Will this setup work? Currently running 2 E9s off the sub panel on 20A breakers.
I am unsure about:
Main panel, is that enough amps or should I have a new main panel installed?
Main to sub breaker, 50A enough?
Wire gauge main to sub?
Sub panel, 2 30A breakers enough?
Wire gauge sub panel to PDUs?
https://i.imgur.com/lYvG0Pp.jpg