Makes perfect sense to me, we shut down 10 L3+'s about a week ago
I've still got 30 A4+ in the box, never made it to power up, and another 25 D3's got stuck with
And i'm not a person that can afford a low 6 figure mistake, credit eating me alive
* that's my whine story can someone call me a whambulance ........
yeah, back to my (hopefully wrong) theme on the Bitmain L3+ units
currently, I am at NEGATIVE -$0.21 USD per day! and
NEGATIVE -$6.29 USD a month, with my data hall electric and rent.
24 hours 0.02316153 LTC 2.48 USD 2.69 USD -0.21 USD
7 days 0.16213072 LTC 17.35 USD 18.82 USD -1.47 USD
30 days 0.69484592 LTC 74.35 USD 80.64 USD -6.29 USD
So, in order for me to say break even NOW at 0.00 USD a month after electric.
Swapping electric for LTC direct on
www.litecoinpool.org/calc I would need:
a price of LTC at the current difficulty of: $116.05 per LTC!
24 hours 0.02316153 LTC 2.69 USD 2.69 USD -0.00 USD
7 days 0.16213072 LTC 18.82 USD 18.82 USD -0.00 USD
30 days 0.69484592 LTC 80.64 USD 80.64 USD -0.00 USD
That is not looking too dang likely

IF I wanted to get say $1 a day at current difficulty, OVER electric costs,
which in the past was pretty modest for a Bitmain L3+ scrypt-pow miner,
I would need below $159.05 to make $29.88 per Bitmain L3+ per month, after electric...
24 hours 0.02316153 LTC 3.68 USD 2.69 USD 1.00 USD
7 days 0.16213072 LTC 25.79 USD 18.82 USD 6.97 USD
30 days 0.69484592 LTC 110.52 USD 80.64 USD 29.88 USD
Again, I just hope I'm wrong, but I don't think I can see things flipping in our favor this
fast, even if there is NO supposed new Bitmain product at the 1.5gh and 800-watt unit...
the above calcs, don't even work with existing Bitmain L3+'s in the world (85% of all pow scrypt miners still
up, IMHO) ...so unless brighter minds than me, can 'beat me up' on this (please, I wish to be dead wrong)
it all still looks like most if not all my (and perhaps most) Bitmain L3+'s will be shut down by July 4th, 2018.
Searing