Please tell me do you plan to work on the stock exchange or not ? Or crypto economy suits you quite well ?
Please see our road map and white paper.
Will the project need to obtain any licenses and patents ?
I like the perspective of this project and it will be cool.
Gigajoule is ready to implement three projects of 528MW each at various sites in Southern Nigeria, in close proximity to gas supply and electricity evacuation infrastructure.
Significant work has been completed at each of these sites to secure power generation licenses, confirmation of gas supply and electricity evacuation transmission studies. Additional work includes preliminary environmental approvals, floating plant and infrastructure design work, economic viability confirmation and the necessary precursor negotiations to secure the Power Purchase Agreement with the Federal Government.
Project funding is achieved by utilizing the following credit enhancements:
World Bank Partial Risk GuaranteeSiemens full Operating, Maintenance and Performance WarrantyLloyds of London Insurance
This amounts to over 1500MW installed capacity at a project cost of US$1.4bn (net) which is externally financed.
___________________________________________________________Siemens GT A65We have spent four years developing three project sites which are capable of immediate
implementation, using the floating power plant technology on a bespoke basis.
Each project is designed for a 528MW installation. The technology is best-of-breed utilizing the Siemens GT A65, a 66MW gas turbine which is an aero-derivative engine commonly known as the Rolls Royce Trent with class-leading efficiency.
Over 30 years of research and development have gone into this package! As far as the reliability of the technology is concerned, the SGT-A65 has a continuous operating life of 50,000 hours (6 years) after which (in under 72 hours) the core of the turbine is removed and replaced. As a result of this reliability and the quick change-over time, Siemens, is able to provide a guarantee that the generating sets will be available to operate for the equivalent of 95% of all the hours in a twenty-year period. It can also be extended up to forty years.
Siemens is Corporate Operator, which in turn, also provides operational performance guarantees of fuel efficiency and the availability to generate power for 95% of the ‘24/365’ hours for at least 20 years.
The SGT-A65 can provide base-load power both to national electrical grids and for industrial applications!
Read more - on our website
https://gigajoule.io/.