WindEnergyMining (OP)
Copper Member
Newbie
Offline
Activity: 110
Merit: 0
|
 |
March 02, 2018, 06:06:49 PM Last edit: July 06, 2018, 12:09:27 PM by WindEnergyMining |
|
[ANN] [ICO] Wind Energy Mining. Green Energy – Green Mining. Token sale start on March 20, 2018 PROJECT UPDATE PAGE 6 How often do we think what we and our children breath in? Do we think what electricity is made of when we turn on the kettle in the morning, or why it snows where it shouldn’t be any snow? Crypto currency mining consumes a huge amount of electricity, at production of which mainly fossil sources – gas, coal - are used. This particular issue has become one of the reasons for restrictions imposed on the mining of crypto-currency. The only way to solve this problem is to develop and increase the production of alternative energy Unfortunately, the green electricity producers often face reluctance of bureaucratic entities and political elites, closely related to oil and gas monopolies, to support such production. Moreover, producers face deliberate intention to impede their development. The possibilities of the producers are limited by the bodies regulating energy sector, new unreasonable requirements are introduced, and the production becomes impossible in principle. In such circumstances, the payback problem is thrown into sharp relief. The possibility to build new green power stations is doubtful, because the political and bureaucratic obstacles connected with oil and gas sector lobbying, limit the freedom of actions of the industry willing to develop green energy production. The Wind Energy Mining project aims to circumvent these obstacles. Our company has been dealing with wind electric energy production in Latvia for more than 10 yearsThe company owns 7 wind-driven electric power stations with total capacity of 4.5 MW. The geographical location of our wind power stations lets produce electricity throughout the year. We are going to use our electric energy for mining for cryptocurrencies and to allocate the proceeds from mining to the development of production and new power stations construction. ICO OBJECTIVE AND DETAILSICO objective is fundraising for the further development of wind energy production, through an Ethereum based token issue. WEM tokens are debt tokens WEM price – 0.001 ETH Accepted currency – Ethereum Buyback price – 0.0015 ETH Whitepaper https://etb.lv/pdf/Whitepaper_Wind_Energy_Mining_(en).pdfICO launch: March 20, 2018 Buyback start: in 9 months after the ICO and fund raising Buyback period: 2 years Detailed information on our token, possibilities of buying, and buyback you can find on our homepage www.etb.lv PROJECT DESCRIPTIONPurchase of mining equipment Increasing the capacity of the wind park and its supplement by solar power stations Use of renewable electric energy for cryptocurrency mining Cryptocurrency selling – return of investments and further development of the project ALLOCATION OF TOKENS 90% - ICO participants 5% - the team 5% - bonus program ALLOCATION OF ICO FUNDS28% - purchase of 1,000 ASIC Innosilicon A6 LTC or 2,000 Antminer L3+ and 1,000 Antminer S9 12% - purchase of GPU equipment (6,000 GPU Radeon VEGA 64) 15% - construction of solar power stations with total installed capacity of 2 MW 15% - project implementation costs (construction, electric installation) 30% - modernization and increasing the capacity of the wind park RELIABILITY OF INVESTMENTS* Existing wind park – guaranteed electric energy for mining * Long-term operational experience * Transparency of the project – all information is available on our website If the planned amount is not raised (or bigger amount is raised), the project costs will be reduced or increased proportionally according to the amount of raised funds. The project will be started within the available amount. PROJECT ROADMAP1Q 2018 – Preparation for the ICO, the ICO launch, fund raising Up to the end of 2018 - Procurement and installation of mining equipment, and wind generator park supplement by solar power stations 2019 - Mining. Token buyback 2020 - Mining. Token buyback. Renewable resource park modernization and capacity increasing Partners:www.belovitlab.ruwww.smartcontract.ruConnect us: We are on FacebookTelegramTwitterlinks on www.etb.lv
|
|
|
|
|
|
|
The grue lurks in the darkest places of the earth. Its favorite diet is adventurers, but its insatiable appetite is tempered by its fear of light. No grue has ever been seen by the light of day, and few have survived its fearsome jaws to tell the tale.
|
|
|
Advertised sites are not endorsed by the Bitcoin Forum. They may be unsafe, untrustworthy, or illegal in your jurisdiction.
|
|
|
|
gefander
|
 |
March 02, 2018, 06:09:32 PM |
|
So I can't see your team right now? At least tell me, is Your project based on a real relationship or is virtual Dating?
|
|
|
|
Ursuka
Member

Offline
Activity: 280
Merit: 10
|
 |
March 02, 2018, 06:11:44 PM |
|
Please tell us who the dev team is, it's a necessity
|
|
|
|
Anthomy
Member

Offline
Activity: 266
Merit: 10
|
 |
March 02, 2018, 06:13:17 PM |
|
As far as the information mentioned in this article is concerned, I am looking forward to updating the whitepaper, dev team, ...etc
|
|
|
|
WindEnergyMining (OP)
Copper Member
Newbie
Offline
Activity: 110
Merit: 0
|
 |
March 02, 2018, 07:08:08 PM |
|
As far as the information mentioned in this article is concerned, I am looking forward to updating the whitepaper, dev team, ...etc
You can find this information on our site www.etb.lv
|
|
|
|
WindEnergyMining (OP)
Copper Member
Newbie
Offline
Activity: 110
Merit: 0
|
 |
March 02, 2018, 08:57:48 PM |
|
So I can't see your team right now? At least tell me, is Your project based on a real relationship or is virtual Dating?
Quite real. As we mentioned, the members of the team are our company's employees and involved persons. Information about the company and description of the team are at www.etb.lv. Whitepaper contains both short description and photos of the team. You can also find us on Google Maps. Anyway, thank you for the reply, we'll fix this shortcoming and update the article. https://etb.lv/pdf/Whitepaper_Wind_Energy_Mining_(en).pdf
|
|
|
|
tippytoes
|
 |
March 02, 2018, 09:34:37 PM |
|
So I can't see your team right now? At least tell me, is Your project based on a real relationship or is virtual Dating?
Quite real. As we mentioned, the members of the team are our company's employees and involved persons. Information about the company and description of the team are at www.etb.lv. Whitepaper contains both short description and photos of the team. You can also find us on Google Maps. Anyway, thank you for the reply, we'll fix this shortcoming and update the article. https://etb.lv/pdf/Whitepaper_Wind_Energy_Mining_(en).pdf Maybe you can post the team members also on your website and not only in your whitepaper. So it's easy to check their profiles. People here are sometimes lazy to read whitepaper. And please add their profile links also. And from what I understood, you will build the mining farm in Latvia also, but do you have the legal permits already for that?
|
|
|
|
WindEnergyMining (OP)
Copper Member
Newbie
Offline
Activity: 110
Merit: 0
|
 |
March 02, 2018, 09:36:20 PM |
|
reserve Russian translation
By the moment, our website and Whitepaper are in 2 languages - English and Russian.
|
|
|
|
WindEnergyMining (OP)
Copper Member
Newbie
Offline
Activity: 110
Merit: 0
|
 |
March 05, 2018, 09:14:17 AM |
|
Maybe you can post the team members also on your website and not only in your whitepaper. So it's easy to check their profiles. People here are sometimes lazy to read whitepaper. And please add their profile links also. And from what I understood, you will build the mining farm in Latvia also, but do you have the legal permits already for that? [/quote]
Thank you very much, we are updating our website. All the needed information will be available ASAP.
|
|
|
|
WindEnergyMining (OP)
Copper Member
Newbie
Offline
Activity: 110
Merit: 0
|
 |
March 05, 2018, 10:20:07 AM |
|
Maybe you can post the team members also on your website and not only in your whitepaper. So it's easy to check their profiles. People here are sometimes lazy to read whitepaper. And please add their profile links also. And from what I understood, you will build the mining farm in Latvia also, but do you have the legal permits already for that?
Yes, we are planning to build the mining farm near our wind park; the land is also our property, we don’t need any legal permits.
|
|
|
|
Twinkledoe
Full Member
 
Offline
Activity: 1834
Merit: 138
★Bitvest.io★ Play Plinko or Invest!
|
 |
March 05, 2018, 10:26:19 AM |
|
Is the photo from your website yours?  If all the information is true and correct, why is it that it's not gaining attention from the community? Might need good promotional campaign here.
|
|
|
|
Hordyyy
Newbie
Offline
Activity: 83
Merit: 0
|
 |
March 05, 2018, 10:28:49 AM |
|
You have a pretty nice project idea, but i need to see an detailed info about your devgroup. It's not enough for now, is it? 
|
|
|
|
WindEnergyMining (OP)
Copper Member
Newbie
Offline
Activity: 110
Merit: 0
|
 |
March 05, 2018, 10:52:55 AM Last edit: March 05, 2018, 11:12:48 AM by WindEnergyMining |
|
Is the photo from your website yours?
If all the information is true and correct, why is it that it's not gaining attention from the community? Might need good promotional campaign here.
Yes, the photo is ours
|
|
|
|
WindEnergyMining (OP)
Copper Member
Newbie
Offline
Activity: 110
Merit: 0
|
 |
March 05, 2018, 02:13:40 PM |
|
If all the information is true and correct, why is it that it's not gaining attention from the community? Might need good promotional campaign here.
All the information is true and correct. Our company has been registered in The Register of Enterprises of the Republic of Latvia since 1994. The official information on the company you can find at Lursoft: https://company.lursoft.lv/en/etb/40003215866We are working at the beginning of our promotion campaign.
|
|
|
|
fridkeller
Newbie
Offline
Activity: 13
Merit: 0
|
 |
March 05, 2018, 02:24:37 PM |
|
I like your project because it's based on real things! I think I'll research it more and consider joining. I wish you good luck!
|
|
|
|
Javi_Anibarro
Sr. Member
  
Offline
Activity: 1526
Merit: 282
tBTC - https://dapp.tbtc.network/
|
 |
March 05, 2018, 02:30:22 PM |
|
if i remember it correctly,this kind of project had been created a few months ago before 2018. but until now we could not see anything from them or even they did not active anymore. can you tell me what is your relation with them ? because both of you use 'WIND' or based on 'WIND' to make the project. lastly, what make you so special other than 'Green' thing ? what is the differences between your project and other project? as we can see none of them can survive for a year or event they were only survived for a few months time.
|
|
|
|
WindEnergyMining (OP)
Copper Member
Newbie
Offline
Activity: 110
Merit: 0
|
 |
March 05, 2018, 04:19:03 PM Last edit: March 05, 2018, 04:36:14 PM by WindEnergyMining |
|
if i remember it correctly,this kind of project had been created a few months ago before 2018. but until now we could not see anything from them or even they did not active anymore. can you tell me what is your relation with them ? because both of you use 'WIND' or based on 'WIND' to make the project. lastly, what make you so special other than 'Green' thing ? what is the differences between your project and other project? as we can see none of them can survive for a year or event they were only survived for a few months time.
We do not have any relation to any other project. In the process of the development, we've done some research and have come to the conclusion that there are some projects that use the word "wind". Our main difference from other projects is that we've got our own production base presented by the wind park, and our own wind electricity ensures the viability of the project. Mining will let us sell the electricity at a higher price than when it is sold to a grid. When selling electricity to the grid, the price is 0.09 EUR per kWh, mining will let sell it at 0.62 EUR per kWh. Thus received funds, in turn, will go towards the development of the renewable energy park, which is our main goal.
|
|
|
|
mexcicojorz
Newbie
Offline
Activity: 33
Merit: 0
|
 |
March 05, 2018, 04:27:01 PM |
|
waiting the continuation of this project, I keep an eye on this thread
|
|
|
|
Zuhran
Member

Offline
Activity: 224
Merit: 10
“Create Your Decentralized Life”
|
 |
March 05, 2018, 05:11:42 PM |
|
who are your advisors? and when will there be more information about the project? when will the sales start?
|
|
|
|
WindEnergyMining (OP)
Copper Member
Newbie
Offline
Activity: 110
Merit: 0
|
 |
March 06, 2018, 08:08:21 AM |
|
You have a pretty nice project idea, but i need to see an detailed info about your devgroup. It's not enough for now, is it?  For the moment, this is really all our team. Each of us possesses many years of experience in the industry, and we are confident that we can implement the project. To carry out some tasks, for example, legal advice, we are going to involve subcontractors and advisors.
|
|
|
|
|