Bitcoin Forum
May 07, 2024, 07:48:48 PM *
News: Latest Bitcoin Core release: 27.0 [Torrent]
 
   Home   Help Search Login Register More  
Pages: « 1 [2]  All
  Print  
Author Topic: VNS of AMT Community  (Read 457 times)
VNS (OP)
Newbie
*
Offline Offline

Activity: 103
Merit: 0


View Profile
April 19, 2019, 01:33:34 PM
 #21

VNS
technology:
1. Bangke (UP) tool development, adding full deployment process functions;
2, Bangke (UP) tool development, new account release points list;
3, Bangke (UP) tool development, new issued points white list rights management and information editing functions;
4, Bangke (UP) tool development, new pre-release points test function;
5, Cointome v2.1.0 version requirements collection, analysis and planning, currently includes general points and UP points classification, permissions and UI transformation;
6. Cointome gets bug fixes caused by price failures;
7. Completed the development of some VNS modules;
8. Completed the construction and commissioning of the new mining pool;
9. Provide technical support for customer functions such as CoinX, Alltoken, QT and other ecological partners;
10. The initial development of the new browser www.vnsblock.com developed by Hangzhou Minhang Network Co., Ltd. has been completed, and plans to add more functions such as token query.


Ecological cooperation:
1. Conducted the negotiation of the UP Eco-Partners project, and determined the economic model and overall design plan. The progress of the project will be updated and explained in the official channels;
2. On March 20th, in order to protect the personal interests of AMT community participants, maintain the ecological atmosphere of AMT community, improve the service quality of AMT community, and provide the best win-win growth soil for quality projects, the community released “AMT”. Community Ecology Project Win-Win Plan";
3. On March 25th, the first batch of airdrop rewards for AMT community was announced. The AMT community completed the first batch of awards according to the earlier agreement;
4. On April 8th, the ninth offline activity of Nakamoto Cong Institute and the AMT community held the second offline Meetup in Shenzhen in 2019;
5. On April 10th, in order to better serve the community users, it is convenient for everyone to understand, use and publicize the intelligent economic score system on the VNS blockchain system. After the community discussion, the “VNS blockchain intelligent economic score system” is officially Named "helper" (English name "Union Point" for short);
6. The AMT community, as an eco-partner, reached a cooperation intention with the Huobi club, and as a support unit, supported the Huobi club's offline meeting of “Fire Coin Global Wuhan Station” held on April 22.



Exchange:
1. On April 3, 2019, VNS broke through 1 cent;
2. CoinX goes online with VNS/USDT, VNST/USDT, and VNST/ETH transaction pairs;
3, CoinX online CXE / VNS help customers redemption page, users can easily complete two-way exchange in CoinX.

XMC
1. Completed the development of XMC offline wallet interface ;
2. Conducted debugging of the XMC online CoinX exchange.


The Bitcoin network protocol was designed to be extremely flexible. It can be used to create timed transactions, escrow transactions, multi-signature transactions, etc. The current features of the client only hint at what will be possible in the future.
Advertised sites are not endorsed by the Bitcoin Forum. They may be unsafe, untrustworthy, or illegal in your jurisdiction.
1715111328
Hero Member
*
Offline Offline

Posts: 1715111328

View Profile Personal Message (Offline)

Ignore
1715111328
Reply with quote  #2

1715111328
Report to moderator
1715111328
Hero Member
*
Offline Offline

Posts: 1715111328

View Profile Personal Message (Offline)

Ignore
1715111328
Reply with quote  #2

1715111328
Report to moderator
VNS (OP)
Newbie
*
Offline Offline

Activity: 103
Merit: 0


View Profile
May 14, 2019, 03:43:37 PM
Last edit: May 14, 2019, 04:04:42 PM by VNS
 #22

In order to enhance the core competitiveness of the AMT community, expand the AMT community ecology, enhance the influence of the AMT community at home and abroad, and realize the organic integration of AMT community technology, ecology and community, and effectively promote the rapid development channel of the AMT community into the vision, the AMT community decided to establish AMT Ecological Cooperation Special Development No. 1 Plan (hereinafter referred to as “No. 1 Plan”).

No. 1 Plan is a plan manager by Mr. Gao Dongliang and his team led by AMT community co-constructor. He is committed to the internationalization, diversification and professionalization of the AMT community. The total scale is preset to 900 million VNS. The five sub-plans are set up in five phases according to the actual development progress:

The first one is to set up an eco-cooperation initial promoter program with a scale of 200 million VNS. This sub-plan is mainly used for the start-up work of Abu Dhabi ecological cooperation, ecological cooperation of overseas economies, and ecological co-construction of small and medium-sized enterprises. This sub-plan was established immediately with the launch of the No. 1 Plan project.

The second item is the establishment of the Abu Dhabi Ecological Cooperation Development Sub-plan, with a scale of 200 million VNS. This sub-plan is mainly used for the follow-up development of regional ecological cooperation in Abu Dhabi, and promotes the continuous and effective implementation of the VNS main network in the financial system of Abu Dhabi. The sub-plan will launch VNS on at least one compliant exchange with a legal currency channel and open a VNS/USD transaction pair; after the VNS main network-based collateralized stable currency AUSD is launched, a 100 million VNS plan will be established.

The third item is to establish an African blockchain ecological cooperation development sub-plan with a scale of 200 million VNS. This sub-plan is mainly used for the ecological development of blockchain in Africa, and promotes the VNS main network to become an important supporting carrier for the blockchain in the African region. This sub-project was established after the VNS project officially landed in Africa, operated stably for 12 months and passed the community acceptance.

The fourth item is to set up a high-quality SME ecological co-construction sub-project with a scale of 200 million VNS. This sub-plan is mainly used for the ecological development support of high-quality small and medium-sized enterprises at home and abroad, such as business development, community marketing, product promotion, etc., and promotes the VNS main network to implement the blockchain service entity economic mission. This sub-plan will be set up with 100 million yuan immediately after the launch of No. 1 Plan, and the remaining 100 million will be established after all the 10 projects have passed the assessment of the “quality project” in the community. The assessment period is 6 months after the project has submitted the “Quality Project” assessment.

The fifth item is to establish a global sub-plan of AMT quality community nodes with a scale of 100 million VNS. This sub-plan is mainly used to create global community nodes, strengthen the cohesiveness of the AMT community, promote internal and external interactions in the AMT community, and promote the exploration and cultivation of the world's global talents, absorb and learn from the industry's advanced technologies, and comprehensively promote blockchain technology and The integration of the local economic system will eventually achieve the goal of VNS and blockchain technology to fully realize its social benefits. This sub-program is set up after the “high-quality community” assessment of seven global high-quality community nodes. The assessment period is 6 months after the community node submitted a “quality community” assessment in writing.

The establishment of this No. 1 Plan is valid from the date of the announcement. The deadline for the start of the second and third operations and the deadlines for the fourth and fifth written submissions are June 30, 2020. The full plan deadline is June 30, 2021. The order of the above five sub-plans is set up. Except for the first and fourth sub-projects, the other establishments are not in order, and are set up according to the actual ecological development. Before the sub-plan is formally established, the development progress and results of the current pre-established plan will be publicized in the community, and the formal establishment process will be initiated after the publicity period. In order to promote the sustainable development of the overall ecological environment of the AMT community, in addition to the establishment of the No. 1 Plan, the AMT community will set up a special plan according to the community development progress and actual needs. The establishment of the special plan will be subject to the announcement of the current plan.

All AMT community members are required to witness and supervise the plan and follow-up plan in accordance with the open and fair community principles, and support the plan and follow-up plan with the community principle of paying off and returning, and actively participate.
Attachment: AMT Ecological Cooperation Special Development No. 1 Plan Sub-plan Establishment Table
Special announcement.

May 14, 2019
AMT community



AMT Ecological Cooperation Special Development No. 1 Plan Sub-plan Establishment Table:

Subplan number       Subplan name                                Scale                            Set up time node

1                                   Eco-cooperation launch                    200 million                       Set up now
                                    special sub-plan


2                                 Abu Dhabi Ecological Cooperation        200 million        At least one compliant exchange
                                                                                                                  with a legal currency channel is
                                                                                                                  launched on the VNS, and at
                                                                                                                  least 100 million VNS is
                                                                                                                  established after the VNS/USD
                                                                                                                  transaction is opened;
                                                                                                                  The currency-backed stable
                                                                                                                 currency AUSD of the VNS main
                                                                                                                  network is officially launched,
                                                                                                                 and the AUSD must meet the
                                                                                                                 following criteria:
                                                                                                                  1. Being legally regulated by the
                                                                                                                  government;
                                                                                                                  2. Regularly audited by a third
                                                                                                                  party;
                                                                                                                  3. AUSD uses French currency
                                                                                                                 as the mortgage model;
                                                                                                                 4. The mortgage reserve is not
                                                                                                                  less than 10 million USD;
                                                                                                                  Established 100 million VNS
                                                                                                                  after going online;



3                                 African blockchain ecological
                                 cooperation development sub-plan              200 million        The VNS project was                            
                                                                                                                         launched in Africa, stable
                                                                                                                        operation fo 12 months and
                                                                                                                       established after acceptance.



4                                 SME Eco-Building Sub-Program                200 million         Immediately set up 100
                                                                                                                        million VNS;10 high-quality
                                                                                                                        projects have all joined the
                                                                                                                        VNS ecosystem and set up
                                                                                                                       100 million VNS after
                                                                                                                        passing the “Quality Project”
                                                                                                                        assessment; (the platform
                                                                                                                       type with no pledge of at
                                                                                                                       least 10 million VNS, no
                                                                                                                       whitelist project can be a
                                                                                                                       quality project, and other
                                                                                                                       high-quality projects are
                                                                                                                       judged one by one)


5                       Global Quality Community Node Sub-Program      100 million   After the seven global high-
                                                                                                                     quality AMT community nodes
                                                                                                                     were formed and passed the
                                                                                                                     “Quality Community”
                                                                                                                       assessment, each node set
                                                                                                                    up 14.285 million VNS (the
                                                                                                                   quality international community
                                                                                                                     was established in the United
                                                                                                                       Kingdom, the United States,
                                                                                                                      Switzerland, the United Arab
                                                                                                                     Emirates, Japan, South Korea,
                                                                                                                    Hong Kong).


                                      Total(VNS)                       900 million                 Established 300 million
                                                                                                              immediately since May 2019; the
                                                                                                              rest 600 million is set up according
                                                                                                              to actual development. The
                                                                                                             deadline for the start of the second
                                                                                                             and third operations and the
                                                                                                           deadlines for the fourth and fifth
                                                                                                           written submissions are June 30,
                                                                                                           2020. The full plan deadline is June
                                                                                                           30, 2021.
VNS (OP)
Newbie
*
Offline Offline

Activity: 103
Merit: 0


View Profile
May 21, 2019, 11:02:23 AM
 #23

On a wonderful day at 521, the AMT community will send 30 tickets.
How to get the ticket: Follow @AMT_Community's Weibo and forward the Weibo. On May 23, 30 fans will be selected, and each participant will receive a ticket for the conference.
VNS (OP)
Newbie
*
Offline Offline

Activity: 103
Merit: 0


View Profile
May 22, 2019, 01:17:11 PM
 #24

In order to give full play to the advantages of the economic model of the guest system, cooperate with the VNS cooperation to strengthen the construction of its own system, incubate its own ecological projects, and promote the formation of multilateral platforms. The AMT community has completed the upgrade and development of the BangKe system.

This upgrade adds the "NEST" component, which improves the efficiency and accuracy of multi-contract collaboration, ensuring the stability and scalability of calls between customer contracts. In order to protect the basic interests of AMT community users, the AMT community will cooperate with the CoinX exchange to complete the “NEST” upgrade by means of mapping. The points participating in this upgrade are CXE, LOTS, FUNS, GNT (hereinafter referred to as “above BangKe points”. "). This upgrade is expected to take 5 days. The specific process is as follows:
1. Announcement
(May 22, 2019, PM 6:00)
2. The above BangKe points are temporarily stop redeemeding and will be offlined (CoinX, COINTOME sync)
(May 24, 2019, PM 3:00)
3. The above BanKe points are temporarily stop depositing and withdrawing
(May 27, 2019 AM 11:00)
4. All asset mapping
(May 27, 2019, PM 6:00)
5.The deposit and withdraw functions will be opened, all above BangKe points will be opened on exchange and go online (CoinX, COINTOME synchronization) (May 28, 2019 AM 11:00)

After the asset mapping is completed, please add new and above customer points in Cointome. At the same time, users can withdraw, deposit or participate in the redemption of new and above BangKe points according to their needs. This "NEST" upgrade CoinX will be the only mapping channel, please be sure to recharge the above BangKe points to the CoinX platform before 11:00 am on May 27, 2019 to ensure that the assets are not lost.


AMT Community
VNS (OP)
Newbie
*
Offline Offline

Activity: 103
Merit: 0


View Profile
May 23, 2019, 01:39:26 PM
 #25

In order to give full play to the advantages of the economic model of the guest system, cooperate with the VNS cooperation to strengthen the construction of its own system, incubate its own ecological projects, and promote the formation of multilateral platforms. The AMT community has completed the upgrade and development of the BangKe system.

This upgrade adds the "NEST" component, which improves the efficiency and accuracy of multi-contract collaboration, ensuring the stability and scalability of calls between customer contracts. In order to protect the basic interests of AMT community users, the AMT community will cooperate with the CoinX exchange to complete the “NEST” upgrade by means of mapping. The points participating in this upgrade are CXE, LOTS, FUNS (hereinafter referred to as “above BangKe points”. "). This upgrade is expected to take 5 days. The specific process is as follows:
1. Announcement
(May 22, 2019, PM 6:00)
2. The above BangKe points are temporarily stop redeemeding and will be offlined (CoinX, COINTOME sync)
(May 24, 2019, PM 3:00)
3. The above BanKe points are temporarily stop depositing and withdrawing
(May 27, 2019 AM 11:00)
4. All asset mapping
(May 27, 2019, PM 6:00)
5.The deposit and withdraw functions will be opened, all above BangKe points will be opened on exchange and go online (CoinX, COINTOME synchronization) (May 28, 2019 AM 11:00)

After the asset mapping is completed, please add new and above customer points in Cointome. At the same time, users can withdraw, deposit or participate in the redemption of new and above BangKe points according to their needs. This "NEST" upgrade CoinX will be the only mapping channel, please be sure to recharge the above BangKe points to the CoinX platform before 11:00 am on May 27, 2019 to ensure that the assets are not lost.


AMT Community
VNS (OP)
Newbie
*
Offline Offline

Activity: 103
Merit: 0


View Profile
June 13, 2019, 12:30:50 PM
 #26

Community colleagues:
Recently, the VNS mine suddenly suffered a DDOS network attack. Until the letter of noon on June 11th, the attack did not stop, resulting in an abnormal operation of the mine pool, which caused obstacles for a large number of miners to participate in the VNS ecological construction. In the first time after the attack, the team responded urgently and used multiple means to defend against the attack. Now the VNS mining pool mining service has been restarted and all resumed operation; this attack is only for the mining pool, solo mining is not affected, VNS The main network function has not been affected by this, and the full function of the main network is working normally. Please let the community colleagues know.

DDOS attacks are a kind of attack behavior that often attacks the network security . The major mining pools of BTC and other projects have been frequently attacked during the development process. Such behaviors have been suspected of crimes. This attack may be caused by Very few solo miners initiated and tried to take advantage of a larger percentage of computing power. We will record evidence, trace the person responsible for the attack and deal with it according to law. Here we advise people with bad behavior not to excessively pursue personal interests and harm others' interests and do harm to the network. We must know that Skynet is restored and not leaking. At the same time, we have made the following measures to strengthen the ability of the mine to resist risks. Provide better quality pool services:
1. Load DDOS protection services from professional vendors to improve security and increase the cost of attackers;
2. Improve the isolation of the mining pool and the risk of attacking the calculation power;
3. Contact professional third-party partners to obtain technical support to further improve the professionalism of the mining pool;

It is well known that the development requirements of the public chain are very high, labor-intensive, and time-consuming. Only when there is a solid foundation to do things, there is a glimmer of hope for success. The VNS team is taking such a difficult road: after 94 major environmental changes in 2017, In 2018, experienced the global bear market; in 2019, was maliciously impersonated by an unknown project, and was later involved in an illegal project attempt; by now, the off-site group was maliciously reported to the group, and then the non-profit mine was attacks;Immediately after the OTC group of people took the opportunity to go short, the market was squatting, and a considerable number of miners and ecological participants were damaged. But since we have chosen this path, we are only persistent and persistent. We have actively contacted the beneficiaries and miners in this incident to properly handle the difficulties, and hope that all colleagues will help to convey, and then everyone will use this series of storms to deepen their understanding of the industry, improve their resolution, and face the various twists and turns in the future. Be able to think independently, be careful, and avoid being plundered and harmed.

VNS is still very weak, and it is conceivable that the road ahead is still difficult and long-term, and the foreseeable and unpredictable wind and rain will continue to hit. It’s hard to see the rainbow without going through the storm. We will continue to focus most of our efforts on the development of models such as the main network and the basic wallet and BangKe, taking into account the improvement of the maintenance level of the mines, preventing the recurrence of similar incidents, and striving to provide the society as soon as possible. Secure and reliable underlying service of blockchain.

Thank you for your long-term help and support. As long as the community is united, it will be difficult for everyone to be beaten!

VNS project team
2019-6-11
VNS (OP)
Newbie
*
Offline Offline

Activity: 103
Merit: 0


View Profile
June 24, 2019, 09:26:19 AM
 #27

Since the VNS UP(Chinese name is BangKe) system was put into operation, the VNS Ecology has officially entered the initial stage of comprehensive development. Various ecological participants have actively joined, and the VNS ecosystem has taken shape. In order to improve the sustainability of VNS ecosystem development, maintain the stability of VNS main network operation, promote the subsequent economic, technological and industrial activities to achieve effective development, optimize ecological economic structure, stabilize ecological supply and demand, and maintain ecological sustainability. For the purpose of development, the AMT community decided to upgrade the VNS codenamed “NUT”. The upgrade includes:

1.The block difficulty algorithm is upgraded, which further improves the adaptability of the main network difficulty and the computing power matching, and enhances the flexibility of the main network difficulty adjustment.
2.The interface preparation for the subsequent EVM update, the new EVM update test has been completed, will be added according to the VNS ecological development progress.
3. VNS production changes, VNS standard production was adjusted from the original 735 million/year to 550 million/year, and the output was reduced by 25%. That is, the miner's single block reward is adjusted from the original 209.356VNS/block to 157.017VNS/block; the fund unlock is adjusted from the original 121.21VNS/block to 90.90VNS/block; the team unlock is adjusted from the original 18.359VNS/block to 13.769VNS/block. The production reduction is expected to last for one year. The follow-up AMT community will decide whether to continue to reduce production according to the development progress and actual demand of VNS, in order to maintain the effectiveness of VNS ecological infrastructure construction and strengthen ecosystem stability.

The upgrade will be effective at 24,478,018. The AMT community will cooperate with various eco partners to carry out technical support related to the upgrade. Please cooperate with each partner.



AMT community
   June 23, 2019
VNS (OP)
Newbie
*
Offline Offline

Activity: 103
Merit: 0


View Profile
June 24, 2019, 01:16:26 PM
 #28

Because the current VNS ecosystem has begun to take shape and its value has grown steadily, in order to better facilitate the VNS ecological participants, promote the VNS basic computing power, and maintain the VNS basic network security. After research, the AMT community decided to go through the formalities of the VNS official mining pool. The rates are adjusted uniformly. The details of the adjustments are as follows:

1.The No. 1 mining pool handling rate was adjusted from the original 10% to 5%;
2.The No. 2 mining pool handling rate was adjusted from the original 10% to 5%;
3.The No. 3 mining pool handling rate was adjusted from the original 10% to 5%;
4.The No. 4 mining pool handling rate was adjusted from the original 10% to 5%;

The adjustment of the mine pool fee will be officially implemented from 20:00 on June 22, 2019. Afterwards, the AMT community will adjust the mine pool fee according to the VNS development and operation of the mine pool. The specific adjustment plan will be subject to the announcement at that time.


AMT community
June 22, 2019


Current mine pool list:

Official mining pool:
No. 1 mining pool official website: http://www.vnspool.org/#/miners
No. 2 mining pool official website: http://www.wawapool.com/#/miners
No. 3 mining pool official website: http://118.24.188.205/#/miners
Mine Pool No. 4: http://www.xiaomipool.com/#/miners

Third-party mining pool:
Mine pool: http://47.105.154.42:8089
VNS (OP)
Newbie
*
Offline Offline

Activity: 103
Merit: 0


View Profile
July 28, 2019, 07:13:00 AM
 #29

In order to provide better service to the VNSminer of the AMT community, the community mine pool is upgraded and changed as follows, please know:

Mine Pool Homepage: http://www.vnspool.org/#/miners
No. 1 mining pool mining IP: http://59.175.238.51:18888/

Mine Pool Homepage: http://www.wawapool.com/#/miners
No. 2 mining pool mining IP: http://118.25.228.226:8888/

No. 3 Mine Pool Homepage: http://47.92.5.207/#/miners
No. 3 mining pool mining IP: http://47.92.5.207:8888/

No. 4 Mine Pool Homepage: http://119.28.151.20/#/miners
No. 4 mining pool mining IP: http://129.28.240.129:8888/

Please switch your calculations to the above 4 mines as soon as possible! ! !

The following two mine pools will be closed on August 1st! ! !

http://Http://118.24.235.76:8888/
http://Http://118.24.188.205:8888/



AMT community
VNS (OP)
Newbie
*
Offline Offline

Activity: 103
Merit: 0


View Profile
August 12, 2019, 01:34:14 PM
 #30

VNS COIN mining software download link (including mining tutorial, Windows, A card, N card, solo and Ubuntu mining software)
Link: https://pan.baidu.com/s/1J81M_wS3jr0kypZPBfwfNQ
Extraction code: tij0
After copying this content, open the Baidu network disk mobile app, which is more convenient to operate.
VNS (OP)
Newbie
*
Offline Offline

Activity: 103
Merit: 0


View Profile
August 21, 2019, 07:48:55 AM
 #31

To celebrate the upcoming #Litecoin 8th Anniversary, our community is now hosting the competition which gives away $10,000 of Litecoin and bounty with @bituniverse_org in 18 exchanges:@binance @HuobiGlobal @OKEx @kucoincom @pionex_com 

Check out more details here: https://link.medium.com/xXn6DRY8jZ
VNS (OP)
Newbie
*
Offline Offline

Activity: 103
Merit: 0


View Profile
August 23, 2019, 03:45:43 AM
Last edit: August 25, 2019, 08:32:09 AM by VNS
 #32

Ecology:
1. VNS Coin launches the Coinbig exchange;
2. VNS Coin is listed on the coin bull exchange;
3. The Bitkan wallet has supported VNS coin;
4.CTB, ESS and other UP projects started;
5. AMT community co-bulider Jason went to Taiwan to participate in the blockchain seminar, visited local financial research institutes, universities and other research institutions and travel agencies and consulting companies to discuss realizing UP projects;
6. AMT community co-bulider Jason attended the Malaysia Summit to promote VNS and UP in Southeast Asia and Africa;
7. AMT community co-bulider Jason attended the Vietnam Industry Conference, visited local industry practitioners, and communicated VNS project development issues.

VNS main chain:
1. Main chain new architecture sub-module logic determination and detail filling;
2. VNS main chain difficulty algorithm adjustment and production reduction completed;
3. GPU mining program is completed;
4. Upgrading of the beehive and whitelist functions of the UP system;
5. The UP system is deeply customized and added.

VNS main chain related:
1. The design and production of the new official website has been completed 60%;
2. Start the VNS forum: www.vnstalk.org;
3. The white paper update is completed;
4. The VNS project introduction book is completed;
5. Introduction of the UP PPT was completed;
6. Design and development of a number of new UP project ecological schemes of varying sizes;
7. Allows Token to participate in the establishment of the UP bottom warehouse;
8. CTM wallet function iterative update and rebuild development of new version of wallet, current version interface optimization;
9. VNS browser development.
VNS (OP)
Newbie
*
Offline Offline

Activity: 103
Merit: 0


View Profile
October 18, 2019, 07:32:06 AM
 #33

New version of VNS official website:http://www.vnscoin.org/

Visit http://www.vnscoin.org/zone for the latest
1 VNS full node client
2 VNS pool client
3 VNS one key mining

And browser resources. Cheesy
VNS (OP)
Newbie
*
Offline Offline

Activity: 103
Merit: 0


View Profile
November 15, 2019, 11:52:43 AM
 #34

At present, the VNS ecology has entered a high-speed development track, and a variety of technical applications have emerged in the system. In order to further encourage the emergence of new application technologies, improve the VNS application ecosystem, and respond to the increasing application demands, we are adhering to the “pay-as-you-go” The community concept, hereby proposes this VNS technology developer incentive plan.
Any developer or team involved in the development of VNS ecological technology will have the opportunity to receive support from this incentive plan. The details are as follows:

First, the way to get
Develop high-quality applications based on the current or future needs of the VNS Ecology and submit them to Github for open source. After review and adoption by the team, the VNS rewards will be determined and issued by the incentive plan administrator based on the code quality.
The VNS team will release application development tasks from time to time according to development needs, and indicate requirements and rewards according to actual needs. If the development team receives the task and completes the development as required within the specified time, it will receive the corresponding VNS award.

Second, the incentive plan details
The total scale of this incentive plan is 200 million VNS, and the official effective date is November 14, 2019.
The plan will be managed by the VNS team. The team will determine the final reward based on various factors such as application development difficulty, cycle, and current VNS unit price.
The plan lasts for three years from the effective date, from November 14, 2019 to November 13, 2022, but does not rule out early termination due to force majeure, actual demand, market changes and so on.
The quarterly statistics will be used for all applications in the quarter, and the corresponding reward will be issued on the last Friday. The specific issue will be handled by a special person.
Communication mailbox: AMT_POWERS@163.com; AMT small secretary WeChat: AMT_Community

AMT community
http://vnstalk.org/topic/90/vns%E6%8A%80%E6%9C%AF%E5%BC%80%E5%8F%91%E8%80%85%E6%BF%80%E5%8A%B1%E8%AE%A1%E5%88%92%E5%8F%91%E8%B5%B7%E5%85%AC%E5%91%8A
VNS (OP)
Newbie
*
Offline Offline

Activity: 103
Merit: 0


View Profile
November 18, 2019, 11:49:03 AM
 #35

First, composition and function of the volunteer system
1. Trainee volunteers
(1) Participate in volunteer-related meetings to learn about important information about the AMT community.
(2) Suggestions and initiatives for community work.
(3) Supervise the operation of the community and expose the violation of the community concept.
(4) Participate in the discussion of community work issues in the corresponding community.

2, functional group members
The functional group is mainly composed of two parts, namely the technology development function group and the community development function group. The technical development function group members are mainly technical developers, and the community development function group members are mainly non-technical personnel. The specific contents are as follows:
(1) Technology development function group: In addition to the volunteer function of the trainee, it can participate in the discussion and implementation of the third-party technology ecological construction in the community, complete the technical development related tasks issued by the community, and obtain technical development task rewards. In addition, functional group members have nominations and voting rights for new members of this functional group.
(2) Community Development Function Group: In addition to the volunteer function of the trainee, you can participate in community development issues such as direction discussion and proposal implementation, AMT community online community management, and AMT community online and offline activities. In addition, functional group members have nominations and voting rights for new members of this functional group.

3, POWERS
(1) Participate in POW volunteer related meetings and participate in the development of core programs related to AMT community.
(2) Suggestions and initiatives for community work.
(3) Supervise the operation of the community and expose the violation of the community concept.
(4) Participate in the discussion of community work issues in the corresponding community.
(5) If there are different opinions on the resolutions and policies of the community, they can declare the reservations under the premise of resolute execution, and can submit their opinions to the community and the team.
(6) Have the promotion nomination right for trainee volunteers, functional group members and POW volunteers.
(7) Having the right to vote, to be elected, to vote, to be rewarded.
(Cool With the right to propose, you can propose a proposal to the community or team that is conducive to the development of the AMT community.

Second, the promotion system
1. Promotion of trainee volunteers: open management
(1) Any volunteer in the community has the right to invite
(2) The invitation must be explained when the invitation is made, and the group owner can agree to join.
(3) All acts that damage the image of the AMT community, including but not limited to advertising, false publicity, sales promotion, etc., are prohibited. Immediately after delisting, the inviting person is also de-listed.

2. Promotion of members of the functional group: implementation of closed management
(1) Promotion to a functional group member shall be nominated by the current functional group member, POWer or team, and voted by more than 60% of the functional group (51% system).
(2) The nominee must be from a trainee volunteer and must be a trainee volunteer for more than one week.
(3) Prohibit all acts that damage the image of the AMT community. Once found, the nominee will be punished with a minimum of one month's corresponding rights. If the nominee is a team, the team will determine the penalty.

3. Promotion of POWERS: closed management
(1) Promotion to POWer must be nominated by the current POWer or recommended by the functional group (80% of the members of the functional group, 66% of the support is recommended), and finally decided by more than 80% of POWer votes (66%).
(2) The nominee must be a member of the functional group and must be a member of the functional group for more than one month.
(3) All acts that damage the image of the AMT community are prohibited. Once found, the nominee will be punished with a minimum of three months' POW interest.
(4) Provisional POWERS The number of members is 20% of all volunteers.
(5) The POWERS members are from the functional group, and the final number of seats is determined according to the proportion of each functional group.

4, POWERS re-election mechanism
(1) The re-election cycle is re-elected once every quarter, and the last full week of each quarter is re-elected, and the results of the re-election are announced on the first Monday after the re-election.
(2) The re-election system adopts the elimination system, ranking the total number of votes for all individuals in the quarter, and the last 20% is to optimize the candidates, and the optimized candidates will return to the corresponding functional groups.
(3) After the optimization, the new POWERS promotion work is started, and the candidate is determined by the existing POWERS nomination or functional group recommendation, and the existing POWERS vote determines whether to promote.
(4) The optimized candidate regression function group can become a POWERS candidate again after one quarter.

Third, CP incentive system
CP (Community Pioneers) contributed the AMT Community Volunteer Medal as one of the indicators to measure the contribution of AMT volunteers. The initial exchange ratio with VNS is 1 to 500. The CP architecture is as follows:

1. CP acquisition method:
(1) Basic rewards: The CP is distributed monthly to volunteers who become POWs, one per person per month, and a monthly contribution vote. The top 30% of the volunteers receive an additional CP.
(2) Contribution rewards: Every month, POWERS organizes the contribution events into a table (including contribution events and major contributors, the current maximum number of events in the table is 20), and votes are divided into three gradients, ranking the top 10%, 20 %, 50%, the event participants get 3, 2, 1 CP respectively.

2, CP value role
(1) Honor Value: As a contributor's medal for the AMT community, CP represents the community's affirmation of contributors and is a symbol of honor.
(2) Value of interest: The initial price of CP is 500VNS, which is generated by the helper system. With the development of the community, the value of CP will continue to increase. CP value will be matched to community development to avoid contributing value depreciation.
(3) Community Dividend: The monthly community will generate a Bonus package based on the community development of the month and distribute it to the CP holder according to the current CP holding percentage.

3, CP's guest parameters
(1) The size of the bottom bin: 100,000 VNS;
(2) CW value: 0.8;
(3) Initial generation: 250 pieces (permanently locked, not included in dividend distribution);
(4) Whitelist setting: Only the designated account of the team can be bought, and anyone can sell it;
http://vnstalk.org/topic/95/amt-社区志愿者体系调整方案?from=groupmessage&isappinstalled=0
VNS (OP)
Newbie
*
Offline Offline

Activity: 103
Merit: 0


View Profile
February 24, 2020, 12:28:55 PM
 #36

Technology

1.VNs main chain continues to develop.
2.VNS has completed the remix ide contract develop tool and improved the development documentation.

Ecology

1.The small account of WE completed the first feedback.
2.VNS token has been mapped to coin on the exchange.

Community

1.VNS has launched the activity of "building in Spring Festival.
2.VNS has launched a photography contest.



AMT Community
VNS (OP)
Newbie
*
Offline Offline

Activity: 103
Merit: 0


View Profile
March 31, 2020, 03:03:29 AM
 #37

Technology
1.The main chain is undergoing upgrade development according to the plan.
2.Development test of mining pool service platform.

Ecology
1.CEX.plus has opened VNS deposit and withdrawal.
2.New version of cointome wallet has been opened for beta.
3.VNS launches UP tools and UP tutorials.

Community
1.Multiple project development teams overcome epidemic situation,open online office, implement annual development plan.
2.VNS has created a total group of AMT on telegram to establish a stable and smooth global instant community channel.

AMT Community
VNS (OP)
Newbie
*
Offline Offline

Activity: 103
Merit: 0


View Profile
April 21, 2020, 01:27:08 AM
 #38

1.Technology development
(1)The VNS main chain algorithm is optimized and finished.
(2)The VNS & XMC development documents and related tools are written and published to Github. The specific content is shown in the link: https://github.com/monero-classic; https://github.com/AMTcommunity/go-vnscoin/wiki .
(3)Maintenance and update of VNS one-key mining software; Stratum protocol added to the mining pool side; VNS mining pool algorithm update.
(4)The logic design of the mine platform is completed to realize the automatic selection of the optimal mining strategy.
(5)VNS & XMC block browser fluency and information integrity optimization.
(6)Cointome wallet adds a key to issue ordinary points; Cointome wallet background architecture optimization; Cointome transfer display interface optimization; Cointome wallet flashback BUG solution.

2.Community ecology
(1) The XMC telegram question and answer robot has been developed and loaded successfully, and the XMC main question answer has been added.
(2) XMC mobile wallet is completed using video tutorials and posted to YouTube and Twitter.
(3) Easyhash and Fairhash are added to the XMC cooperative mining pool.
(4) To meet the needs of global users, a number of intercontinental XMC nodes were newly built and opened for use.
(5) Complete community cooperation with IFTip, and carry out VNS knowledge question and answer activities in the IFTip community.
(6) Participate in the 7th Anniversary Celebration of Coin Watch to achieve interactive publicity.
(7) Bitkan’s VNS information display problem feedback and repair.
(Cool The VNS main chain completes technical docking and logs into Bitpie wallet.
(9) The basic framework of the SaaS tool of the technical ecological partner (commercial, product, marketing and other module function closed-loop completion) is completed and the internal test begins.


AMT Community
Pages: « 1 [2]  All
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.19 | SMF © 2006-2009, Simple Machines Valid XHTML 1.0! Valid CSS!