{Posting here, as there's increasing interest in LTC GBs and there is no equivalent LTC GB forum available}
You asked for a Litecoin Group Buy or mining contracts...so we responded with a Litecoin Group Buy!
These are Group Buys to own fractional ownership of DZ MC Ultra Power Rigs capable of 3.6 to 4 MH/s in Scrypt hashrate. Each sub-round in R20 will Feature four (4) ATI Radeon R9 R290x GPUs with 4 GB of GDDR5 per GPU.
These are the Lamborghinis of the Scrypt mining world.This LTC GB is meant for those looking to diversify from BTC Buy/Hold, and BTC GBs into Litecoin GBs. Litecoin is now widely seen as the "Silver" to Bitcoin's "Gold"-like standard, and has had massive appreciation in value recently.
The network difficulty growth is also much lower in Scrypt mining.12/11 Clarification:
**
We will be doing multipool, even multi-coin mining. I listed this as an LTC GB but we will definitely be mining some of the better known ALT coins when it makes sense, as we're big fans of triangular arbitrage. Payouts will be in LTC (please leave your LTC wallet address for payouts in order comments or send a follow up support ticket) **
======================================================================================================
To reserve shares automatically and for easiest spreadsheet export,
please visit the new DZ Miner's Coop website.
======================================================================================================
25 shares are available in each rig. Each share gives you 1/25th of the rig's hashrate (minus low cost professional hosting/management fees).
If this GB sells out, we simply open up another sub-round called R20B. We can repeat this as needed, as R20x doesn't face the same hardware shortages that are often found in the ASIC Bitcoin miner world, since GPUs and PCs are essentially commodities at this time, as opposed to the prototypes we all get sent (AKA as ASIC miners). Inventory is essentially Unlimited for R20x, so there's no worries about running out of GB shares.
** Each user is limited to only 6 shares per rig/sub-round (6 shares in R20A, 6 shares in R20B, etc., etc.) so that other people get a chance to own a part of the rig, and so that too much ownership/votes don't reside in any one person's hands. Purchases of 6 or more shares will be automatically split amongst multiple GPU rigs/sub-rounds. **===
Site Link: http://www.dzminercoop.com/?p=1197
1 share = $212 = 144-160 KH/s for 6 months (unless there's a push from owners to sell the equipment earlier) + access to ultra low cost miner hosting at $300 per rig per month (and a 0.5% Management Fee). We will sell the unit or decide to continue running it before the 6 month mark.
This share price includes assembly/testing/troubleshooting & access to monthly low fixed costs for business insured hosting/management fees in a professional ASIC/GPU Miner Colocation Facility built just for LTC/BTC miners in conjunction with Miner Hosting LLC run by bobsag3.
==
[Per the rest of our other forum GBs, any resales at the 5-7 month mark will have the proceeds split by proportion to one's ownership of that Round's rig minus a 1.5% co-op transaction fee for handling this sale]
Share price includes funds to purchase an entire DZ MC LTC Ultra Power Rig, the assembly and testing, and UPS with battery backup. Hashrate will be split in 25 portions or GB shares.
Comparison: with shipping, an R9 R270x video card alone, capable of 450KH/s costs $220-260, before you factor in the rest of the system (case/PSU/RAM/CPU/accessories/assembly/testing/power/cooling) needed to set up and run a power hungry and noisy Litecoin/Alt-coin rig for months at a time.
Hosting and Management fees: $300 per rig per month + a 0.5% management fee, which works out to $12-13 per month per share (~$6 per share per bi-monthly payout on the 7th and 22nd (we alternates payouts with BTC rigs, which are paid on the 1st and 15th)).
DZ MC Exclusives include multiple Server class UPS units and battery banks, multiple gas generators, dedicated extra Air Conditioning plus access to 5 world class IT experts!
Note: For those wondering - R9 R280x GPUs are in too short supply at this time for us to have confidence that we'll be able to get these models in the volume we need, at the time of ordering. If R280x supplies appear to have greater supplies in January/February, then we may consider revamping future R20x- based GBs.
==
Individual purchases will be batch processed a few times a week. Please don't be alarmed if your order shows as Processing for a few days. We're still only 2 guys batch processing orders at this time and we're not at the point that we can hire someone yet just for order processing. Mahalo!
Please open a support ticket if you have concerns that your order didn't go thru after 48-72 hours. Also, please check our FAQ to see if your question has already been answered before sending a support ticket or forum PM. Cheers.
P.S.: Pictures included are representative, and may not represent the actual hardware used due to supply constraints. We may actually go to open case aluminum cases if we can secure enough stock.
==
====
DZ Miners Cooperative Roles for this R20 GB: DZ - Co-op Founder / overall coordinator of the Co-Operative, background role for R20. Founder/CTO of a newly formed Cryptocurrency focused Intl. Corp. called Cypher Trust LLC. Overseeing payouts and Primary admin for Co-op miners, IT Network Engineer, DoD IT Contractor. Primary GBC for R20x. Questions about BTC payments and questions for R20 may be sent to me (please open a support ticket on our site).
thomas_s -
Primary GBC for Rounds 5-19. COO of our new company, Set up Online Auto Reservations for the co-op! Thank you!
Send thomas_s. Business Degree, works in Finance.
bobsag3: Vetted Co-op member. World's lowest hosting fees for vetted miner hosting at a professional colocation hosting facility in Missouri! Official Black Arrow US Reseller and US Distributor for Drillbit Systems. New Pres. of our Mining Operations arm of our LLC. Opening a 2nd and possibly a 3rd Miner Hosting Facility due to overwhelming demand!
-Redacted-: Veteran remote admin. DZ MC Co-op Leader. DoD IT Consultant.
jungle_dave: Vetted Co-op member and Former Electrical Engineer / Network Engineer. Backup Admin for co-op miners, software support.
======================================================================================================
...
And Introducing to the GB Forum: Auto Reservations!
Thank you to vetted GBC thomas_s who has worked hard to put up a site to automate reservations so that there's no confusion and no double orders! It'll also make auto-export to spreadsheets much, much simpler for GBs, going forward.
www.dzminercoop.com==
Please contact to me for questions and payments or to manually confirm your reservations, but please open a support ticket after 48-72 hours if you have questions about a particular R20 order.
If you have questions about Round 20 unit hosting please contact bobsag3.Since this is a 3.6 - 4 MH/s rig, at 25 shares per rig, that works out to 144-160 KH/s per share for R20x. Unit will be hosted at bobsag3 at the world's lowest hosting/management fees, for a limited time. This should be assembled and built by January 15 (estimated). Incremental and monitored Overclocking will be implemented as we'll be keeping things nice and chilly.
Your share price includes acquisition of an estimated 20 minutes of UPS/Battery Backup + Gas Generator backup, included in the discounted share price to keep BTC flowing during: short outages (blackouts), voltage sags (brownouts), and voltage spikes, as well as to provide power filtering. The special purpose Gas Generators our co-op buying power allows us are meant for providing power during longer outages.
Site Link:
http://www.dzminercoop.com/?p=1197===
If you have questions as to how this whole darn at-cost, Democratic Miners Cooperative that's also a mesh network works, please send me a PM or state your concerns publicly as there's nothing to hide in this co-op.
Only hurtful or trolling posts will be deleted as we welcome all valued opinions, insights, concerns, and improvement ideas to improve
our at-cost (or even below cost) cooperative of about
120 400+ members (so far).
=========================================================================================================================================
Image Credit:
Original Image _.====.._
,:._ ~-_
`\ ~- _
| _ __. `.
,/ / \ / ~ - _
..__..-..__...- /__/ /__ `_ ~~--..__...----... DZ's Miner Cooperative, Round 20x ..."The little Co-op that could"
...
An At-Cost/Low-Cost Democratic Miner Co-operative with the world's lowest fees for vetted miner hosting/management services:only $300 per month per miner rig for R20x!
~120 400 members: 1 Scientist, 7 admitted IT Pros, 3 Network Engineers, 3 Electrical Engineers, 2 Finance Employee, 6 GB Coordinators, multiple vetted host sites.*
*Note:
A listing above does not necessarily indicate that this person runs or contributes to the running of the co-operative, but many of the pros listed have made their services available to the co-operative. Also, there could be more than 7 IT Pros, but some geeks are meek. ========================================================================================================================================
This Co-operative is led by a John K. vetted Network Engineer based in Hawaii, DyslexicZombei or DZ, who gets to design prototype IT hardware and lab/field networks in support of cutting edge research projects, and has been in the line of work of T&E and R&D for nearly 10 years, with 50-60 Hawaii/US Aerospace/IT/R&D/Civ. Engineering Endorsements on LinkedIn. The other remote administrators are jungle_dave who is a former Electrical Engineer and Network Engineer and -Redacted- a UNIX guru and veteran miner. Our local/remote admin is bobsag3, who is also an IT veteran. There are 5 leaders in the DZ MC, with thomas_s and I doing the actual running of the Cooperative.
Mining Equipment will be operated by vetted IT pros or a vetted IT college student, with backup host sites available. Payouts are on the 1st and 15th of the month minus a $150 host fee and a 0.5% management fee, the lowest prices around.
Once sales begin, Refunds are available up until unit ships at 1.5% restock fee.
We vote on all buying, shipping, and resale decisions as well as vote on the month to attempt equipment resales after 5-7 months of operations.
Vetted GB Coordinators are encouraged to team up to increase buying power and close out Group Buys quicker. All suggestions are welcome to help improve
our Co-operative.
- Approx. total value of GBEC / GBC ASIC/LTC Hardware pre-order sales or pre-sales of shares on this forum by DZ MC since Aug. 15:
$550K (before BTC price adjustments)
- Approx. value of DZ ebay ASIC sales (including 10 ebay shares for 3 GBs, worth $1.4K) since Aug.1 :
$3.9K- Several new GBCs and Bitcoin Miner Hosts vetted for free, and several scams pointed out on two BTC related forums.
- Number of FundRaising Rounds completed: 19
- Number of HashFast miners: 2 Baby Jets with paid upgrades, 2 Sierras, 4TH/s+ Total
- Number of KnC miners: 6 Jupiters, 800-1200GH/s. 2 Neptunes, 6TH/s.
- Number of Bitmine miners: 2 Rig, 2 Rounds so far, 3.4 - 5 TH/s
- Number of Black Arrow miners: 80 boards, 3.3 - 4TH /s, 17+ Black Arrow x-3 Prosperos at 2TH/s each
- Total Ordered HashRate: 55.8 TH/s+ Total
- Online Auto reservation system tailored for Group Buys thanks to vetted GBC thomas_s!
-
Server grade UPS units, TWO DZ MC gas generators, and a DZ MC Air Conditioner just for our miners, which will allow us to provide a perfect home to explore Overclocking for DZ MC ASIC miner rigs.-
New! A sixth GB Coordinator has joined the co-op! He's a VP of his own small oil company in Texas and is helping us to cook up a couple of future projects. Welcome Aboard!
Last order paid: Rounds 17x, Black Arrow Bullet Run (R17x is still available)