Bitcoin Forum
November 19, 2024, 05:06:33 PM *
News: Latest Bitcoin Core release: 28.0 [Torrent]
 
   Home   Help Search Login Register More  
Pages: [1]
  Print  
Author Topic: CryptoSolarTech will build the largest cryptocurrency mining farm in Spain with  (Read 158 times)
Baturs (OP)
Newbie
*
Offline Offline

Activity: 1
Merit: 0


View Profile
May 10, 2018, 08:03:35 PM
 #1


https://sphere.social/hello/blogs/view/3431/cryptosolartech

CryptoSolarTech, a pioneering project to build the largest cryptocurrency mining farm in Spain, will consist of a mining farm that will extract cryptocurrencies and a photovoltaic plant that will supply the large volume of energy required by these equipment. Specifically, 3,000 equipment will be installed in the mining farm located in the province of Malaga, in a warehouse already enabled.

The solar power plant will be located in the province of Seville, with the aim of taking advantage of the good climate of this province. With this solution Cryptosolartech tends to solve the high energy consumption that cryptomoneda mining requires since it is the main problem in this sector. The miners suppose an enormous energetic cost for his operation due to the enormous mathematical calculations that the processors have to do. It should be noted that the life of the cryptomonedas is strictly linked to electricity.The pools consume about 1.3 KWh of electricity, in addition to the large consumption of electricity, we find that in some countries, rich in coal and oil, energy becomes cheaper by burning polluting fuels and causing more pollution and in turn a higher demand that causes an increase in CO2 emissions.The proposed solution is to create a solar photovoltaic group, capable of generating 45,000kW, enough energy to supply the mining farm.

Respira Energía will buy the energy from this plant and then send it to the farm located in Malaga, which will make mining sustainableand profitable, without the need for common electricity. Respira Energía uses only clean energy, a company whose origin of central production is 100% free of CO2.CryptoSolarTech has already signed an energy purchase contract for 15 years with the company Respira Energía (https://cryptosolartech.org/doc/PPA-SERVICES-CONTRACT-CRYPTOSOLARTECH-SL.pdf , responsible for supplying interested consumers Cryptosolartech is an ERC-20 type token that will work in the Ethereum Blockchain. The CST token is classified as a utility token, so that all owners have the right to use the acquired assets and can request their exploitation and use at the time they require it. For this ICO a set of 1260 million chips of Cryptosolartech will be issued. All tokens that are not sold during the ICO will be burned. No more tokens will be issued in the future. The initial value of 1 CST is equal to 0.10 Euros.
ICO Phases
 
PHASE   START DATE   Nº OF TOKENS   PRICE €   TOTAL €
PRE-ICO   16-04-2018   210.000.000   0.05   10.500.000
PHASE 1   01-05-2018   210.000.000   0.06   12.600.000
PHASE 2   16-05-2018   210.000.000   0.07   14.700.000
PHASE 3   31-05-2018   210.000.000   0.08   16.800.000
PHASE 4   15-06-2018   168.000.000   0.10   16.800.000
 
 
Once the plant is launched, both those who bought the token and future customers, whether inexperienced users or specialists, will have an automated system that will give them the possibility to mine the cryptocurrencies they choose using the platform at their convenience. For this, they will be able to configure all the aspects they want in the personalized area of the proportional part of the farm they have acquired through the tokens. CryptoSolarTech, "Our expectations are to get to the 'Hard' of the project, and create a completely autonomous system so that anyone can create their own cryptocurrencies if they have to be an expert in the field." CryptoSolarTech, "We also see a future in which this farm can continue to do R & D in renewable energy, and we are already in talks with the Platasol group to include a Biogas plant and other alternatives that are environmentally responsible with the environment.
 
Buy Tokens:    https://crowdsale.cryptosolartech.org/en/login
 
whitepaper:     https://cryptosolartech.org/doc/cryptosolartech-whitepaper-en.pdf
 
web:                https://cryptosolartech.org/en/
 
Telegram:        https://t.me/cryptosolartechEN
                        https://t.me/cryptosolartech
 
Facebook:       https://www.facebook.com/cryptosolartech/
 
Twitter:            https://twitter.com/cryptosolartech
 
 
 The largest mining pool with renewable energy in Spain.


Nisansala
Member
**
Offline Offline

Activity: 384
Merit: 11

First LEARN then EARN


View Profile WWW
May 25, 2018, 11:23:36 AM
 #2


https://sphere.social/hello/blogs/view/3431/cryptosolartech

CryptoSolarTech, a pioneering project to build the largest cryptocurrency mining farm in Spain, will consist of a mining farm that will extract cryptocurrencies and a photovoltaic plant that will supply the large volume of energy required by these equipment. Specifically, 3,000 equipment will be installed in the mining farm located in the province of Malaga, in a warehouse already enabled.

The solar power plant will be located in the province of Seville, with the aim of taking advantage of the good climate of this province. With this solution Cryptosolartech tends to solve the high energy consumption that cryptomoneda mining requires since it is the main problem in this sector. The miners suppose an enormous energetic cost for his operation due to the enormous mathematical calculations that the processors have to do. It should be noted that the life of the cryptomonedas is strictly linked to electricity.The pools consume about 1.3 KWh of electricity, in addition to the large consumption of electricity, we find that in some countries, rich in coal and oil, energy becomes cheaper by burning polluting fuels and causing more pollution and in turn a higher demand that causes an increase in CO2 emissions.The proposed solution is to create a solar photovoltaic group, capable of generating 45,000kW, enough energy to supply the mining farm.

Respira Energía will buy the energy from this plant and then send it to the farm located in Malaga, which will make mining sustainableand profitable, without the need for common electricity. Respira Energía uses only clean energy, a company whose origin of central production is 100% free of CO2.CryptoSolarTech has already signed an energy purchase contract for 15 years with the company Respira Energía (https://cryptosolartech.org/doc/PPA-SERVICES-CONTRACT-CRYPTOSOLARTECH-SL.pdf , responsible for supplying interested consumers Cryptosolartech is an ERC-20 type token that will work in the Ethereum Blockchain. The CST token is classified as a utility token, so that all owners have the right to use the acquired assets and can request their exploitation and use at the time they require it. For this ICO a set of 1260 million chips of Cryptosolartech will be issued. All tokens that are not sold during the ICO will be burned. No more tokens will be issued in the future. The initial value of 1 CST is equal to 0.10 Euros.
ICO Phases
 
PHASE   START DATE   Nº OF TOKENS   PRICE €   TOTAL €
PRE-ICO   16-04-2018   210.000.000   0.05   10.500.000
PHASE 1   01-05-2018   210.000.000   0.06   12.600.000
PHASE 2   16-05-2018   210.000.000   0.07   14.700.000
PHASE 3   31-05-2018   210.000.000   0.08   16.800.000
PHASE 4   15-06-2018   168.000.000   0.10   16.800.000
 
 
Once the plant is launched, both those who bought the token and future customers, whether inexperienced users or specialists, will have an automated system that will give them the possibility to mine the cryptocurrencies they choose using the platform at their convenience. For this, they will be able to configure all the aspects they want in the personalized area of the proportional part of the farm they have acquired through the tokens. CryptoSolarTech, "Our expectations are to get to the 'Hard' of the project, and create a completely autonomous system so that anyone can create their own cryptocurrencies if they have to be an expert in the field." CryptoSolarTech, "We also see a future in which this farm can continue to do R & D in renewable energy, and we are already in talks with the Platasol group to include a Biogas plant and other alternatives that are environmentally responsible with the environment.
 
Buy Tokens:    https://crowdsale.cryptosolartech.org/en/login
 
whitepaper:     https://cryptosolartech.org/doc/cryptosolartech-whitepaper-en.pdf
 
web:                https://cryptosolartech.org/en/
 
Telegram:        https://t.me/cryptosolartechEN
                        https://t.me/cryptosolartech
 
Facebook:       https://www.facebook.com/cryptosolartech/
 
Twitter:            https://twitter.com/cryptosolartech
 
 
 The largest mining pool with renewable energy in Spain.




WoW, I think this ICO is very valuable. because Cryptosolartech has a great concept with well-experienced development team. I can recommend this ICO to my friend. You can find more details in, their website.
Do your own research yourself
WebSite - https://cryptosolartech.org/en/

kotwica666
Legendary
*
Offline Offline

Activity: 2282
Merit: 1035



View Profile
June 24, 2018, 09:46:32 AM
 #3

It seems that the ICO has a chance to end before the deadline. Does anyone know when the distribution of tokens will be made?

.
..........
██████████████████████████████████████████████████████████████
██████████████████████████████████████████████████████████████
█████████████░░██████████████████████████░░███████████████████
███████████████░░██████████████████████████░░█████████████████
█████████████████░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░███████████████
█████████████████░░░░░░░░░░██░░██░░░░░░░░░░██░░███████████████
███████████████████░░░░░░██░░██████░░░░░░██░░█████████████████
█████████████████████░░░░░░██████████░░░░░░███████████████████
██████████████████████████████████████████████████████████████
██████████████████████████████████████████████████████████████
██████████████████████████████████████████████████████████████

▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀
.
.....I AM BLACKJACK.FUN.....
██████████████████████████████████████████████████████████████
██████████████████████████████████████████████████████████████
█████████████░░██████████████████████████░░███████████████████
███████████████░░██████████████████████████░░█████████████████
█████████████████░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░███████████████
█████████████████░░░░░░░░░░██░░██░░░░░░░░░░██░░███████████████
███████████████████░░░░░░██░░██████░░░░░░██░░█████████████████
█████████████████████░░░░░░██████████░░░░░░███████████████████
██████████████████████████████████████████████████████████████
██████████████████████████████████████████████████████████████
██████████████████████████████████████████████████████████████

▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀
.
..........
Pages: [1]
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.19 | SMF © 2006-2009, Simple Machines Valid XHTML 1.0! Valid CSS!