DHL is always 3 days express, you'll know more obviously when tracking is sent. Watch for duties with a unit count of 2 since the package will be above de minimus value.
I think he is Canada and is subject to 5% but I talk to so many people in pm's I am not sure if I have him placed correctly.
It is cold in NJ today about -1C or 31f
So I cranked it up to full power it is doing 31.3 th at 2275 watts which is 72 watts
I don't mind that it is less efficient as the place in the new solar array will let us do 50-50 on coins.
This should be a good setup for us.
A mix of new gear and old gear.
4 M10's = 130th = 9200 watts
15 s9's = 200th = 19125 watts
1 A921 = 20th = 1900 watts
2 A721 = 10th = 2100 watts
4 S7ln = 10th = 2400 watts
1 t2turbo = 20th = 1600 watts
10 L3+ = 5gh = 11200 watts
total of 47525 watts
the way New Jersey Works we need establish a 40kwatts 24/7/365 power draw
so we will pull 50kwatts for 4-6 months
get the solar in and drop to 40kwatts
the A721
the s7ln do 4kwatts and will be dropped first
then we will drop s9's 5 s9s' is 6.5 kwatts
that is 10.5 so we would be under 40 as 47.5-10.5 = 37kwatts
we will be adding m10's 1 at a time for months to come.
so the current 390 th will grow even thou we drop our watts from 47kwatt to 37kwatt
what is nice is the warehouse is so big we can provide 90kwatts 18x 30 amp 240 volt circuits
only 40kwatt would be solar but if we get a runup in coins we can fire up the old gear.
the plan is to go all m10 as 16 x 2300 = 36800 watts on high speed
and just have the old gear do nothing. we could even go to 30 m10's at low speed as 30 x 1280 = 38400 watts
and 30 x 21 th = 630th all solar and if we have a runup we could do
30 x 2300 = 69kwatts
30 x 31.3 = 939 th
When I go to the new spot I will do some photos I need be careful to not expose building location etc.