I read most of this thread and many more sources, still, the available info seems to be quite shallow.
1)
http://driveshare.org/dataserv.html says 1099 TB available, still the 1 PB milestone is not reached?
2) The whole 1099 TB offered/stored data is testdata?
3) If I was to install the driveminer and give it 1 TB space, it would receive testdata until "Testgroup B" is finished?
4) "Testgroup B" will receive 1M SJCX when 1 PB is reached, which would get me 1k SJCX for 1 TB storage?
5) Obviously there won't be deoamd for 1 PB storage when Metadisk is released. So the reward will go to 1 SJCX per TB or the like?
6) So, would it work now for me? Dropping excess space into driveminer and receive SJCX? If I got the 10k SJCX as a ticket beforehand?
7) Any problem with first starting with an empty SJCX/BTC adress, testing stuff, and using a loaded SJCX adress later on?
Also, what's with
http://driveshare.org/status.html? Hard to believe 10 users are providing exactly 24.41 TB each?
There is remarkably little real-world-user-feedback anywhere online. I am sceptical, an elaborate scam would look exactly the same like this.
Ente