I was interested by the post, so i did some further crunching of the numbers... Just for fun
Just as a tought experiment:
100.000 Th equals 21141 Antminer S7's batch 9.
We all know the hashrate given by the producers is an estimate, and you'll need a couple hotspares just to make sure you'll be able to cope with HW failure.
So basically, you'll need 21200 Antminers.
Each antminer consumes 1300W. Your farm will consume 27.6 Mw (only the antminers, not including other equipment like cooling, networking, security, lighting,...). There seems to be a lot of nuclear powerplants that produce around 1000 Mw, so you'd basically use 1/4th of the power of a small nuclear powerplant...
Each antminer would weigh 4.5 Kg. Your farm would weigh over 96 Tons (95.4, ,not considering the PSU's, racks, cables, routers,...)
Each antminer would cost $950. Your farm would cost around 20 million (considering you didn't get a discount, but not including PSU, tax, cables, servers, routers, racks, cooling,...)
I'm pretty sure that you were joking, but if you were not... Think twice before you start... At the very least, hire somebody to crunch the numbers for you, so you will know what problems you'll run into