Bitcoin Forum
May 25, 2024, 04:42:43 AM *
News: Latest Bitcoin Core release: 27.0 [Torrent]
 
   Home   Help Search Login Register More  
Pages: [1]
  Print  
Author Topic: Full-suite crypto mining facility in the north of Estonia  (Read 120 times)
byran1301 (OP)
Copper Member
Newbie
*
Offline Offline

Activity: 26
Merit: 1


View Profile
February 06, 2020, 12:58:32 PM
 #1




Full-suite crypto mining facility in the north of Estonia (40km from Russian border).

The facility is located on the territory of a power plant that allows access to electricity at competitive rates.

Electricity rate: tied to Nord Pool (average rate with all costs 0.06-0.07 EUR/kWh)

Equipped with stable and continuous internet access.

Currently, connected to 600kW of power with possibility to connect an additional 2mW.

Equipped with top-class ventilation equipment that can handle full load ASIC miners, even during hot summer months.

Additionally equipped with racks, shelves, internet cables and all necessary equipment to host and activate crypto mining equipment.

The right to the facility along with the fitted equipment can be sold with Antminer S9 miners included (negotiable).

Price  49000 USDT

For additional information and foto please  PM.

The original investment in facility was 120 000 euro


Pages: [1]
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.19 | SMF © 2006-2009, Simple Machines Valid XHTML 1.0! Valid CSS!