Once the chip testing is complete and verified, the remaining chips are sent to our Chicago facility for mounting on Monarch boards.
Heehehe.
At this stage, we will receive the first live Monarch board in our shop in KC a day or two later and we will begin the process of finalizing the firmware and testing out all facets of the board.
Hooohooohahha.
Amazing. What will that take?
2 more months? They have to package the chips and test them still. Holy crap.
At that point, we will begin assembling the delivery units and start shipping the Monarch shortly after that. Right now, we hope to start shipping the first Monarchs out the door at the very earliest at the very end of January or beginning of February,
This guy is lying. Straight up. Let us give them an error free run and do the numbers. They don't even have a packaged chip yet and he is saying they will have working units at the end of January or early February. Haven't we seen this exact text word for word somewhere before?
--------------
Did anyone add up the weeks?
OCTOBER 16th SNAPSHOThttps://web.archive.org/web/20131016052212/https://products.butterflylabs.com/homepage-new-products/300-gh-bitcoin-mining-card.htmlHere's a breakdown of the timeline.
Foundry production takes 10 weeks
Bumping, Slicing & BGA packaging takes approximately 2 weeks
Initial shipments begin and ramp up to full capacity over the following 3 weeks
Since this is our 2nd generation ASIC chip, we're free from the pitfalls sometimes associated with a first generation design. Testing systems, Bumping masks, Substrates & under fill engineering are all carryovers from our last version of the chip, so they're ready for high volume production once the wafers are ready. The importance of this can't be overstated when considering schedule certainty. Nevertheless, please do not purchase this product if you are unwilling to wait for the product to complete its development.
+ 10 weeks foundry complete? No not quite. Chip packaging and testing so... 3 to 5 weeks?
+ 3 - 5 weeks to fabricate and get a reasonable number shipped.?
So let us add that up:
Let us give them an 8 week window, not 6 but not 10, that is two more months of Winter.
January, February, Mid March... if they are lucky and they won't be. There will be HUGE issues with cooling and those water blocks won't cut it.
So... 300 GH/s at $2800 delivered in Mid March or most likely a lot later for anyone ordering today at the cheaper price?
That is over $9 gh/s for the card not including psu, casing, hosting and our favorite EXPEDITED shipping, in Mid March if you were first to order or "upgraded".
Magic Eightball at the Genesisblock says
http://thegenesisblock.com/mining/a/9cfe6df245LOSSES.
For example, in order to deploy 18 TeraHash into a single data center cabinet, you would need 30 Monarch cards. Each 3 fit nicely into a standard 4U rackmount enclosure with a basic motherboard & ATX power supply unit. 10 of these will fill an entire cabinet with no wasted space. It will also consume exactly the standard power and cooling capacity provided for a cabinet at most data centers.
Ooops forgot all the extras... More losses.