Hey Guys,
I'm getting to the point where I am about ready to flip the big switch outside and start bringing miners online and just wanted to get another set of eyes just to make sure I'm not doing anything terribly egregious in regards to how things are set up.
I have two sperate service runs in the space I am in. They are both 3/0 runs to separate 225 Amp panels. One panel has lights and fixtures on it for the space so I will be leaving it alone. The other is bare (no breakers or circuits) so I will be using that one to stand up the first pod.
Panel Notes: Stinger Hi-Leg configuration A - Single Phase 120v B - Three phase 208v C - Single Phase 120v
I'm using 30 Amp tree-pole breakers and only running off of the 120v lugs Since this is a service panel the Ground and Neutral are bonded.
25ft EMT run to L6-30 receptacles using 10 AWG wire Each receptacle will connect to a 30A 208/240v PDU Miners connect to PDU which has 8 Amp fuses on outlets Two shorter runs to power two 120v receptacles for other devices, each on a separate 1 pole breaker
Airflow looks like so:
Air > Filter > Enclosure > Blower Fan > S9 Bank > Exhaust into empty space > Extracted outside
Questions: Anything look terribly out of place? I'm open to suggestions/feedback.
Since neutral and Ground are bonded at the panel then running either is just for organization's sake? As an example, wiring up a 120v outlet will take a red (hot) and white wire (neutral/ground). There will be no green ground wire since the neutral is already bonded to it at the panel.
Anyone willing to recommend a power/temp logger?
I just remembered to double check to see if the panel is grounded as well, if not I will ground it to the tap in the box. All of the receptacle boxes are grounded as well.
|