Finksy (OP)
Legendary
Offline
Activity: 1022
Merit: 1003
|
|
October 18, 2015, 05:09:20 AM |
|
I will be out of town until Wednesday, in a low/no reception area. I likely will not be able to reply to PM's until I return. Thanks
|
|
|
|
commanderbeatle2
Newbie
Offline
Activity: 2
Merit: 0
|
|
October 22, 2015, 12:40:42 AM |
|
How do I order the The "Get Me Going" Package?
|
|
|
|
Finksy (OP)
Legendary
Offline
Activity: 1022
Merit: 1003
|
|
October 22, 2015, 03:22:23 AM |
|
PM's are being replied to as we speak
|
|
|
|
hawkfish007
|
|
October 29, 2015, 03:41:37 PM |
|
Finsky,
Will you be getting S5+/S7 specific breakout boards J4bberwock is working on? If so, I would like to get one with all options.
|
|
|
|
Finksy (OP)
Legendary
Offline
Activity: 1022
Merit: 1003
|
|
October 29, 2015, 08:09:43 PM |
|
Finsky,
Will you be getting S5+/S7 specific breakout boards J4bberwock is working on? If so, I would like to get one with all options.
Yes, I will be producing the IBM 4K boards. Still waiting on components, and J4bberwock is finalizing his design for the PCB. I will be minimum 1 week behind his initial batch, but will have some produced as soon as I can as well for small orders in North America.
|
|
|
|
hawkfish007
|
|
October 29, 2015, 10:19:02 PM |
|
Finsky,
Will you be getting S5+/S7 specific breakout boards J4bberwock is working on? If so, I would like to get one with all options.
Yes, I will be producing the IBM 4K boards. Still waiting on components, and J4bberwock is finalizing his design for the PCB. I will be minimum 1 week behind his initial batch, but will have some produced as soon as I can as well for small orders in North America. Please put me down for your batch 1 list for 2 kits, would like all options under and over volt option, volt meter etc.
|
|
|
|
CrypR
Jr. Member
Offline
Activity: 35
Merit: 1
|
|
October 30, 2015, 07:20:03 PM |
|
Will you be selling the DPS2000BB PSUs along with the board and optional components?
|
|
|
|
Finksy (OP)
Legendary
Offline
Activity: 1022
Merit: 1003
|
|
October 31, 2015, 03:44:51 PM |
|
Yes, I will carry some stock of DPS-2000's here in Canada and will have US orders drop-shipped to save on shipping and tax/duty from the border. The supplier that was supposed to have the power connectors in stock (that were already paid for) just emailed me back stating that "in stock" just turned into "6-8 week lead time from manufacturer". I will be scrambling to get them in as soon as possible for these. J4bberwock offered to send me some, but he has enough orders to fill for himself so I'll see what I can find.
|
|
|
|
Finksy (OP)
Legendary
Offline
Activity: 1022
Merit: 1003
|
|
November 03, 2015, 01:45:28 PM |
|
IBM 2880W boards are shipping from stock, tracking within 48 hours, and typically 4-5 business days anywhere US/Canada!
Packages are suspended ATM waiting on C19 & 24" cables, though I have many of the 36" cables in stock.
|
|
|
|
|
Finksy (OP)
Legendary
Offline
Activity: 1022
Merit: 1003
|
|
November 09, 2015, 05:58:51 AM |
|
i am currently out of 24" PCIe cables. Will have more in stock in approx 1 week. If anyone wants a package with 36" cables substituted for the shorter ones, PM me and I will work you out a price difference and ship within 48 hours.
|
|
|
|
Daplayer001
Newbie
Offline
Activity: 18
Merit: 0
|
|
November 11, 2015, 09:34:55 PM |
|
Hello, The Power supply, If I am reading correctly is US 220 Volts. The C19 and C20 Cables don't look like the US 220 Outlet. I understand the end that goes to the Power supply, the outlet end. What am I missing? ? Thanks
|
|
|
|
Finksy (OP)
Legendary
Offline
Activity: 1022
Merit: 1003
|
|
November 12, 2015, 03:48:23 PM |
|
Hello, The Power supply, If I am reading correctly is US 220 Volts. The C19 and C20 Cables don't look like the US 220 Outlet. I understand the end that goes to the Power supply, the outlet end. What am I missing? ? Thanks Daplayer, The C19 end of the cable is required to feed AC voltage into the PSU via the breakout board. I supply C19-C20 cables with some of the packages because it is the most commonly available cable, and ideally you would power these PSU's through a PDU, which has C19 outlets and it is a plug & play affair (just like the "Pimp DaddY" package). What many people including myself will do for powering a single PSU is cut off the C20 end of the cable, and wire on a NEMA 6-20P and corresponding receptacle. These parts are commonly available at any hardware store, and are safely suited for the maximum draw of this PSU (I've tested upwards of 13.5A draw). As usual, you should consult a certified electrician for your isntallation.
|
|
|
|
Daplayer001
Newbie
Offline
Activity: 18
Merit: 0
|
|
November 13, 2015, 05:34:42 PM |
|
Exactly, That is what I was missing.
I totally get what you are saying...
Thanks For your Time.
DaPlayer.
|
|
|
|
Finksy (OP)
Legendary
Offline
Activity: 1022
Merit: 1003
|
|
November 13, 2015, 09:07:46 PM |
|
Daplayer, no problem! record364, te he enviado un PM.
|
|
|
|
generalt
Legendary
Offline
Activity: 1096
Merit: 1021
|
|
November 21, 2015, 02:51:54 AM |
|
Curious if you ever got the 4000w package and what the cost would be for the PSU, breakout board, side plate and fans would be if you have them. The noise of the 2880w are starting to get to me.
|
BTC: 1GENERALrtBAjEv2Ps5cmEW1FADnXh1bCZ
|
|
|
Finksy (OP)
Legendary
Offline
Activity: 1022
Merit: 1003
|
|
November 21, 2015, 03:02:01 AM |
|
PCB's are currently being manufactured, I expect to see them in about 10 days or so. Side plates are being protoyped right now with a forum member, we are just trying to figure out the best material for price, weight, and durability.
|
|
|
|
thesmokingman
|
|
November 22, 2015, 08:55:59 AM |
|
I'm interested in either x1 Bladecenter H 2880w breakout board, or the DPS-2000BB for the 4000w setup. I would like to purchase 10 cables initially to power an S7. I also sent a PM as well.
Thanks!
|
|
|
|
Finksy (OP)
Legendary
Offline
Activity: 1022
Merit: 1003
|
|
November 23, 2015, 04:53:55 AM |
|
PM replied. Everything currently in stock and shipping typically within 48 hours. No firm ETA on the IBM 4K boards, I expect to have them for sale within 2 weeks.
|
|
|
|
Finksy (OP)
Legendary
Offline
Activity: 1022
Merit: 1003
|
|
November 23, 2015, 10:08:23 PM |
|
I am potentially sitting on a large order of PSU's that will take up availability for the coming couple weeks or more. All orders that have been placed thus far are fine, but future orders could have a significant delay for PSU's.
|
|
|
|
|