquiries. Don't even know why you mentioned 7970s and scrypt. All extremely outdated stuff.

Its ok , if u have contract with private firms generation electricity. But don't expect someone will just PM you without Trivial Question. You made thread in a public forum so trivial questions are obvious.

Yes 7970 is Old but still in market.

And miningpoolindia.com is a proxy hidden domain , how come i know from where your company came from. And if you are confident in your business then things should be publicly clear. Or you are hiding something ?

Listen we are not expert but we are not dumb too. So discuss in public may be not me but others will get interest and offer you something big. But that only possible if you not force others not to discuss in public.




It's alright.
The pool is hosted on cloudfare with servers in Delhi. You can do a traceroute to check.
I don't really handle the pool stuff so can't say much there.

I only did the setup, I have no ownership in it.

I mainly handle choosing hardware, electric panels(I have a degree in electrical engg), harmonic filters and cooling systems.
We have separate people for networking and such.

I'm not hiding anything. Let me know everything that you want to know.
But certain things like the location and all I cannot disclose since I don't own the place and am merely doing the setup.
Just want to put out in public that if anyone needs a large farm setup(a couple crores investment) then we can do that.

Also I didn't properly understand the final paragraph you posted. Hindi bhi aati hai so you can type in that Cheesy

By trivial queries I meant irrelevant stuff like the 7970 and mining scrypt coins with GPUs.
Even the 750ti is available in the market but pretty sure no one uses those cards these days(unless their incredibly ill informed and can't do their research)


Good day.
Pages: [1]
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.19 | SMF © 2006-2009, Simple Machines Valid XHTML 1.0! Valid CSS!