Bitcoin Forum
November 01, 2024, 11:35:56 AM *
News: Latest Bitcoin Core release: 28.0 [Torrent]
 
   Home   Help Search Login Register More  
Warning: One or more bitcointalk.org users have reported that they strongly believe that the creator of this topic is a scammer. (Login to see the detailed trust ratings.) While the bitcointalk.org administration does not verify such claims, you should proceed with extreme caution.
Pages: « 1 2 3 4 [5] 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 »
  Print  
Author Topic: [ANN] Technobit HEX8A1 -240 GHs Coincraft A1 board- Finished production  (Read 72423 times)
marto74 (OP)
Hero Member
*****
Offline Offline

Activity: 728
Merit: 500



View Profile WWW
January 20, 2014, 05:39:01 AM
Last edit: January 20, 2014, 05:53:57 AM by marto74
 #81

The board is working stable @ 90+ GHs ( about 30+ GHs per chip) 8-10 hours already

Here is the preliminary look of the miner with cooling


http://technobit.eu
tips : 12DNdacCtUZ99qcP74FwchaCPzeDL9Voff
vadoff
Member
**
Offline Offline

Activity: 84
Merit: 10


View Profile
January 20, 2014, 05:52:13 AM
 #82

Any idea on price and when units will start shipping?
zulover
Hero Member
*****
Offline Offline

Activity: 583
Merit: 500


View Profile
January 20, 2014, 07:22:53 AM
 #83

Will you be expanding it to 6 0 8 chips?
Zich
Legendary
*
Offline Offline

Activity: 1190
Merit: 1000


View Profile WWW
January 20, 2014, 08:39:17 AM
 #84

The board is working stable @ 90+ GHs ( about 30+ GHs per chip) 8-10 hours already

Here is the preliminary look of the miner with cooling



HOT  Cheesy
giorgiomassa
Full Member
***
Offline Offline

Activity: 222
Merit: 100



View Profile
January 20, 2014, 10:03:25 AM
 #85

The board is working stable @ 90+ GHs ( about 30+ GHs per chip) 8-10 hours already

Here is the preliminary look of the miner with cooling



Great achievement!!! Congratulations Cheesy
stiffla
Member
**
Offline Offline

Activity: 77
Merit: 10


View Profile WWW
January 20, 2014, 10:09:28 AM
 #86

The board is working stable @ 90+ GHs ( about 30+ GHs per chip) 8-10 hours already

Here is the preliminary look of the miner with cooling



Great Work Marto.

Question about the power supply.

Are you already able to tell if only one PCI-E 6 Pin is needed for one board?
I ask because I damaged my wires on my PSU and I need to replace them, but it is difficult to find a 6+2 replacement wire.


My android monitoring app for Slush's pool: BTCDroid 
https://play.google.com/store/apps/details?id=com.eiabea.btcdroid&hl=de
marto74 (OP)
Hero Member
*****
Offline Offline

Activity: 728
Merit: 500



View Profile WWW
January 20, 2014, 10:13:54 AM
 #87

The board is working stable @ 90+ GHs ( about 30+ GHs per chip) 8-10 hours already

Here is the preliminary look of the miner with cooling



Great Work Marto.

Question about the power supply.

Are you already able to tell if only one PCI-E 6 Pin is needed for one board?
I ask because I damaged my wires on my PSU and I need to replace them, but it is difficult to find a 6+2 replacement wire.


The design is with 2 PCI-E 6 pin conectors

http://technobit.eu
tips : 12DNdacCtUZ99qcP74FwchaCPzeDL9Voff
Jeffrey
Full Member
***
Offline Offline

Activity: 182
Merit: 100


View Profile
January 20, 2014, 10:31:44 AM
 #88

HMM
2 PCI-E plugs for 1 miner?
That kinda kills the idea of buying more and stacking them to a "tower" like we could with the previous ones. Well, it's still possible, but then we'd need more PSU's.
How much is the power usage on these current models? Any numbers you can share?
marto74 (OP)
Hero Member
*****
Offline Offline

Activity: 728
Merit: 500



View Profile WWW
January 20, 2014, 11:07:57 AM
 #89

Here it is stabele @ 90 + GHs

http://technobit.eu
tips : 12DNdacCtUZ99qcP74FwchaCPzeDL9Voff
Gator-hex
Hero Member
*****
Offline Offline

Activity: 490
Merit: 500


View Profile
January 20, 2014, 11:10:40 AM
Last edit: January 20, 2014, 12:36:33 PM by Gator-hex
 #90

I see a Sunon EE92251S3-000U-999 1.3W 2400RPM fan.

Hoping they don't need to stick the 4500RPM fans on it so it runs as quiet as the Hex16B!  Tongue

H/W errors look a lot better. Gratz on 30GH a chip.

What is the W/GH? I'd be interested to know if it beats 2xHex16B which are 120W at the board for 90GH

loshia
Legendary
*
Offline Offline

Activity: 1610
Merit: 1000


View Profile
January 20, 2014, 11:23:56 AM
 #91

HMM
2 PCI-E plugs for 1 miner?
That kinda kills the idea of buying more and stacking them to a "tower" like we could with the previous ones. Well, it's still possible, but then we'd need more PSU's.
How much is the power usage on these current models? Any numbers you can share?
Yeah when you need OC there is nothing you can do about it. Chip needs power dude:)

Please help the Led Boy aka Bicknellski to make us a nice Christmas led tree and pay WASP membership fee here:
https://bitcointalk.org/index.php?topic=643999.msg7191563#msg7191563
And remember Bicknellski is not collecting money from community;D
Gator-hex
Hero Member
*****
Offline Offline

Activity: 490
Merit: 500


View Profile
January 20, 2014, 11:26:37 AM
Last edit: January 20, 2014, 05:03:34 PM by Gator-hex
 #92

HMM
2 PCI-E plugs for 1 miner?
That kinda kills the idea of buying more and stacking them to a "tower" like we could with the previous ones. Well, it's still possible, but then we'd need more PSU's.
How much is the power usage on these current models? Any numbers you can share?
Yeah when you need OC there is nothing you can do about it. Chip needs power dude:)


Yeah I did try to talk Marto into using a single 8-Pin PCI-E socket. Everyone has 4x 6+2 power connectors these days on 1000W PSUs.

You can get 8-pin to 2x6pin converters but we'll have to see how much power it draws to know if they'd work or melt.

Destiffmast
Full Member
***
Offline Offline

Activity: 125
Merit: 100


View Profile
January 20, 2014, 11:28:02 AM
 #93

I used to run 5x hd6590 from one psu, they were power hungry but that 1200wat psu never failed a bit, sure you could use one of them to power 5 HEX8A1 :-)

Yeah I know you can,t stack them but maybe place them in a shelf all next to each other.
RoadStress
Legendary
*
Offline Offline

Activity: 1904
Merit: 1007


View Profile
January 20, 2014, 08:16:02 PM
 #94

What is the W/GH? I'd be interested to know if it beats 2xHex16B which are 120W at the board for 90GH


I'm waiting for this too so +1!

gusto88
Newbie
*
Offline Offline

Activity: 21
Merit: 0


View Profile
January 20, 2014, 10:35:31 PM
 #95

The board is working stable @ 90+ GHs ( about 30+ GHs per chip) 8-10 hours already

Here is the preliminary look of the miner with cooling
http://s27.postimg.org/rxjree3qn/20140119_191324.jpg http://s27.postimg.org/mpz6gugkv/20140119_191428.jpg http://s27.postimg.org/hora8kfov/20140119_191450.jpg

Nicely done. Alas, have you thought about different fan placing? Those two fans look really loud. Maybe something like an AntMiner S1 construction? Where the fan blows horizontal on the board and not from top and bottom?
Gator-hex
Hero Member
*****
Offline Offline

Activity: 490
Merit: 500


View Profile
January 21, 2014, 12:51:34 AM
Last edit: January 21, 2014, 01:20:37 AM by Gator-hex
 #96

The board is working stable @ 90+ GHs ( about 30+ GHs per chip) 8-10 hours already

Here is the preliminary look of the miner with cooling


Nicely done. Alas, have you thought about different fan placing? Those two fans look really loud. Maybe something like an AntMiner S1 construction? Where the fan blows horizontal on the board and not from top and bottom?

Agree, you just need some angle brackets,


and some metric spacers,


then you could mount a single fan blowing over both heatsinks and still be stackable.

erk
Hero Member
*****
Offline Offline

Activity: 826
Merit: 500



View Profile
January 21, 2014, 09:03:43 AM
 #97

The test board is ready
now waiting for the first sample chips to start tests
What's the eta on the sample chips?
Zich
Legendary
*
Offline Offline

Activity: 1190
Merit: 1000


View Profile WWW
January 21, 2014, 10:46:17 AM
 #98

260 GHs HEX8A1 Coincraft A1 miner pre production

SHIPMENT 10-th FEBRUARY

30 pcs pre-production run

http://technobit.eu/index.php?id_product=61&controller=product&id_lang=1
iFA88
Full Member
***
Offline Offline

Activity: 237
Merit: 100



View Profile WWW
January 21, 2014, 10:54:10 AM
 #99

Website is under maintenance. What is the price?

260 GHs HEX8A1 Coincraft A1 miner pre production

SHIPMENT 10-th FEBRUARY

30 pcs pre-production run

http://technobit.eu/index.php?id_product=61&controller=product&id_lang=1

Zich
Legendary
*
Offline Offline

Activity: 1190
Merit: 1000


View Profile WWW
January 21, 2014, 11:08:25 AM
 #100

Website is under maintenance. What is the price?

260 GHs HEX8A1 Coincraft A1 miner pre production

SHIPMENT 10-th FEBRUARY

30 pcs pre-production run

http://technobit.eu/index.php?id_product=61&controller=product&id_lang=1

About 1499 EUR
Pages: « 1 2 3 4 [5] 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 »
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.19 | SMF © 2006-2009, Simple Machines Valid XHTML 1.0! Valid CSS!