Bitcoin Forum
May 09, 2024, 03:21:32 AM *
News: Latest Bitcoin Core release: 27.0 [Torrent]
 
   Home   Help Search Login Register More  
Pages: [1]
  Print  
Author Topic: [WTS] 300kW air cooled mining facility  (Read 32 times)
elokk (OP)
Hero Member
*****
Offline Offline

Activity: 723
Merit: 519


View Profile
November 16, 2023, 02:06:41 PM
 #1

Located in Southeast Missouri

300kVa Transformer
1200 amp 3-phase 208v (strictly for miners)
(20) 60amp circuits
(5) 10,000 cfm exhuaust fans
(4) 60x60 air intake louvers with washable Merv4 & Merv 11 filters
(8 ) 30x30 air intake louvers with washable Merv6 & merv 11 filters

(20) 48 amp APC pdu's
will include enough ethernet and power cables to run 100 s19s (s19s not included)

Building also has a separate 400 amp single phase electric service which runs exhaust fans lighting, etc,  2 bathrooms, overhead led lighting water softener, drinking fountain, etc

SERIOUS INQUIRES ONLY, PLEASE DM

$275,000

t.me/bitcoinasic
Pages: [1]
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.19 | SMF © 2006-2009, Simple Machines Valid XHTML 1.0! Valid CSS!