Author Topic: Already delays in BFL shipment plans?  (Read 49494 times)
Starlightbreaker
Legendary
*
Offline Offline

Activity: 1764
Merit: 1006



View Profile
November 19, 2012, 09:42:41 PM
 #341

It's really pretty simple to figure this out IMO.

- BFL wanted to fly people to their plant in late october/early november to see their prototypes.
- Their prototype batch of chips didn't work, but they still wanted to show off pics, so they did.
- They ordered up a new batch of chips, this time enough to do a full production run, with fixes in place to correct the issues from the first prototype.
- They delayed the fly-people-to-their-plant thing until they get the new batch of fixed chips in.
- As they are on a second revision of the chip, in all likelihood, it won't have problems.  They will time it so that the two peeps flying in will be able to see a working product running on 2nd-revision chips.  They will also begin assembly that week, assembling enough units to ship out the first batch (maybe a hundred units or something?).

To me, all the evidence points to them fully expecting working prototypes to be in-hand at the end of October, but then something unexpected came up.  I believe that unexpected thing was a bad run of chips, and I believe that's why the only thing they are waiting on for assembly is the new batch of chips.
maybe it's hard to admit they fucked up somewhere down the production pipeline.

Bogart
Legendary
*
Offline Offline

Activity: 966
Merit: 1000


View Profile
November 19, 2012, 09:55:55 PM
 #342

It's really pretty simple to figure this out IMO.

- BFL wanted to fly people to their plant in late october/early november to see their prototypes.
- Their prototype batch of chips didn't work, but they still wanted to show off pics, so they did.
- They ordered up a new batch of chips, this time enough to do a full production run, with fixes in place to correct the issues from the first prototype.
- They delayed the fly-people-to-their-plant thing until they get the new batch of fixed chips in.
- As they are on a second revision of the chip, in all likelihood, it won't have problems.  They will time it so that the two peeps flying in will be able to see a working product running on 2nd-revision chips.  They will also begin assembly that week, assembling enough units to ship out the first batch (maybe a hundred units or something?).

To me, all the evidence points to them fully expecting working prototypes to be in-hand at the end of October, but then something unexpected came up.  I believe that unexpected thing was a bad run of chips, and I believe that's why the only thing they are waiting on for assembly is the new batch of chips.
maybe it's hard to admit they fucked up somewhere down the production pipeline.

http://www.admittingfailure.com/

I think it's been a few weeks now since they were talking up their "bullet run" of chips.  I guess even at Bullet Speed these things still take a while.

"All safe deposit boxes in banks or financial institutions have been sealed... and may only be opened in the presence of an agent of the I.R.S." - President F.D. Roosevelt, 1933
PuertoLibre
Legendary
*
Offline Offline

Activity: 1848
Merit: 1003


View Profile
November 19, 2012, 10:06:18 PM
 #343

@ Bogart

I am not totally sure, but their first mention of the bullet run may have been are far back as October 20ish. Then a [very] vague statement of "refraction" issues with their run. As well as a mention of some kind of error being acceptable and was factored into their release timeline.
creativex
Sr. Member
****
Offline Offline

Activity: 434
Merit: 250



View Profile
November 19, 2012, 10:23:19 PM
 #344

That sounds about right. I think Josh was still referring to "padding" regularly around that time.

MrTeal
Legendary
*
Offline Offline

Activity: 1274
Merit: 1004


View Profile
November 19, 2012, 10:30:51 PM
 #345

https://forums.butterflylabs.com/showthread.php/251-More-Jalapeno-Pictures-amp-Shipping-Update

On the 29th of Oct BFL said 25 days until they get the chips, so that would be this Friday.
creativex
Sr. Member
****
Offline Offline

Activity: 434
Merit: 250



View Profile
November 19, 2012, 11:15:36 PM
 #346

Did BFL offer some kind of a shipping estimate once chips are received? I don't recall seeing one, but I haven't been monitoring their releases as closely as I was prior to making a decision on who to order from.

MrTeal
Legendary
*
Offline Offline

Activity: 1274
Merit: 1004


View Profile
November 19, 2012, 11:17:43 PM
 #347

Did BFL offer some kind of a shipping estimate once chips are received? I don't recall seeing one, but I haven't been monitoring their releases as closely as I was prior to making a decision on who to order from.
Did you not read the post I linked?
creativex
Sr. Member
****
Offline Offline

Activity: 434
Merit: 250



View Profile
November 19, 2012, 11:30:23 PM
 #348

No I did not, because you summarized part of it for me. Smiley

...final assembly and shipping a few days after that.

I did read that around the time it was posted. I distinctly remember the 4th or 5th week of November comment. Thanks for hunting down the link, I'm just not paying the attention I once did to BFL's releases, partly because they're not credible and partly because I made other arrangements.

LiteBit
Legendary
*
Offline Offline

Activity: 1133
Merit: 1050


View Profile
November 20, 2012, 12:10:47 AM
 #349

http://www.timeanddate.com/countdown/to?iso=20121126T10&p0=405&fg1=ea0606&fg2=808080&msg=BFL+%7C+ASIC+-+FIRST+SHIPMENT
Less than a week!  mumbles under his breath "yeah right"
creativex
Sr. Member
****
Offline Offline

Activity: 434
Merit: 250



View Profile
November 20, 2012, 12:15:20 AM
 #350

Fat chance. It should say -19 days anyway since they sold the bulk of their orders based upon an October(2012:) product release schedule.

LiteBit
Legendary
*
Offline Offline

Activity: 1133
Merit: 1050


View Profile
November 20, 2012, 12:24:27 AM
 #351

Fat chance. It should say -19 days anyway since they sold the bulk of their orders based upon an October(2012:) product release schedule.

This will continue to the negative if the date comes and goes.  The countdown was set up from the date of the last known proclaimation from BFL as to the shipping of ASIC units.

Even this nugget from BFL_Josh "If there is work to be done on T-Day, we will be doing it. No turkey shall stand in the way of ASIC progress, this I promise you."
PuertoLibre
Legendary
*
Offline Offline

Activity: 1848
Merit: 1003


View Profile
November 20, 2012, 12:39:04 AM
 #352



Even this nugget from BFL_Josh "If there is work to be done on T-Day, we will be doing it. No turkey shall stand in the way of ASIC progress, this I promise you."

That is no longer true.

Jody has just mentioned the staff will stop working for two days surrounding T-Day.

Check out the Blogs.....

Oh, and the 1/3 plan is history in her latest blog post. Now it doesn't matter when you placed your order....but when you paid it.
LiteBit
Legendary
*
Offline Offline

Activity: 1133
Merit: 1050


View Profile
November 20, 2012, 12:42:16 AM
 #353

just read that. thx
fcmatt
Legendary
*
Offline Offline

Activity: 2072
Merit: 1001


View Profile
November 20, 2012, 12:45:02 AM
 #354



Even this nugget from BFL_Josh "If there is work to be done on T-Day, we will be doing it. No turkey shall stand in the way of ASIC progress, this I promise you."

That is no longer true.

Jody has just mentioned the staff will stop working for two days surrounding T-Day.

Check out the Blogs.....

Oh, and the 1/3 plan is history in her latest blog post. Now it doesn't matter when you placed your order....but when you paid it.

Is there any facts to go on in this discussion besides they seem to be making an asic product and have peoples money?
PuertoLibre
Legendary
*
Offline Offline

Activity: 1848
Merit: 1003


View Profile
November 20, 2012, 12:50:12 AM
 #355



Even this nugget from BFL_Josh "If there is work to be done on T-Day, we will be doing it. No turkey shall stand in the way of ASIC progress, this I promise you."

That is no longer true.

Jody has just mentioned the staff will stop working for two days surrounding T-Day.

Check out the Blogs.....

Oh, and the 1/3 plan is history in her latest blog post. Now it doesn't matter when you placed your order....but when you paid it.

Is there any facts to go on in this discussion besides they seem to be making an asic product and have peoples money?
One BFL representative has further stated that the pre-orders should finish shipping by the end of January [clause: if there are no "snags"]. But no start date is given. (It is assumed it will be the planned "5th week of November")

Further, an update from Jody stated that they are still "waiting" on parts.

https://forums.butterflylabs.com/entry.php/48-Batches-Really-We-Don-t-Have-Them
creativex
Sr. Member
****
Offline Offline

Activity: 434
Merit: 250



View Profile
November 20, 2012, 01:01:32 AM
 #356

How...confusing. There are no batches and then there's this gem.

BFL_Josh - 11-19-2012 07:57 PM
I think there was a communication breakdown earlier between CS and myself. There is a first shipment which is the 1/3 plan, which you could call the 1st batch. After that, it's a FIFO method. How many are in the first shipment (aka the 1st batch) we don't know yet.

Syke
Legendary
*
Offline Offline

Activity: 3878
Merit: 1193


View Profile
November 20, 2012, 01:08:23 AM
 #357

Quote
We don't have batches.

First batch was quoted to be 20,000 ASICs. Sounds like it's going to take quite a while to turn those all into products. Batch #1 is going to last for months.

Buy & Hold
creativex
Sr. Member
****
Offline Offline

Activity: 434
Merit: 250



View Profile
November 20, 2012, 01:10:39 AM
 #358

That's probably why there are no batches now. Otherwise some of BFL's jumbo batch 1 customers could receive products after batch 2 bASIC or Avalon customers receive their products.

Unacceptable
Legendary
*
Offline Offline

Activity: 2212
Merit: 1001



View Profile
November 20, 2012, 01:30:42 AM
 #359

Quote
We don't have batches.

First batch was quoted to be 20,000 ASICs. Sounds like it's going to take quite a while to turn those all into products. Batch #1 is going to last for months.

I think what your referring to is the ASIC CHIPS only,not the 1st batch of finished product being shipped.I could be wrong  Huh

"If you run into an asshole in the morning, you ran into an asshole. If you run into assholes all day long, you are the asshole."  -Raylan Givens
Got GOXXED ?? https://www.youtube.com/watch?v=9KiqRpPiJAU&feature=youtu.be
"An ASIC being late is perfectly normal, predictable, and legal..."Hashfast & BFL slogan Smiley
creativex
Sr. Member
****
Offline Offline

Activity: 434
Merit: 250



View Profile
November 20, 2012, 01:41:32 AM
 #360

I thought they were the same thing until a couple hours ago. Grin Anyway since presumably(hopefully) no BFL SC products will ship without at least one ASIC chip, I hardly see how the distinction is necessary. Like their convoluted 1/3 shipping policy it seems to be needlessly complex.

Pages: « 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 [18] 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 »
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.19 | SMF © 2006-2009, Simple Machines Valid XHTML 1.0! Valid CSS!