I think the "s17" might show Q2 if Bitmain really wants to make money. Hopefully they learned from their s11 release mistake.
It is an interesting set of problems for me.
We did this buildout.
we are certainly going to expand this location.
we are in talks for a much larger build in Warren County.
I do not want to fuck up and be too conservative.
but I do not want to fuck up and be too aggressive.
It looks to me that Clifton power will not exceed 238 volts and run in the 226 to 238 volts range.
So we can do all s15 or s17 here eventually.
The larger location may be all m10.
Tomorrow I am driving to Clifton,NJ with repair parts on the m10 I will see how this goes.