Adding a second machine to Monero mining.
I7-3770k, delidded, overclocked to i think 4.8GHz, been long time since I fired her up.
Little Beast BuildPart:1Going to be a Monero cpu mining rig water cooled.
I placed everything to see what i need to do, did a little die grinding for 2 120mm fan ports that were honey combed. "hate honey combs"













Part:2I need 2 g1/4 3/8 5/8 compression fitting, 6 are on order, alphacool. I will use 2 ID 3/8 and small OD from ek set just for a few days, from T fitting and down to drain hose. The rest of the hose is PrimoChill LRT, once the fittings come I'll will replace the junk hose from ek, only be for a few days.
Also, I need to order 2 x black 120MM fan grills.
Progess. Looks good, but will look really sweet with the 2 120mm grills for the exhaust fan on inside and out, also protect the fan blades.














Part:3I have the WC system all ran. I soaked the new alphacool 120mm rad in blitz part 1 & distilled for 22 minutes, rinsed 4 times. Put the WC system together with board in set everything up, pulled board, running blitz part 2 and distilled water for 12 hours.
Looks good.








