There is a contract with a power plant located in northern Europe for the purchase of electricity at 0.06 Euro per 1 kW.
At the moment 400 kW, in July another 800 kW. In the fourth quarter of 2018, another 10 MW will be available.
There is no room at the power plant, so the power plant permits the installation of 40-foot sea containers. In one container is placed 190 Asic.
This is how containers look
https://www.youtube.com/watch?v=Q8XW6a1x7DsCarrying out the cable to the containers costs 12 000 Euro, electricity connection costs 3500 Euro for every 100 kW.
For development of 400 kW need are 2 containers. The price of 2 containers will be 10 000 Euro.
Total estimates:
Carrying out cable - 12 000 Euro
Connectivity - 3500 x 4 (400 kW) = 14 000 Euro
2 containers = 10 000 Euro
Total: 36 000 Euro for a place under 285 Antmeiner S9
The price of electricity is 0.06 Euros
Rental of plase for 2 containers - 660 Euro per month
Under the terms of the contract with the power plant, after launching for 1 month, 70% of the allocated power capacity should be mastered.
I have experience in creating mining farms, automating all processes on the farm.
I will consider other proposals for the use of this electricity.