The super controversial Rossi ECAT 1MW plant is now available on the market. It takes 200 kilowatts of input power and claims to deliver 1 Megawatt of output power.
UPDATE - Looking at the dates of the FAQ. The ecat.com site was put up in November 2011.
Sign up and pre-order, and secure your place on a waiting list with the right to priority treatment and faster product delivery.
The ECAT 1MW plant contains 106 smaller ECAT units mounted in a shipping container. Valve for filling the Hydrogen is on the front of each unit, together with electrical connection to the immersion heater used to start the reaction.
Production & Manufacturing plans are under way 2013. Current delivery time is estimated to four months. Warranty for functionality is two years with a guaranteed COP of 6, and the plant has an expected life span of 30 years.
The ECAT 1MW plant is constructed inside an international standardized 20ft container which can easily be transferred between different modes of transportation (e.g. ships, air cargo, trains and trucks).
The plant consists of small parallel modules. Each reactor contains three cores and consumes small amounts of treated Nickel powder and Hydrogen gas (under pressure, approx. 15 bar). The plant is recharged by specially trained and certified personnel.
http://nextbigfuture.com/2013/11/andrea-rossi-and-his-company-are-taking.html