 |
October 22, 2026, 01:48:33 PM |
|
Hi all. Sharing the setup of a farm that has run privately for about 5 years and is now opening up. Happy to answer technical questions.
Fleet and power - 1,980 × Antminer S19 Pro, about 6.44 MW of miners - Hashrate about 207–218 PH/s (live 7-day figure on the site) - About 8 MW site capacity, about 18 MWp solar on site, wind turbines on the wider area - Desert-like climate: cold air and strong sun, which helps both cooling and solar
What is changing - A new hall for AI GPU servers is built, with cooling in place. No GPUs run yet; the first GPUs are planned about two months after launch. - The S19 Pro fleet will be replaced gradually by newer models from about a year on.
Public part - People can join with USDT (TRC20 / BEP20). Plans start at $300, principal lock-up is 6 months. - Return figures on the site are illustrative ranges, not guaranteed. Capital is at risk.
Live network data (hashrate, difficulty, pool share) and the full risk disclosure are on farm-futures.com. We do not share the farm's location, for security.
Questions welcome — especially from people running solar-backed mining.
|