Bitcoin Forum
April 30, 2024, 02:15:03 PM *
News: Latest Bitcoin Core release: 27.0 [Torrent]
 
   Home   Help Search Login Register More  
Pages: « 1 ... 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 [55] 56 57 58 59 »
  Print  
Author Topic: 🔥 [ANN] 🔥 [ICO] 🚀 Miner One - Cutting-Edge Bitcoin Mining. 🔵 🔵 Crowdfunded.  (Read 29632 times)
gavrosh
Member
**
Offline Offline

Activity: 336
Merit: 10


View Profile
April 16, 2018, 10:55:07 AM
 #1081

Do they already know how much power is Miner-One center that they are opening soon going to use?
It’s going to depend on the ICO results. The number of mining equipment is going to depend on money they raise.

Do they know how much energy does 1 hardware piece require?
Well if we have a look at the best ASIC for today then it requires 1-1.5 kilowatts.
A lot. The most of the money is going to be spend on electricity bills…

There is one good thing about it. The mining center in Sweden is going to have energy benefits as one of the tech companies. I’ve also heard that company has a special agreement with power provider since they will use a lot of electricity.
1714486503
Hero Member
*
Offline Offline

Posts: 1714486503

View Profile Personal Message (Offline)

Ignore
1714486503
Reply with quote  #2

1714486503
Report to moderator
1714486503
Hero Member
*
Offline Offline

Posts: 1714486503

View Profile Personal Message (Offline)

Ignore
1714486503
Reply with quote  #2

1714486503
Report to moderator
1714486503
Hero Member
*
Offline Offline

Posts: 1714486503

View Profile Personal Message (Offline)

Ignore
1714486503
Reply with quote  #2

1714486503
Report to moderator
"The nature of Bitcoin is such that once version 0.1 was released, the core design was set in stone for the rest of its lifetime." -- Satoshi
Advertised sites are not endorsed by the Bitcoin Forum. They may be unsafe, untrustworthy, or illegal in your jurisdiction.
1714486503
Hero Member
*
Offline Offline

Posts: 1714486503

View Profile Personal Message (Offline)

Ignore
1714486503
Reply with quote  #2

1714486503
Report to moderator
1714486503
Hero Member
*
Offline Offline

Posts: 1714486503

View Profile Personal Message (Offline)

Ignore
1714486503
Reply with quote  #2

1714486503
Report to moderator
1714486503
Hero Member
*
Offline Offline

Posts: 1714486503

View Profile Personal Message (Offline)

Ignore
1714486503
Reply with quote  #2

1714486503
Report to moderator
MkrKing
Member
**
Offline Offline

Activity: 322
Merit: 12


View Profile
April 16, 2018, 11:00:45 AM
 #1082

Do they already know how much power is Miner-One center that they are opening soon going to use?
It’s going to depend on the ICO results. The number of mining equipment is going to depend on money they raise.

Do they know how much energy does 1 hardware piece require?
Well if we have a look at the best ASIC for today then it requires 1-1.5 kilowatts.
A lot. The most of the money is going to be spend on electricity bills…

There is one good thing about it. The mining center in Sweden is going to have energy benefits as one of the tech companies. I’ve also heard that company has a special agreement with power provider since they will use a lot of electricity.

I hope so. It will save them a lot of money. What discount are they offering?
gazman
Member
**
Offline Offline

Activity: 238
Merit: 10


View Profile
April 16, 2018, 04:47:03 PM
 #1083

Are you going to maintain and fix the hardware on your own in case something is wrong with it? Or you are planning to use external companies for it? How much do you think it is going to cost?
Veecker
Member
**
Offline Offline

Activity: 406
Merit: 10


View Profile
April 16, 2018, 06:45:04 PM
 #1084

Are you planning to have some extra mining equipment in case something is broken?
sinfazat22ron
Member
**
Offline Offline

Activity: 364
Merit: 10


View Profile
April 16, 2018, 07:18:31 PM
 #1085

How many tokens are still for sale?
bars_kz
Member
**
Offline Offline

Activity: 224
Merit: 10


View Profile
April 16, 2018, 08:51:04 PM
 #1086

What reserve system are you going to develop in order to lower expenses in case something is broken?
spottcoin
Full Member
***
Offline Offline

Activity: 406
Merit: 100



View Profile
April 16, 2018, 08:54:34 PM
 #1087

How many tokens are still for sale?
There are still 190 million MIO left.
woodcoin
Full Member
***
Offline Offline

Activity: 266
Merit: 100



View Profile
April 16, 2018, 11:03:02 PM
 #1088

Can investors get access to mining center monitoring in their account?
minerone.io
Newbie
*
Offline Offline

Activity: 112
Merit: 0


View Profile WWW
April 17, 2018, 04:53:37 AM
 #1089

Are you going to maintain and fix the hardware on your own in case something is wrong with it? Or you are planning to use external companies for it? How much do you think it is going to cost?
Miner One will have our own expert technicians on the job 24/7, making sure your investment yields maximum returns. We decided it is simpler to deduct basic maintenance costs along with electricity from total output. We do not expect them to exceed 4–5% of monthly output.
minerone.io
Newbie
*
Offline Offline

Activity: 112
Merit: 0


View Profile WWW
April 17, 2018, 04:56:13 AM
 #1090

Are you planning to have some extra mining equipment in case something is broken?
23% of net output will be reinvested into equipment upgrades on an ongoing basis.
minerone.io
Newbie
*
Offline Offline

Activity: 112
Merit: 0


View Profile WWW
April 17, 2018, 04:57:57 AM
 #1091

Can investors get access to mining center monitoring in their account?
A dashboard we are developing will show in real time the total number of miners operating, total BTC mined daily and other data.
holland35
Newbie
*
Offline Offline

Activity: 112
Merit: 0


View Profile
April 17, 2018, 08:49:30 AM
 #1092

I wanna the ICO to finish and the MinerOne guys to start construction the first mining center. I’ve already bought sone MIO tokens and I wanna start receiving dividends.
californybit
Full Member
***
Offline Offline

Activity: 392
Merit: 100



View Profile
April 17, 2018, 08:55:25 AM
 #1093

I wanna the ICO to finish and the MinerOne guys to start construction the first mining center. I’ve already bought sone MIO tokens and I wanna start receiving dividends.
Then you will have to wait. The ICO ends May 15, then various issues will be solved.. All in all, I think that they will launch the first mining center at the end of the year.
askon
Full Member
***
Offline Offline

Activity: 252
Merit: 100



View Profile
April 17, 2018, 09:00:28 AM
 #1094

I wanna the ICO to finish and the MinerOne guys to start construction the first mining center. I’ve already bought sone MIO tokens and I wanna start receiving dividends.
Then you will have to wait. The ICO ends May 15, then various issues will be solved.. All in all, I think that they will launch the first mining center at the end of the year.
Wow, such calculations. Don’t listen to him, the team has already started constructing its own mining center. I think they’ve already bought first  batch of equipment. The first mining center will be launched during the following 3-4 months.
holland35
Newbie
*
Offline Offline

Activity: 112
Merit: 0


View Profile
April 17, 2018, 09:04:17 AM
 #1095

I wanna the ICO to finish and the MinerOne guys to start construction the first mining center. I’ve already bought sone MIO tokens and I wanna start receiving dividends.
Then you will have to wait. The ICO ends May 15, then various issues will be solved.. All in all, I think that they will launch the first mining center at the end of the year.
Wow, such calculations. Don’t listen to him, the team has already started constructing its own mining center. I think they’ve already bought first  batch of equipment. The first mining center will be launched during the following 3-4 months.
How could they already buy the first batch of equipment if the ICO isnt over yet?
askon
Full Member
***
Offline Offline

Activity: 252
Merit: 100



View Profile
April 17, 2018, 09:08:20 AM
 #1096

I wanna the ICO to finish and the MinerOne guys to start construction the first mining center. I’ve already bought sone MIO tokens and I wanna start receiving dividends.
Then you will have to wait. The ICO ends May 15, then various issues will be solved.. All in all, I think that they will launch the first mining center at the end of the year.
Wow, such calculations. Don’t listen to him, the team has already started constructing its own mining center. I think they’ve already bought first  batch of equipment. The first mining center will be launched during the following 3-4 months.
How could they already buy the first batch of equipment if the ICO isnt over yet?
Well, they’ve bought it, that’s all. They’ve collected the soft cap, so the ICO will be successful anyway. That’s why they’ve already started to work on construction. Btw, it’s specified in the technical documentation of Miner One. 
lok5874
Member
**
Offline Offline

Activity: 196
Merit: 10


View Profile
April 17, 2018, 09:12:54 AM
 #1097

I wanna the ICO to finish and the MinerOne guys to start construction the first mining center. I’ve already bought sone MIO tokens and I wanna start receiving dividends.
Then you will have to wait. The ICO ends May 15, then various issues will be solved.. All in all, I think that they will launch the first mining center at the end of the year.
Wow, such calculations. Don’t listen to him, the team has already started constructing its own mining center. I think they’ve already bought first  batch of equipment. The first mining center will be launched during the following 3-4 months.
How could they already buy the first batch of equipment if the ICO isnt over yet?
Well, they’ve bought it, that’s all. They’ve collected the soft cap, so the ICO will be successful anyway. That’s why they’ve already started to work on construction. Btw, it’s specified in the technical documentation of Miner One. 
What mining equipment did they choose?
Mat24
Member
**
Offline Offline

Activity: 238
Merit: 10


View Profile
April 17, 2018, 10:59:12 AM
 #1098

Is Soft cap already collected or not?
reallyhawk
Member
**
Offline Offline

Activity: 224
Merit: 10


View Profile
April 17, 2018, 11:11:59 AM
 #1099

Is Soft cap already collected or not?
Soft cap is already collected, the project is on its way to hard cap.
bars_kz
Member
**
Offline Offline

Activity: 224
Merit: 10


View Profile
April 17, 2018, 04:44:13 PM
 #1100

Have you already started developing MinerOne B-Wallet or will you start doing it after the end of Crowdsale?
Pages: « 1 ... 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 [55] 56 57 58 59 »
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.19 | SMF © 2006-2009, Simple Machines Valid XHTML 1.0! Valid CSS!