March 08, 2018, 04:22:44 PM |
|
fanatic26, My bad on posting this in the wrong place, I'm a newbie. Thank you to whomever moved it to the proper location.
Yes, there are several places out there that advertise lower offerings than us, but most of them are out of power, and they aren't true data center environments. We are a true data center with a decade running as one. We have a 40MW substation, and are only using about 12MW at this time. Anyone that needs more than 100kW contact me. If you truly need $250kW, email me and lets see if we can work out something aggressive enough to entice you!!!
We aren't putting these in a warehouse or some building we signed a lease on overnight that has no cooling or electrical configuration. We are just offering a service if someone doesn't want to put up with the indirect costs, noise, and heat that come with these things. Were also not going to have someone ship their gear hear and give them the run around while we are mining our own coin on someone else's machines telling them a bunch of lies. Were in the power, space, bandwidth in a secure environment business, nothing else.
|