Finally up and running. 260 kwatts and 20 kwatts are delayed due to supply chain issues.
note 260 kwatts are about 48-50 kwatts 24/7/365 in grid tied set ups.
we will be installing this 30 inch vent this week.
..
missing a photo let me see if this fixed it.
Okay its good and I deleted my alts post.
Well long delays and just in time for eth to go pos and crash the markets.
we will do all s17 pros with this.
So we put in crash pipes yellow painted
Right now load is not set up for mining as I am cleaning all the asic gear.
we will take the
L3+
s9
Avalon a721 off line.
keep the 20 something s17's
some s15's
and we have a few
Avalon 1046 and 1066 to put on line.
and 1 whatsminer m10 still runs.
we are debating on whether to buy 10 s19xp's for 70k or so