Longhorn901 (OP)
Member
Offline
Activity: 84
Merit: 19
|
|
October 02, 2024, 03:42:46 PM |
|
Here we go again! This new project will dynamicaly adjust the miners dependant on power available from solar. The demonstration solar system when finished will have 50kw of solar panels, 40kw of inverters and 100kwh of battery storage. We will only mine during the day and morning/evening using some of the battery but battery will be used mostly to smooth solar power during cloud conditions. I plan to run 10 Antminer s19j mostly in low power mode at around 2200 watts each. The system is located in Texas. I have 10kw of solar and 11.4kw inverter already installed. Still working on the 24kwh battery . Another 40kw of panels are on site but I need to build out the mounts. 6 of the 10 Antminers in stock Next step after the battery is to start up one Miner and develop a Python control script for, Dynamic Miner Control Adjustable Power Settings: The Antminer S19j supports different operational modes that can adjust power consumption and hashrate. We will utilize these settings to match the miners' power usage with available solar energy. Response to Solar Output: Implement a system where miners ramp up or down based on real-time solar production and battery charge levels. This will ensure optimal use of available power without overloading the system. I have done profitability calcs on this minus the Solar equipment because most of it was already bought and paid for years ago but I'll get to that later. It seems what makes this feasible today is that you can buy S19 machines cheap. The reason for all this? If it works we plan to build out a total Off-Grid Mining Farm in West Texas.
|
|
|
|
FP91G
Legendary
Offline
Activity: 1820
Merit: 1124
|
|
October 02, 2024, 05:56:09 PM |
|
I realize that these asics are very cheap now, but the problem is that the profit is very low and it's dropping every day. Large companies are constantly buying modern asics, and your profit will fall every day. I am sure that with such equipment you will have problems with ROI. https://www.asicminervalue.com/miners/bitmain/antminer-s19j-90th
|
█████████████████████████ ████████▀▀████▀▀█▀▀██████ █████▀████▄▄▄▄██████▀████ ███▀███▄████████▄████▀███ ██▀███████████████████▀██ █████████████████████████ █████████████████████████ █████████████████████████ ██▄███████████████▀▀▄▄███ ███▄███▀████████▀███▄████ █████▄████▀▀▀▀████▄██████ ████████▄▄████▄▄█████████ █████████████████████████ | BitList | | █▀▀▀▀ █ █ █ █ █ █ █ █ █ █ █ █▄▄▄▄ | ▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀ . REAL-TIME DATA TRACKING CURATED BY THE COMMUNITY . ▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄ | ▀▀▀▀█ █ █ █ █ █ █ █ █ █ █ █ ▄▄▄▄█ | | List #kycfree Websites |
|
|
|
Longhorn901 (OP)
Member
Offline
Activity: 84
Merit: 19
|
|
October 02, 2024, 07:22:38 PM |
|
According to that S19j @ $300 will ROI in 75 days if mining 24/7 but since I'm only mining 1/3 of the day its more like 225 days. How long will an $4000 S21 take to ROI and how many S19 can I buy for $4000?
I'm looking at this from a totally different angle.
Also this is more of a, can it be done project, I'm not expecting to get rich but if it can make profit I know I'm on to something interesting.
|
|
|
|
nc50lc
Legendary
Online
Activity: 2590
Merit: 6332
Self-proclaimed Genius
|
|
October 03, 2024, 06:55:45 AM |
|
I'm looking at this from a totally different angle. Also this is more of a, can it be done project, I'm not expecting to get rich but if it can make profit I know I'm on to something interesting.
The reason for all this? If it works we plan to build out a total Off-Grid Mining Farm in West Texas.
Interesting.. but with discrepancy on the goals. Computing ROI with the mining equipment alone will surely return with positive result no matter how long it will be. ( use any of the famous mining calculators online like whattomine with 0$/kWh electricity cost) No one can predict the future so calculators can only calculate with the current profitability. However, regardless of your result, you still need to include the additional cost of your off-grid solar system to ROI since the end goal is to build an off-grid farm. Or is everything already paid just like the additional 40kW panels you have now?
|
|
|
|
FP91G
Legendary
Offline
Activity: 1820
Merit: 1124
|
|
October 03, 2024, 11:16:49 AM |
|
According to that S19j @ $300 will ROI in 75 days if mining 24/7 but since I'm only mining 1/3 of the day its more like 225 days. How long will an $4000 S21 take to ROI and how many S19 can I buy for $4000?
I'm looking at this from a totally different angle.
Also this is more of a, can it be done project, I'm not expecting to get rich but if it can make profit I know I'm on to something interesting.
I think you're counting the payback incorrectly. You only count the cost of asics, but do not count the cost of investment in solar panels and equipment. In 225 days you will have recouped your investment in the asics, but what value will those asics have in 225 days? As an option for gaining experience it's a good idea, but investing in such equipment is definitely not about business.
|
█████████████████████████ ████████▀▀████▀▀█▀▀██████ █████▀████▄▄▄▄██████▀████ ███▀███▄████████▄████▀███ ██▀███████████████████▀██ █████████████████████████ █████████████████████████ █████████████████████████ ██▄███████████████▀▀▄▄███ ███▄███▀████████▀███▄████ █████▄████▀▀▀▀████▄██████ ████████▄▄████▄▄█████████ █████████████████████████ | BitList | | █▀▀▀▀ █ █ █ █ █ █ █ █ █ █ █ █▄▄▄▄ | ▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀ . REAL-TIME DATA TRACKING CURATED BY THE COMMUNITY . ▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄ | ▀▀▀▀█ █ █ █ █ █ █ █ █ █ █ █ ▄▄▄▄█ | | List #kycfree Websites |
|
|
|
Longhorn901 (OP)
Member
Offline
Activity: 84
Merit: 19
|
|
October 03, 2024, 01:22:08 PM |
|
Let's compare ROI if electricity is of minimal concern, as it would be with a paid off solar power plant. We can go into ROI's starting from scratch of a new buildout later. I think the maths are good Comparing ROI of Older vs. Newer Equipment
Equipment Specifications
Antminer S19j+ Hash Rate: 95 TH/s Power Consumption: 3,250 W Price per Miner: $300
Antminer S21 Hash Rate: 200 TH/s Power Consumption: 3,500 W Price per Miner: $4,000
Proportion of Network Hash Rate
S19j+ Proportion: Proportion = (95 × 10¹² H/s) ÷ (663 × 10¹⁸ H/s) ≈ 1.432 × 10⁻⁷
S21 Proportion: Proportion = (200 × 10¹² H/s) ÷ (663 × 10¹⁸ H/s) ≈ 3.016 × 10⁻⁷
Expected BTC per Miner per Day For 24-Hour Operation:
S19j+: Expected BTC/day = 450.72 BTC × 1.432 × 10⁻⁷ ≈ 0.0000646 BTC/day
S21: Expected BTC/day = 450.72 BTC × 3.016 × 10⁻⁷ ≈ 0.000136 BTC/day
Adjusted for 8-Hour Operation:
S19j+: Adjusted BTC/day = 0.0000646 BTC/day × (8 ÷ 24) ≈ 0.0000215 BTC/day
S21: Adjusted BTC/day = 0.000136 BTC/day × (8 ÷ 24) ≈ 0.0000453 BTC/day
Daily Revenue per Miner
S19j+ Revenue: 0.0000215 BTC/day × $62,125.31 = $1.34 per day
S21 Revenue: 0.0000453 BTC/day × $62,125.31 = $2.82 per day
Payback Period
S19j+: Payback Period = $300 ÷ $1.34 ≈ 224 days
S21: Payback Period = $4,000 ÷ $2.82 ≈ 1,418 days
Annual Revenue and ROI
S19j+ Annual Revenue: $1.34/day × 365 days = $489 per year Annual ROI: ROI = (($489 - $300) ÷ $300) × 100% ≈ 63%
S21 Annual Revenue: $2.82/day × 365 days = $1,029 per year Annual ROI: Negative until after the payback period (~3.89 years)
Investment Comparison
Investing $4,000:
Option 1: 1 S21 Miner Total Hash Rate: 200 TH/s Daily Revenue: $2.82 Payback Period = $4,000 ÷ $2.82 ≈ 1,418 days
Option 2: 13 S19j+ Miners ($300 each) Total Hash Rate: 13 × 95 TH/s = 1,235 TH/s Proportion = (1,235 × 10¹² H/s) ÷ (663 × 10¹⁸ H/s) ≈ 1.862 × 10⁻⁶ Expected BTC/day = 450.72 BTC × 1.862 × 10⁻⁶ ≈ 0.000840 BTC/day Adjusted BTC/day = 0.000840 BTC/day × (8 ÷ 24) ≈ 0.000280 BTC/day Daily Revenue = 0.000280 BTC/day × $62,125.31 = $17.39 per day Payback Period = $4,000 ÷ $17.39 ≈ 230 days
Conclusion: Investing in multiple S19j+ miners yields higher hash rate and faster ROI compared to a single S21 miner.
|
|
|
|
Longhorn901 (OP)
Member
Offline
Activity: 84
Merit: 19
|
|
October 03, 2024, 01:34:37 PM |
|
How about taking a chance in the $160k bitcoin lottery and solo mine it? Chance per block: 1 in 515,279 Chance per day: 1 in 3,578 Time estimate: 10 years
|
|
|
|
Longhorn901 (OP)
Member
Offline
Activity: 84
Merit: 19
|
|
October 03, 2024, 02:43:20 PM |
|
I'm looking at this from a totally different angle. Also this is more of a, can it be done project, I'm not expecting to get rich but if it can make profit I know I'm on to something interesting.
The reason for all this? If it works we plan to build out a total Off-Grid Mining Farm in West Texas.
Interesting.. but with discrepancy on the goals. Computing ROI with the mining equipment alone will surely return with positive result no matter how long it will be. ( use any of the famous mining calculators online like whattomine with 0$/kWh electricity cost) No one can predict the future so calculators can only calculate with the current profitability. However, regardless of your result, you still need to include the additional cost of your off-grid solar system to ROI since the end goal is to build an off-grid farm. Or is everything already paid just like the additional 40kW panels you have now? Yes, mostly paid other than more inverters and mounts for the panels.
|
|
|
|
Z390
Sr. Member
Offline
Activity: 882
Merit: 334
Vave.com - Crypto Casino
|
|
October 03, 2024, 03:03:28 PM |
|
I would rather invest in the latest Asic miners instead, the s19 are already on the line of retirement, and now they are losing profitability faster, if you have multiple of them then you can add easily buy one latest Asic miner.
Less heat, more gains and also less noise.
Do not forget that if your ROI was to be made back in 2 years, running on solar panels alone will add an extra 2 years to ROI because once the sun is down you have to wait till the next day.
|
|
|
|
Longhorn901 (OP)
Member
Offline
Activity: 84
Merit: 19
|
|
October 03, 2024, 04:01:40 PM |
|
I would rather invest in the latest Asic miners instead, the s19 are already on the line of retirement, and now they are losing profitability faster, if you have multiple of them then you can add easily buy one latest Asic miner.
Less heat, more gains and also less noise.
Do not forget that if your ROI was to be made back in 2 years, running on solar panels alone will add an extra 2 years to ROI because once the sun is down you have to wait till the next day.
Thanks, the calculations already take into account only mining during the day.
|
|
|
|
JayDDee
|
|
October 03, 2024, 10:46:48 PM |
|
Aren't there better ways to invest the produced power like offsetting your own electricity usage or selling it to the grid? Mining would not be my first choice.
|
|
|
|
Longhorn901 (OP)
Member
Offline
Activity: 84
Merit: 19
|
|
October 04, 2024, 12:12:14 AM |
|
Aren't there better ways to invest the produced power like offsetting your own electricity usage or selling it to the grid? Mining would not be my first choice.
Not that I've been able to come up with. I already generate my own power for the house and the power co doesn't pay sh*t here.
|
|
|
|
JayDDee
|
|
October 04, 2024, 02:20:00 AM |
|
Completety self sufficient, that's impressive. In that case I'd suggest balancing the mining to allow the batteries to fully charge and mine 24/7. You would ROI faster and you would need less mining equipment to do it.
|
|
|
|
nc50lc
Legendary
Online
Activity: 2590
Merit: 6332
Self-proclaimed Genius
|
|
October 04, 2024, 04:18:28 AM |
|
-snip- However, regardless of your result, you still need to include the additional cost of your off-grid solar system to ROI since the end goal is to build an off-grid farm. Or is everything already paid just like the additional 40kW panels you have now?
Yes, mostly paid other than more inverters and mounts for the panels. Okay, I guess the 'Total Off-grid' plan is already laid out regardless of the result of this 50kW solar power experiment. How about taking a chance in the $160k bitcoin lottery and solo mine it? Time estimate: 10 years
0.00000194% chance per block isn't too bad. Time estimate isn't really a good basis since this " 10 years" could be the block in the next 10 minutes or the next 10 years. An extreme example is the miner of block 853742 who only had 3.1TH, reference: /index.php?topic=5237323.msg64356985#msg64356985But don't take that as an encouragement to solo, just saying that a very low chance has a chance. Annual ROI: Negative until after the payback period (~3.89 years)
At last, someone who doesn't think that " ROI" is the same as " Capital Return". ;D Also, take the gradual increase of total network hash rate in consideration and the next " halving" if it would take more than 4 years from now to ROI.
|
|
|
|
safar1980
Legendary
Offline
Activity: 1904
Merit: 1665
Payment Gateway Allows Recurring Payments
|
|
October 04, 2024, 08:20:47 AM |
|
Let's compare ROI if electricity is of minimal concern, as it would be with a paid off solar power plant. We can go into ROI's starting from scratch of a new buildout later. I think the maths are good Comparing ROI of Older vs. Newer Equipment
Equipment Specifications
Antminer S19j+ Hash Rate: 95 TH/s Power Consumption: 3,250 W Price per Miner: $300
Antminer S21 Hash Rate: 200 TH/s Power Consumption: 3,500 W Price per Miner: $4,000
Proportion of Network Hash Rate
S19j+ Proportion: Proportion = (95 × 10¹² H/s) ÷ (663 × 10¹⁸ H/s) ≈ 1.432 × 10⁻⁷
S21 Proportion: Proportion = (200 × 10¹² H/s) ÷ (663 × 10¹⁸ H/s) ≈ 3.016 × 10⁻⁷
Expected BTC per Miner per Day For 24-Hour Operation:
S19j+: Expected BTC/day = 450.72 BTC × 1.432 × 10⁻⁷ ≈ 0.0000646 BTC/day
S21: Expected BTC/day = 450.72 BTC × 3.016 × 10⁻⁷ ≈ 0.000136 BTC/day
Adjusted for 8-Hour Operation:
S19j+: Adjusted BTC/day = 0.0000646 BTC/day × (8 ÷ 24) ≈ 0.0000215 BTC/day
S21: Adjusted BTC/day = 0.000136 BTC/day × (8 ÷ 24) ≈ 0.0000453 BTC/day
Daily Revenue per Miner
S19j+ Revenue: 0.0000215 BTC/day × $62,125.31 = $1.34 per day
S21 Revenue: 0.0000453 BTC/day × $62,125.31 = $2.82 per day
Payback Period
S19j+: Payback Period = $300 ÷ $1.34 ≈ 224 days
S21: Payback Period = $4,000 ÷ $2.82 ≈ 1,418 days
Annual Revenue and ROI
S19j+ Annual Revenue: $1.34/day × 365 days = $489 per year Annual ROI: ROI = (($489 - $300) ÷ $300) × 100% ≈ 63%
S21 Annual Revenue: $2.82/day × 365 days = $1,029 per year Annual ROI: Negative until after the payback period (~3.89 years)
Investment Comparison
Investing $4,000:
Option 1: 1 S21 Miner Total Hash Rate: 200 TH/s Daily Revenue: $2.82 Payback Period = $4,000 ÷ $2.82 ≈ 1,418 days
Option 2: 13 S19j+ Miners ($300 each) Total Hash Rate: 13 × 95 TH/s = 1,235 TH/s Proportion = (1,235 × 10¹² H/s) ÷ (663 × 10¹⁸ H/s) ≈ 1.862 × 10⁻⁶ Expected BTC/day = 450.72 BTC × 1.862 × 10⁻⁶ ≈ 0.000840 BTC/day Adjusted BTC/day = 0.000840 BTC/day × (8 ÷ 24) ≈ 0.000280 BTC/day Daily Revenue = 0.000280 BTC/day × $62,125.31 = $17.39 per day Payback Period = $4,000 ÷ $17.39 ≈ 230 days
Conclusion: Investing in multiple S19j+ miners yields higher hash rate and faster ROI compared to a single S21 miner.
You need to compare Antminer S19j+ with other modern ASICs. Antminer S21 is already outdated. But if you have a choice of only 2 ASICs, then in your case Antminer S19j+ is more profitable, but the bad thing is that you can mine only one third of the day.
|
|
|
|
Longhorn901 (OP)
Member
Offline
Activity: 84
Merit: 19
|
|
October 04, 2024, 01:34:19 PM |
|
-snip- However, regardless of your result, you still need to include the additional cost of your off-grid solar system to ROI since the end goal is to build an off-grid farm. Or is everything already paid just like the additional 40kW panels you have now?
Yes, mostly paid other than more inverters and mounts for the panels. Okay, I guess the 'Total Off-grid' plan is already laid out regardless of the result of this 50kW solar power experiment. How about taking a chance in the $160k bitcoin lottery and solo mine it? Time estimate: 10 years
0.00000194% chance per block isn't too bad. Time estimate isn't really a good basis since this " 10 years" could be the block in the next 10 minutes or the next 10 years. An extreme example is the miner of block 853742 who only had 3.1TH, reference: /index.php?topic=5237323.msg64356985#msg64356985But don't take that as an encouragement to solo, just saying that a very low chance has a chance. Annual ROI: Negative until after the payback period (~3.89 years)
At last, someone who doesn't think that " ROI" is the same as " Capital Return". Also, take the gradual increase of total network hash rate in consideration and the next " halving" if it would take more than 4 years from now to ROI. Yes Sir, and how about the projected increase in price, I recalculated with a 3 X increase in 3 years using todays price, I'll spare all the math. Future Price = $61,000 × 3 = $183,000 Total Value of Mined Bitcoin After 3 Years Total Value = Total BTC Mined × Future Price Total Value = 0.200385 BTC × $183,000/BTC ≈ $36,670.46 ROI Net Profit Net Profit = Total Value - Initial Investment Net Profit = $36,670.46 - $3,000 = $33,670.46 ROI Percentage ROI (%) = (Net Profit ÷ Initial Investment) × 100% ROI = ($33,670.46 ÷ $3,000) × 100% ≈ 1,122%
|
|
|
|
Longhorn901 (OP)
Member
Offline
Activity: 84
Merit: 19
|
|
October 04, 2024, 01:37:11 PM |
|
Let's compare ROI if electricity is of minimal concern, as it would be with a paid off solar power plant. We can go into ROI's starting from scratch of a new buildout later. I think the maths are good Comparing ROI of Older vs. Newer Equipment
Equipment Specifications
Antminer S19j+ Hash Rate: 95 TH/s Power Consumption: 3,250 W Price per Miner: $300
Antminer S21 Hash Rate: 200 TH/s Power Consumption: 3,500 W Price per Miner: $4,000
Proportion of Network Hash Rate
S19j+ Proportion: Proportion = (95 × 10¹² H/s) ÷ (663 × 10¹⁸ H/s) ≈ 1.432 × 10⁻⁷
S21 Proportion: Proportion = (200 × 10¹² H/s) ÷ (663 × 10¹⁸ H/s) ≈ 3.016 × 10⁻⁷
Expected BTC per Miner per Day For 24-Hour Operation:
S19j+: Expected BTC/day = 450.72 BTC × 1.432 × 10⁻⁷ ≈ 0.0000646 BTC/day
S21: Expected BTC/day = 450.72 BTC × 3.016 × 10⁻⁷ ≈ 0.000136 BTC/day
Adjusted for 8-Hour Operation:
S19j+: Adjusted BTC/day = 0.0000646 BTC/day × (8 ÷ 24) ≈ 0.0000215 BTC/day
S21: Adjusted BTC/day = 0.000136 BTC/day × (8 ÷ 24) ≈ 0.0000453 BTC/day
Daily Revenue per Miner
S19j+ Revenue: 0.0000215 BTC/day × $62,125.31 = $1.34 per day
S21 Revenue: 0.0000453 BTC/day × $62,125.31 = $2.82 per day
Payback Period
S19j+: Payback Period = $300 ÷ $1.34 ≈ 224 days
S21: Payback Period = $4,000 ÷ $2.82 ≈ 1,418 days
Annual Revenue and ROI
S19j+ Annual Revenue: $1.34/day × 365 days = $489 per year Annual ROI: ROI = (($489 - $300) ÷ $300) × 100% ≈ 63%
S21 Annual Revenue: $2.82/day × 365 days = $1,029 per year Annual ROI: Negative until after the payback period (~3.89 years)
Investment Comparison
Investing $4,000:
Option 1: 1 S21 Miner Total Hash Rate: 200 TH/s Daily Revenue: $2.82 Payback Period = $4,000 ÷ $2.82 ≈ 1,418 days
Option 2: 13 S19j+ Miners ($300 each) Total Hash Rate: 13 × 95 TH/s = 1,235 TH/s Proportion = (1,235 × 10¹² H/s) ÷ (663 × 10¹⁸ H/s) ≈ 1.862 × 10⁻⁶ Expected BTC/day = 450.72 BTC × 1.862 × 10⁻⁶ ≈ 0.000840 BTC/day Adjusted BTC/day = 0.000840 BTC/day × (8 ÷ 24) ≈ 0.000280 BTC/day Daily Revenue = 0.000280 BTC/day × $62,125.31 = $17.39 per day Payback Period = $4,000 ÷ $17.39 ≈ 230 days
Conclusion: Investing in multiple S19j+ miners yields higher hash rate and faster ROI compared to a single S21 miner.
You need to compare Antminer S19j+ with other modern ASICs. Antminer S21 is already outdated. But if you have a choice of only 2 ASICs, then in your case Antminer S19j+ is more profitable, but the bad thing is that you can mine only one third of the day. True, I am on the slow boat.
|
|
|
|
Longhorn901 (OP)
Member
Offline
Activity: 84
Merit: 19
|
|
October 17, 2024, 01:51:30 PM |
|
So I have enough of the system built to start some test runs, that's what I did yesterday. I finished setting up and started the first run at 2pm. It ran until 8pm where the inverter shut down at the programed battery low voltage setpoint of 30%. Check it out, https://www.youtube.com/watch?v=YlrzSxn80-sWill do a full day run today. This is on a Solis S6 11.4 KW Inverter, 7kw of Solar Panels and 24 KW Nissan Leaf Battery.
|
|
|
|
Longhorn901 (OP)
Member
Offline
Activity: 84
Merit: 19
|
|
October 18, 2024, 01:29:55 AM |
|
Today I started mining at 10am and shut down at 7pm with 40% battery left. Most of the day was sunny but mid to late afternoon was cloudy. So this time of the year I can get about 9 hrs of mining with the current set-up. That makes about $2.25/day on an old S19i x 10pcs = $22.50/day What do you guys think?
|
|
|
|
FP91G
Legendary
Offline
Activity: 1820
Merit: 1124
|
|
October 21, 2024, 04:52:15 PM |
|
I see that you are having power issues after 2pm, and you have extra battery power running. What happens if the battery is not charged in the morning due to bad weather?
|
█████████████████████████ ████████▀▀████▀▀█▀▀██████ █████▀████▄▄▄▄██████▀████ ███▀███▄████████▄████▀███ ██▀███████████████████▀██ █████████████████████████ █████████████████████████ █████████████████████████ ██▄███████████████▀▀▄▄███ ███▄███▀████████▀███▄████ █████▄████▀▀▀▀████▄██████ ████████▄▄████▄▄█████████ █████████████████████████ | BitList | | █▀▀▀▀ █ █ █ █ █ █ █ █ █ █ █ █▄▄▄▄ | ▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀▀ . REAL-TIME DATA TRACKING CURATED BY THE COMMUNITY . ▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄▄ | ▀▀▀▀█ █ █ █ █ █ █ █ █ █ █ █ ▄▄▄▄█ | | List #kycfree Websites |
|
|
|
|