Bitcoin Forum
May 08, 2024, 05:30:00 PM *
News: Latest Bitcoin Core release: 27.0 [Torrent]
 
   Home   Help Search Login Register More  
Pages: [1] 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 »  All
  Print  
Author Topic: 💡[ANN] Gigajoule - Floating Solutions💡  (Read 2790 times)
Gigajoule (OP)
Copper Member
Newbie
*
Offline Offline

Activity: 69
Merit: 0


View Profile
September 08, 2019, 07:37:21 PM
Last edit: September 18, 2019, 12:57:23 PM by Gigajoule
 #1



12345678910111213141516171819202122232425262728293031323334
ELECTRICITY IS A
CORNERSTONE TO ANY
COUNTRY’S GROWTH
AND POTENTIAL

12345

12345678910111213141516171819202122232425262728293031
An estimated 2 billion people worldwide do not have
access to electrical power, and this figure is increasing.

In countries like Nigeria, despite the abundance of
natural gas as feedstock, less than half of the population
has access to stable electricity supply.

Even where electrical transmission systems do exist, many
developing countries rely on costly and inefficient
substitute power generation systems.

These have negative impact both on the environment and
on sovereign finances and budgets as governments often
need to apply subsidies to make them affordable.



THE GIGAJOULE SOLUTION

123456789101112131415161718192021222324
Floating Power Plants (FPPs)
  • Natural gas-based power generation
  • Gas turbines mounted on barges
  • Can be deployed wherever there is access
    to the sea
  • Positioned in lagoons, rivers or harbours
  • Coupled to natural gas supply and the
    national transmission system
123456789101112131415161718192021222324
Natural Gas as Feedstock
  • Cleanest of all carbon-based energy
    sources
  • Gas associated with oil production
    (as in Nigeria) or LNG (Liquid Natural Gas)
123456789101112131415161718192021222324
Siemens SGT-A65 Gas Turbines
  • State-of-the-art turbine technology
  • Aeroderivative engines
  • Modularized with generators and mounted
    in pairs on barges


123456789101112131415161718192021222324


AIRCRAFT-ENGINE POWER
GENERATION


Gigajoule uses the Siemens Trent turbine
as its primary power unit. At its core is
the same Rolls-Royce engine that is found
on the Boeing 777 and Airbus A380 aircraft,
providing enhanced reliability for long-range
flights and maximum passenger capacity.

The Siemens Trent gas turbine is assembled
in a modularised package with a Brush
generator, to form the SGT-A65 generator set.

The use of Rolls-Royce engines for electrical
power plants represents successful technology
transfer and benefits from more than 30
years of development and billions
of dollars of research.

The SGT-A65 also benefits from a long
operating life of 50,000 hours (approx. 6 years).
Turbines can then be switched out for a
replacement in under 72 hours. The cost of this
“as new” recurring operational capacity is
incorporated in O&M costs.

The Siemens technology package includes
comprehensive O&M and performance
guarantees, resulting in maximum
reliability and efficiency.
123456789101112131415161718192021222324


FLOATING POWER PLANT


An FPP has unique economic, social and
environmental features that make it an
optimal source of electric energy.

Floating power plants that use SGT-A65
engines have several important advantages:

Location flexibility

  • Two SGT-A65s are mounted on a floating
    barge, thus creating a complete movable
    power plant
  • Significantly less footprint is required
    than for land-based power plants. This
    provides many options of where to site
    the FPP units, as close as possible to gas
    supply and the local electrical evacuation
    infrastructure.
  • Ownership of the FPP units is always
    retained. These assets can therefore be
    deployed to other sites if necessary.

Speed of manufacture, installation
and commissioning


  • Quicker and easier than land-based
    counterparts
  • Gigajoule’s floating power plants will
    be assembled in the Appledore Shipyard
    UK with its covered dry dock allowing
    for manufacture throughout the year
  • Once the floating power plant arrives
    at the place of deployment by heavy lift
    vessel, connection to gas supply and
    the electrical grid is done in a
    relatively short time

Simultaneous establishment of the
land-based infrastructure for
the FPP units

  • Dry dock, gas pipelines, substations
    and transmission lines


Economies of scale
  • FPP units are deployed in groups of
    four per site though this can be increased
    or decreased as requirements dictate
  • In a typical deployment configuration,
    eight modularised SGT-A65 generator sets
    in operation means that maximum
    operating availability can be maintained
    at all times for the typical twenty-year
    operational term.
123456789101112131415161718192021222324


SIEMENS SGT-A65 SYSTEM


The Siemens Trent gas turbine is assembled
in a modularised package with a Brush
generator, to form the SGT-A65 generator
set, complete with intake duct and
exhaust stack. The system is fully automated.
Each SGT-A65 has a generating
capacity of 66 MW.

Siemens Operating, Maintenance and
Performance warranties ensure a twenty-year
average of operational ability of
not less than 95%.

The SGT-A65 is an aeroderivative gas-powered
turbine. Its start-up time is very fast, at less
than 10 minutes, and it can tolerate frequent
stops and starts. This stop-and-go capability
is particularly effective in balancing out
energy load fluctuations.

The SGT-A65 can provide base-load power both
to electrical grids and to industrial applications.



APPLICATIONS


Immediate
Gigajoule is ready to implement three projects of 528MW each at various sites in Southern Nigeria, in close proximity to gas supply
and electricity evacuation infrastructure.

  • Significant work has been completed at each of these sites to secure power generation licenses, confirmation of gas supply
    and electricity evacuation transmission studies.
  • Additional work includes preliminary environmental approvals, floating plant and infrastructure design work, economic viability
    confirmation and the necessary precursor negotiations to secure the Power Purchase Agreement with the Federal Government.

Project funding is achieved by utilizing the following credit enhancements:

  • World Bank Partial Risk Guarantee
  • Siemens full Operating, Maintenance and Performance Warranty
  • Lloyds of London Insurance

This amounts to over 1500MW installed capacity at a project cost of US$1.4bn (net) which is externally financed.

910111213141516171819202122232425262728293031323334
Future

  • In Nigeria alone there is immediate demand for
    another 10 000MW
  • In the rest of Africa, immediate demand is 20 000MW
  • Globally, excluding Africa, demand is estimated at
    another 30 000MW
123456789101112131415161718192021222324252627282930
Potential

  • Desalination plants for fresh water supply
  • Mini-refineries to produce diesel and petroleum products
    from traditionally uneconomic oil fields






12345678910111213141516171819202122232425262728293031323334
THE GIGAJOULE TOKEN

An initial exchange offering (IEO) will be conducted to finance
the implementation of the Gigajoule project. A digital token
named the Gigajoule (GIGJ) will be issued.

In contrast with most ICOs and IEOs, the GIGJ token will not
be a simple utility token, exchangeable for goods or services
to be produced in the future.
Rather, the GIGJ token is structured as a security: token
holders will benefit from the success of the project.

GIGJ token holders will be entitled to receive an annual
dividend of 15% of the profits generated by the Gigajoule
project, in proportion to their number of tokens.
12345678910111213141516171819202122232425262728293031323334

IEO SPECIFICATIONS






IEO SCHEDULE

The initial coin offering shall be divided into two general stages: a private pre-sale and an IEO public sale. Discount incentives shall be
applicable  according to the following table





12345678910111213141516171819202122232425262728293031323334

12345678910111213141516171819202122232425262728293031323334








EXECUTIVE TEAM


12345678910111213141516171819


GARDNER, DAVID
Founder & Senior Engineer
12345678910111213141516171819


POTTER, CHRIS
Founder & Maritime Engineer
12345678910111213141516171819


SCHWARTZ, RUSSEL
Founder & Chief Executive Officer
12345678910111213141516171819


SCHWARTZ, WARREN
Founder & Software Engineer


Frequently Asked Questions

WHAT IS A GIGAJOULE TOKEN?
The Gigajoule token (symbol: GIGJ) is the digital token that shall be issued in the IEO, using the Ethereum standard ERC, for the conduction
of the fundraising. GIGJ tokens shall be available for purchase throughout the IEO and will be delivered to investors’
wallets after the completion of the IEO.

ARE GIGJ UTILITY TOKENS OR SECURITY TOKENS?
GIGJ tokens will be security tokens, not utility tokens. Utility tokens, the most common method in ICO/IEO fundraising, give token holders
the right to exchange them for goods and services to be produced by the project which is financed through the ICO/IEO. Token holders do
not participate in any way in the profits of the project. In contrast, security tokens provide investors with profit earning rights,
among other potential rights.

WHAT RIGHTS DO GIGJ TOKEN HOLDERS HAVE?
GIGJ token holders shall have a right to earn 15% of the annual profits generated by all Gigajoule projects, according to the percentage of
tokens they hold. For instance, if in year 2025 a total of $20,000,000 in net profits is generated, a token holder who owns 5% of the GIGJs
in circulation, will earn the sum of $150,000 in annual profits ($20M x 15% x 5%).

WHICH CRYPTOCURRENCIES CAN I USE TO PURCHASE GIGJ TOKENS?
GIGJ tokens can be purchased during the IEO with BTC and ETH cryptocurrencies. Purchase of GIGJ tokens after the IEO will depend on the
specifications of the digital exchanges where GIGJ shall be listed.

WHAT WILL HAPPEN TO UNSOLD GIGJ TOKENS?
GIGJ tokens that are not sold during the IEO shall be burnt. “Burning” a token means sending it to an ETH address where the token can not
be traded further.

WILL GIGJ TOKENS BE LISTED IN DIGITAL EXCHANGES?
Yes, GIGJ tokens will be listed at exchanges. Now we are at an advanced stage of negotiations with a top 10 exchange by daily volume
and will announce it soon.

123456789101112131415161718192021222324

123456789101112131415161718192021222324


123456789101112131415161718192021222324


JOIN OUR COMMUNITY!
https://t.me/gigjtoken
1715189400
Hero Member
*
Offline Offline

Posts: 1715189400

View Profile Personal Message (Offline)

Ignore
1715189400
Reply with quote  #2

1715189400
Report to moderator
1715189400
Hero Member
*
Offline Offline

Posts: 1715189400

View Profile Personal Message (Offline)

Ignore
1715189400
Reply with quote  #2

1715189400
Report to moderator
Even in the event that an attacker gains more than 50% of the network's computational power, only transactions sent by the attacker could be reversed or double-spent. The network would not be destroyed.
Advertised sites are not endorsed by the Bitcoin Forum. They may be unsafe, untrustworthy, or illegal in your jurisdiction.
1715189400
Hero Member
*
Offline Offline

Posts: 1715189400

View Profile Personal Message (Offline)

Ignore
1715189400
Reply with quote  #2

1715189400
Report to moderator
Gigajoule (OP)
Copper Member
Newbie
*
Offline Offline

Activity: 69
Merit: 0


View Profile
September 09, 2019, 07:23:11 AM
 #2

Gigajoule Floating Solutions - who are we?

Gigajoule is an electricity energy solution that is premised on the Floating Power Plant. We are making electricity more accessible for those regions that are currently experiencing problems with access to electricity! By combining state-of-the-art technologies from other developed industries, we make possible the supply of electrical energy to millions of people who have no access to power now.

We use proven technologies together with Internet of Things (IoT) and blockchain technologies to ensure the highest standards of quality and efficiency.  This takes a fraction of the time required for traditional land-based plants, yet rivals or surpasses them in efficiency, reliability and cost.

If you want to learn more about our technologies and our company, please, visit our site https://gigajoule.io/

Gigajoule (OP)
Copper Member
Newbie
*
Offline Offline

Activity: 69
Merit: 0


View Profile
September 11, 2019, 10:27:29 AM
 #3

⚡️The global need for electricity. Solution to the problem!

Electricity is critical for the development of the growing populations of the world. However, around 1-2 billion of people do not have access to electicity at the present time and their number is increasing.
In Africa in particular, power shortages are commonplace, which in turn stifles economic and social development.

According to a USAID Study in 2017, two out of three people in sub-Saharan Africa lack access to electricity. More specifically, in Nigeria (Africa’s largest economy with a population of 186 million people), there is only an access rate of 45%.

What does that say? About the imperfection of the energy sector, making it difficult for a huge number of people around the world to get electricity in order to simply charge the phone, boil the kettle or get heat.

Realizing the importance of the rapid development of technology, we want everyone in even the smallest city in the world to have access to electricity when it is needed.

Gigajoule Floating Solutions is an electricity generation company. It creates fully operational, gas-based power plants, floating on barges. It uses proven technologies together with Internet of Things (IoT) and blockchain technologies to ensure the highest standards of quality and efficiency. This takes a fraction of the time required for traditional land-based plants, yet rivals or surpasses them in efficiency, reliability and cost.

Want to know more? Click on the link: https://secureservercdn.net/160.153.137.210/d37.ba6.myftpupload.com/wp-content/uploads/2019/08/Gigajoule-Whitepaper-v8.pdf

Gigajoule (OP)
Copper Member
Newbie
*
Offline Offline

Activity: 69
Merit: 0


View Profile
September 12, 2019, 10:19:48 AM
 #4

⚡️Technology we use
 
Natural gas as a fuel for base load power generation is regarded as the cleanest of all carbon-based fuels. It is estimated that natural gas flaring associated with oil production expends far more natural gas than power generation.

The power generation technology proposed in this project is based on the use of aero- derivative gas turbines. Gigajoule Floating Solutions is an electricity generation company. It creates fully operational, gas-based power plants, floating on barges.

We have spent four years developing three project sites which are capable of immediate implementation, using the floating power plant technology on a bespoke basis. Each project is designed for a 528MW installation.The technology is best-of-breed utilizing the Siemens GT A65 (Rolls Royce Trent) 66MW gas turbine which is an aero-derivative engine with class-leading efficiency.

The turbine is coupled to a generator and modularized. Two modular power generation units are placed on a single barge. Four barges go into each project. The barges with all ancillary plant for the modular units, are built at a UK shipyard to the highest standards imposed by either of Lloyds, DNV or ABS.

The site works in-country, is undertaken by a large international corporate civil engineering contractor and includes the dry docks into which the barges will be placed, the gas connections to the feedstock supplier and the transmission line connection to the Federal evacuation yard.

We have a detailed economic model which confirms the efficiency, viability and profitability of the projects.

Learn more at our website: https://gigajoule.io/



Gigajoule (OP)
Copper Member
Newbie
*
Offline Offline

Activity: 69
Merit: 0


View Profile
September 13, 2019, 10:17:07 AM
 #5

⚡️GIGAJOULE TOKEN – what you need to know about our project token
 
GIGAJOULE (GIGJ) is a token issued to finance the implementation of  Gigajoule project through the initial exchange offering. It has a special innovative structure based on the security token model and gives its holders the right to participate in the project's profits on certain conditions.
 
GIGAJOULE TOKEN is not just a utility-token that can be exchanged for goods or services of the project in the future. It has much more in common with the security token and allows its owners to capitalize on the success of the Gigajoule project.
 
Owners of GIGAJOULE tokens will be entitled to receive annual dividends in the amount of 15% of the profits received within the Gigajoule project, in proportion to the number of tokens available to them.
 
 Do you want to learn more about  GIGAJOULE token? Please visit the official website of our project https://gigajoule.io/!

Gigajoule (OP)
Copper Member
Newbie
*
Offline Offline

Activity: 69
Merit: 0


View Profile
September 14, 2019, 11:10:54 AM
Last edit: September 15, 2019, 08:18:26 AM by Gigajoule
 #6

⚡️IEO-why did we decide to hold IEO?

IEO (initial exchange offering) is a token – based fundraising method similar in principle to ICO (initial coin offering).

However, there are a number of key differences between the two methods, such as:

At IEO, digital exchange manages the entire process from a technical point of view. Digital tokens are created in the launch panel of the IEO exchange, and the purchase of tokens is carried out through the exchange platform.

In IEO, the Fund-raising event is managed by the exchange, and in ICO-by the project team. The traditional ICO model involved the project team issuing tokens from the ICO Launchpad, selling the tokens, and then transferring (or attempting to transfer) the tokens to a listing on a digital exchange so that they were suitable for exchange. The new IEO model means that tokens are issued from the exchange's Launchpad, the token sale is managed by the exchange, and once completed, the token is guaranteed to be listed.

The issue of the tojen GIGJ through IEO instead of ICO has several advantages for investors – guaranteed listing, exchange of expertise, security procedures KYC and AML,  systematic way of carrying out pre-sale of the tokens and easy way to buy tokens.

Prior to the GIGJ token sale, a private token pre-sale will be held within the IEO. The expected start date of IEO is scheduled for November 1, 2019. The total duration of Gigajoule IEO project will be 20 days. GIGJ tokens can be purchased for Bitcoin (BTC) or Ether (ETH).

Read more about IEO of the project Gigajoule – on the website https://gigajoule.io/.


Gigajoule (OP)
Copper Member
Newbie
*
Offline Offline

Activity: 69
Merit: 0


View Profile
September 16, 2019, 01:21:12 PM
 #7

⚡️FAQ: 3 most commonly asked questions about the project

WHAT IS GIGAJOULE?

Gigajoule is a project that applies state of the art technology in the form of floating power electricity plants. Each floating power plant is mounted on a barge, and it is composed of two SGT-A65 aeroderivative gas powered turbines. The floating power plant has an electricity generation capacity of 132 MW. The technology behind Gigajoule floating power plants is provided by Siemens, and each project is made up of 4 barges with a total output of 528 MW.

WHAT PROBLEM IS GIGAJOULE TRYING TO SOLVE?

Gigajoule was born as an answer to the problem of electricity access, which affects millions of people worldwide, but its more acute in African countries. The current model of electrical generation in these countries makes use of a variety of power plants, many of which are economically and environmentally unsustainable however notwithstanding unsuitability, their aggregation is nowhere near able to meet the burgeoning demand for electricity. Gigajoule, is a fast track construction and deployment power generation system able to expand existing power generation capacities in developing and developed countries.

WHERE ARE THE FLOATING POWER PLANTS GOING TO BE ESTABLISHED?

The Gigajoule team has spent years making preparations of the implementation of the first three floating power plants in Nigeria. The selection of Nigeria as the first priority for the Gigajoule FPP solution was driven by an abundance of natural gas, an existing national transmission system and the support of the World Bank to underwrite the payment obligations of the Government to purchase the electricity produced under the Power Purchase Agreement. The first 3 projects will be executed in 3 different locations: Cross River State, Anambra State and Delta State. More projects are planned for Nigeria and other African, Middle Eastern, South East Asia and Central American countries as demand will remain unsatisfied for decades to come.

More information: https://gigajoule.io/

goodparty
Newbie
*
Offline Offline

Activity: 14
Merit: 0


View Profile
September 17, 2019, 07:21:28 AM
 #8

now the project looks very promising as there is a guaranteed demand for it. But I'm not sure that $ 10 million will be enough for such a project.
Elm0P2
Newbie
*
Offline Offline

Activity: 18
Merit: 0


View Profile
September 17, 2019, 08:16:29 AM
 #9

can you say what will be the cost of 1 kilowatt of electricity when using such a power plant ?
darkware
Newbie
*
Offline Offline

Activity: 14
Merit: 0


View Profile
September 17, 2019, 09:16:33 AM
 #10

as I understand in order to sell such services will need an agreement with the authorities of Nigeria and other countries. tell me, do you already have such agreements or are you negotiating on this issue ?
banipunz
Newbie
*
Offline Offline

Activity: 14
Merit: 0


View Profile
September 17, 2019, 10:11:51 AM
 #11

great project. at least we see a really useful business. and I am happy to support the team now if the amount of the minimum contribution will be small.
Gigajoule (OP)
Copper Member
Newbie
*
Offline Offline

Activity: 69
Merit: 0


View Profile
September 17, 2019, 11:09:42 AM
 #12

⚡️Do you know that electricity is the cornerstone for the growth and development potential of any country in the world?

According to statistics, today more than 2 billion people around the world do not have access to electricity, and this figure is increasing every day. In countries such as Nigeria, despite having a rich source of natural gas, less than half of the country's population has access to a stable electricity supply.

Many countries that have transmission systems use expensive and inefficient electricity replacement systems that have a negative impact on the environment and ruin the public budget, as their governments have to provide subsidies to their citizens to pay for electricity.

Gigajoule Floating Solutions is a company that deals with power generation. It creates fully managed gas-fired power plants floating on barges. In its work, the company uses proven technologies, the Internet of things (IoT) and blockchain technology to ensure the highest standards of quality and efficiency. This type of power plant takes longer to produce electricity than conventional ground-based plants, but has a great advantage in efficiency, reliability and cost.

Learn more about the current problem with electricity and how we want to solve it with the help of the project Gigajoule, on our OnePager: https://secureservercdn.net/160.153.137.210/d37.ba6.myftpupload.com/wp-content/uploads/2019/08/One-Pager-v7.pdf


cleotobias14
Newbie
*
Offline Offline

Activity: 17
Merit: 0


View Profile
September 17, 2019, 11:13:14 AM
 #13

are you planning a bounty program or an airdrop? I would like to participate and get my tokens now... .
Gigajoule (OP)
Copper Member
Newbie
*
Offline Offline

Activity: 69
Merit: 0


View Profile
September 17, 2019, 11:13:50 AM
Last edit: September 17, 2019, 11:53:52 AM by Gigajoule
 #14

now the project looks very promising as there is a guaranteed demand for it. But I'm not sure that $ 10 million will be enough for such a project.

Yes this is enough to implement two projects immediately. The reason we will be happy to achieve a higher result is that it will allow us to purchase an existing shipyard with skilled staff where we can have the barges built ourselves under Siemens direction. This will contribute to lower capital cost and more profitability in the long run. $10m-$40m is to find the pre-implementation phase of a debt structure that is worth approx. $700m per project

are you planning a bounty program or an airdrop? I would like to participate and get my tokens now... .

Stay tuned for our news and you will be one of the first to know about such events.

can you say what will be the cost of 1 kilowatt of electricity when using such a power plant ?

US&0.095/kWH (nine and a half US Cents )

as I understand in order to sell such services will need an agreement with the authorities of Nigeria and other countries. tell me, do you already have such agreements or are you negotiating on this issue ?
That is correct. We have a power purchase agreement with the Nigerian authorities. This can be found in our whitepaper.
In each case, once we have satisfied all in-country permitting plus licensing requirements, the government issues the Power Purchase Agreement which will enjoy credit enhancement support. This in turn then enables us to fund the projects using conventional debt packages. This is the stage we are at with these projects. Refer the white paper.

https://secureservercdn.net/160.153.137.210/d37.ba6.myftpupload.com/wp-content/uploads/2019/09/Gigajoule-Whitepaper-v9.pdf

araishkhan
Newbie
*
Offline Offline

Activity: 21
Merit: 0


View Profile
September 17, 2019, 12:09:28 PM
 #15

you said there would be dividends. please tell me how it will work when investors can get their reward?
hornet77730
Newbie
*
Offline Offline

Activity: 14
Merit: 0


View Profile
September 17, 2019, 01:04:21 PM
 #16

it all looks very global and I think that this business will be really in demand. I hope that the project will be implemented very quickly.
gunpal5
Newbie
*
Offline Offline

Activity: 14
Merit: 0


View Profile
September 17, 2019, 02:05:25 PM
 #17

have you already held any negotiations with Siemens on the supply of turbines ? won't that be a problem ?
gembeldolar
Newbie
*
Offline Offline

Activity: 16
Merit: 0


View Profile
September 17, 2019, 03:00:37 PM
 #18

on what exchange will and IEO and when ? and can I buy tokens now. Until this the best that I saw on this forum.
gembeldolar
Newbie
*
Offline Offline

Activity: 16
Merit: 0


View Profile
September 17, 2019, 03:59:53 PM
 #19

the possibility of receiving dividends pleases me. This is a good motivation for investors and for me personally.
Gigajoule (OP)
Copper Member
Newbie
*
Offline Offline

Activity: 69
Merit: 0


View Profile
September 18, 2019, 12:12:08 AM
 #20

you said there would be dividends. please tell me how it will work when investors can get their reward?

That is correct. Once the project starts declaring dividends, 15% of profits will go towards GIGJ token holders. ETH will be sent to a dividend smart contract that will in turn send a pro rata amount to each ETH wallet that is holding GIGJ. These dividends won't be calculated for a single plant installation, but rather on all the operational installations we have.


it all looks very global and I think that this business will be really in demand. I hope that the project will be implemented very quickly.

Thank you, so do we. It will take approximately 18 months to get the first project fully implemented. We have a detailed implementation roadmap on our website that breaks this process down.


have you already held any negotiations with Siemens on the supply of turbines ? won't that be a problem ?

Great question. Our engineers have worked with Siemens in the past and have a great relationship with them. Our contacts have assured us that supply will not be an issue.


on what exchange will and IEO and when ? and can I buy tokens now. Until this the best that I saw on this forum.

We are in final negotiations with exchanges at the moment. Because we are a security token that pays dividends, the listing process takes a bit longer but we are hoping to make an announcement within the next week or two finalizing the exchange. Our presale has started and you can secure your place by registering here https://forms.office.com/Pages/ResponsePage.aspx?id=vyKmi7x240SVYL4xK1J9F-SzBn4IsjxBhgoxfGjlVPlUNVBDRDBTMDJEOVlSWlJRMVNCSUdKUTlYSS4u. Our legal team in Malta have assured us that our company will be registered by the 23 September at which time we will supply you with a presale contract and instructions on how to invest.


the possibility of receiving dividends pleases me. This is a good motivation for investors and for me personally.

We are glad that you are pleased. It was our intention to create a real project, with real people, that provides real value with real profits!
Pages: [1] 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 »  All
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.19 | SMF © 2006-2009, Simple Machines Valid XHTML 1.0! Valid CSS!